Engineering professional with proven ability to innovate and solve complex technical challenges with more than 5 years in infrastructure and Railway industry. Known for delivering high-quality solutions and driving team success through effective collaboration and adaptability.
Overview
9
9
years of professional experience
15
15
years of post-secondary education
11
11
Certifications
2
2
Languages
Work History
Civil Interface Engineer/Civil Team Lead
Siemens Mobility
Cairo
12.2021 - 06.2025
Coordinate civil interfaces with Siemens system scope (Power Supply, Signaling, Telecom, MEP).
Lead interface control process to ensure the full alignment to the technical specs while elaborating the design documents.
Perform site surveys to observe obstacles.
Reviewed cost to complete reports, price escalation application and suppliers' claims.
Preparing installation drawing for track elements and wayside coordination.
Lead technical meetings with CVW subcontractors.
Coordinate with Customer and the Consultant to acquire the design approvals.
Support site and handle technical RFIs and FCNs.
Regular site visits to follow up on work progress and prepare daily/monthly reports.
Deliver all the requested design and as-built drawings in time.
Report to the Engineering Management and Project Management.
Apply the Local and international Standards.
Modernization of signaling Interlocking system on the Benha - Portsaid Line with 220KM.
Lead the civil engineering supervision for project activities.
Manage and oversee the execution of major infrastructure projects, ensuring design integrity, constructability, and adherence to project timelines and budgets.
Supervise and mentor junior engineers and project staff, ensuring the effective delivery of high-quality work.
Collaborate with multidisciplinary teams to integrate civil works within broader railway network designs.
Oversee the technical aspects of the design, focusing on geotechnical, structural, drainage, and transport elements critical to the functionality.
Produce daily, weekly, and monthly progress reports, as well as Key Performance Indicators (KPIs) for significant trades and activities.
Quickly identify and report any critical issues affecting work progress to the Project Management team.
Build and sustain professional relationships with internal and external partners to enhance project execution and minimize conflicts.
Lead initiatives for sharing knowledge within the project team, seeking best practices for optimal delivery.
Technical Office Engineer
CREC-AVIC INTERNATIONAL CONSORTIUM
Cairo
09.2019 - 11.2021
Studying the project (design drawings, RFI'S), preparing shop drawings and BBS and revising them.
Coordinating with ARCH, Mechanical and Construction Engineers.
Solving any unexpected technical difficulties, and other problems that may arise during construction.
Weekly Meetings with Sub-Contractors To solve any technical issues or Inquires.
Participate in solving/reporting any unexpected technical difficulties, and other problems that may arise during construction to the Technical Office Manager for discussion and proper solve.
Lead technical meetings with CVW subcontractors.
Coordinate with Customer and the Consultant to acquire the design approvals.
Deliver all the requested design and as-built drawings in time.
Report to the Engineering Management and Project Management.
Apply the Local and international Standards.
10th of Ramadan Light rail Transit. Project consists of: 19 LRT Stations, Tunnels, LRT bridges, Cars Bridges, 29 DEPOT workshops for LRT Maintenance, with cost of (1.4 Billion USD)
Technical Office Engineer
INDUSTRIAL CONSTRUCTION&ENGINEERING COMPANY (SIAC)
El Alamin
05.2018 - 08.2019
Company Overview: El-ALAMIN INTERNATIONAL UNIVERSITY, the project consists of (3 PHASES) with a cost of (2 billion Egyptian pound)
Studying the project (design drawings, RFI'S), preparing shop drawings and BBS and revising them.
Coordinating with Surveying, Mechanical and Construction Engineers.
Solving any unexpected technical difficulties, and other problems that may arise during construction.
Participate in solving/reporting any unexpected technical difficulties, and other problems that may arise during construction to the Technical Office Manager for discussion and proper solve.
El-ALAMIN INTERNATIONAL UNIVERSITY, the project consists of (3 PHASES) with a cost of (2 billion Egyptian pound)
Technical Office Engineer
CONCORD FOR ENGINEERING AND CONTRACTING
Cairo
09.2016 - 06.2018
Company Overview: The project consists of (5 Administrative Buildings with height of 10 floors, Convention Hall, MOSQUE, AND VILLA) with a cost of (5 billion Egyptian pound)
Technical Office Engineer, Shop drawing, Bill of Quantity (Sep 2016- May 2017).
Site Engineer, replacing old sewage Culvert using Pipe jacking PVC pipes and TPM Machines, building orchards from Al-Ameraya sewage station to pump station (September 2016- jan.2017).
The project consists of (5 Administrative Buildings with height of 10 floors, Convention Hall, MOSQUE, AND VILLA) with a cost of (5 billion Egyptian pound)
Education
Bachelor of Engineering - Civil Engineer, Structural Department
Ain Shams University (ASU)
Cairo, Egypt
04.2001 - 01.2016
Skills
Construction oversight
undefined
Certification
Project Management Professional (PMP), 2023-12-01
Military Status
Exempted
Cellular Phone
+971521611299
Timeline
Civil Interface Engineer/Civil Team Lead
Siemens Mobility
12.2021 - 06.2025
Technical Office Engineer
CREC-AVIC INTERNATIONAL CONSORTIUM
09.2019 - 11.2021
Technical Office Engineer
INDUSTRIAL CONSTRUCTION&ENGINEERING COMPANY (SIAC)
05.2018 - 08.2019
Technical Office Engineer
CONCORD FOR ENGINEERING AND CONTRACTING
09.2016 - 06.2018
Bachelor of Engineering - Civil Engineer, Structural Department