Over 24 years of experience in On-shore / Off-shore projects in the field of EPC Contract activities of Marine Projects, Oil & Gas, Petrochemical, industrial plants, marine shipyard and marine terminals with strong emphasis on Environment, safety, quality, time and Profitability
March. 2022 till Now: Trojan General Contracting LLC
Current Project: Das Island Residential Development Project
Owner / Client: ADNOC Civil Department / ADNOC Offshore
Job Title: Project Manager
Scope: DIRD Project is EPC contract which is an integral part of the overall development of Das island 2028 ADNOC Vision of New Accommodation whereby the Project is the Phase-1 of the Das Island Residential Development (DIRD) which includes the Senior Staff
Accommodation10 Building G+5 typical floor, Junior Staff accommodations 10 Building G+5 typical floor, Worker’s accommodations 10 Building G+3 typical floor and the relevant
Amenity buildings, external works, utility plants, and infrastructure.
Pursuant to the plan, all the Construction are Managed through a specialized Major Contractors to undertake completion of construction as per the Project plan.
Project Value: USD 550 Million
March. 2022 till July 2023: TARGET Engineering Construction Company L.L.C Abu Dhabi
Current Project: Dalma Gas Development Package B (DGD Package B )
Owner / Client: ADNOC Offshore
Job Title: Marine Project Manager / Project Operation Manager
Scope: DGD Project Package B is EPC contract which is an integral part of the overall development untapped hydrocarbon reserves, with priority given to produce 340 MMscfd of raw gas from Satah, Hair Dalma and Bu Haseer fields by 2024. The DGD project development shall comprise of onshore facilities on Arzanah Island (PKG-B) to export gas to Habshan and export condensate to Zirku Island.
Project Value: USD 450 Million
Nov. 2019 till Now: TARGET Engineering Construction Company L.L.C Abu Dhabi
Current Project: West Heat Recovery Project (WHRP)
Owner / Client: ADNOC Refinery
Job Title: Project Manager
Scope: SWI Channel 2 Dredging, outfall Pipe Including Subsea Pipe Installation and Some Civil Infrastructure Activities
Project Value: AED 42 Million
Nov. 2018 till Oct 2019: TARGET Engineering Construction Company L.L.C Abu Dhabi
Project: Marsa Al Arab – Reclamation Work Phase 1Project
Owner / Client: Dubai Holding-
Job Title: Project Manager
Scope: Demolishing of JBH Existing Marina & Construction New Land Reclamation & Break Water (Phase One)
Project Value: AED 79 Million
May 2017 Till Aug. 2018: TARGET Engineering Construction Company L.L.C Abu Dhabi
Current Project: Barakah Nuclear Power Plant Sonar / Unit 3 & 4 Cofferdam Removal and Revetment Construction, Abu Dhabi, UAE
Owner / Client: Emirates Nuclear Energy Corporation / Kepco
Job Title: Project Director
Scope: Unit 3 & 4 Cofferdam Removal and Revetment Construction Marine Work
Responsibilities:
· Prepare and arrange the project execution budget
· Prepare and arrange the project execution with respect of environmental aspect
· Lead and manage the civil and marine execution construction and commission activities to ensure safe, quality and timely execution of works in accordance with the contractual obligations.
· Recruit the project key persons
· Procurement all the equipment and the project material
· Organize the project’s execution plan and activities in order to achievement of project completion as per the schedule.
· Plan, schedule the WBS and assign the daily, weekly and monthly work for several crews and ensure that engineers and supervisors are observing all safety standards, observe hours of work and productivity also rest periods, maintain work efficiency, complete jobs on time.
· Close monitoring for the critical activity
· Work out with the client for the project close out and close all the commercial
· Prepare Mobilization and demobilization schedule for the necessary material, tools and equipment needed for erection, testing and pre-commissioning.
Project Value: AED 75 Million
From March 2017 Till Nov. 2017: TARGET ENGINEERING CONSTRUCTION COMPANY LLC, ABU DHABI, UAE
Job Title: Project Manager
Current Project: Barakah Nuclear Power Plant – BSI Sonar Installation
Client: Emirates Nuclear Energy Corporation (ENEC).
Main Contractor: Atlas Security, P.O Box: 112352, Abu Dhabi
Project Scope: The BNPP – BSI Sonar Installation involves the installation of 3 Sonar Heads and associated laying of iron conduit and cabling to allow monitoring of activity in the intake and discharge channels at the Barakah Nuclear Power Plant. The scope of works covers the installation of 3 sonar heads from OCA Wall to Intake Sonar Head West and Intake Sonar Head East and from Junction Box to Discharge Sonar Head.
Project Value: AED 11 Million
From Dec. 2016 Till 20 Fab 2017: Barakah Nuclear Power Plant, Marine Barrier
Job Title: Project Manager
Client: Emirates Nuclear Energy Corporation (ENEC).
Main Contractor: HALO Maritime Defense Systems
Project Scope:
Assembly. Transportation & Installation of Hallo Marine Barrier (900 Meter) and Mooring System. Installation of 640 tons of Concrete anchor and 3 kilometer anchor chain.
Project Value: AED 10 Million
From May 2016 Till 30 Nov. 2016: Bridge Extension - Umm Lafaina Island
Job Title: Project Manager
Client: Department of Transport, Abu Dhabi
Project Scope: Construction of 35 No's Pile (914 m Dia). Construction of Offshore Pile Heads. Construction of Piers.
Responsibilities:
· Prepare and arrange the project execution budget
· Lead and manage the civil and marine execution construction and commission activities to ensure safe, quality and timely execution of works in accordance with the contractual obligations.
· Organize the project’s execution plan and activities in order to achievement of project completion as per the schedule.
· Plan, schedule the WBS and assign the daily / weekly work for several crews and ensure site engineers and supervisors are observing all safety standards, observe hours of work and productivity also rest periods, maintain work efficiency, complete jobs on time.
· Close monitoring for the critical activity
· Monitoring of pre commissioning and commissioning stage of the project to ensure smooth and proper Hand over to client.
· Prepare Mobilization and demobilization schedule for the necessary material, tools and equipment needed for erection, testing and pre-commissioning.
Project Value: AED 16 Million
From May 2015 till May 2016: Civil and Marine Works for New Artificial Island at Hail Field Development – Project No. 10092
Job Title: Project Manager
Client: Abu Dhabi Oil Company Ltd. (ADOC)
Main Contractor: National Marine Dredging Company (NMDC)
Project Scope: The purpose of this project is to reclaim Hail Site Terminal (HST) and dredge the existing channel to provide sufficient access for the Company equipment to begin exploitation of the Hail Field.
Scope of works include:
Construction of 985m rock revetment, Installation of 24 of 40” steel drilling tubes, Construction of 350m sheet pile quay wall, concrete capping beam and the accompanying tie back system, Installation 4 75Trig mooring bollards with supporting structure, Installation of quay furniture, Construction of concrete disposal pits & associated trenches, Installation of pavement slabs and associated curbs, Procurement & installation of 27 navigational buoys including the removal and disposal of the existing navigational buoys, Construction of a Heliport with all associated works etc
Responsibilities:
· Prepare and arrange the project execution budget
· Prepare and arrange the project execution with respect of environmental aspect
· Lead and manage the civil, mechanical and marine execution construction and commission activities to ensure safe, quality and timely execution of works in accordance with the contractual obligations.
· Organize the project’s execution plan and activities in order to achievement of project completion as per the schedule.
· Resolve any schedule delays and apply methods for recovery of progress to maintain the overall project base line schedule.
· Plan, schedule the WBS and assign the daily / weekly/ Monthly work for several crews and ensure the engineers and supervisors are observing all safety standards, observe hours of work and productivity also rest periods, maintain work efficiency, complete jobs on time.
· Study and resolve all geotechnical issues and propose the most appropriate solutions
· Review and approve Lifting & rigging studies preparations for Critical Heavy Weightlifting.
· EPC for temporary causeway and jetty to facilitate the mobilization of the equipment, materials, rock
· Make sure the handover of the island reclamation area is correct and on time as per the schedule
· Close monitoring for the critical activity of the quay wall sheet pile and rock revetment work
· Monitoring of pre commissioning and commissioning stage of the project to ensure smooth and proper Hand over to client.
· Prepare Mobilization and demobilization schedule for the necessary material, tools and equipment needed for erection, testing and pre-commissioning.
Project Value: AED 139 Million
From April 2014 Till April 2015: Aqaba New Liquefied Petroleum Gas Terminal
Job Title: Project Manager
Client: Aqaba Development Corporation
Main Contractor: Butec SAL- Ahmad Yousef Al- Tarawneh & Partner
Project Scope: Detailed design of jetty structures and construction of LPG jetty and access trestle and rock revetment
Responsibilities:
· Prepare and arrange the project execution budget
· Prepare and arrange the project execution with respect of environmental aspect
· Lead and manage the mechanical and marine execution construction and commission activities to ensure safe, quality and timely execution of works in accordance with the contractual obligations.
· Organize the project’s execution plan and activities in order to achievement of project schedule.
· Resolve any schedule delays and apply methods for recovery of progress to maintain the overall project base line schedule.
· Plan, schedule the WBS and assign the daily / weekly work for several crews and ensure site engineers and supervisors are observing all safety standards, observe hours of work and productivity also rest periods, maintain work efficiency, complete jobs on time.
· Review and approve Lifting & rigging studies preparations for Heavy Weightlifting.
· Controlling Fabrication workshop of over 1,000 tones steel structure
· Managing of pre commissioning and commissioning stage of the project to ensure smooth and proper Hand over to client.
· Prepare Mobilization and demobilization schedule for the necessary material, tools and equipment needed for erection, testing and pre-commissioning.
Project Value: AED 75 Million
From Sep 2012 till April 2014: EMAL Phase II – Green Anode Plant and Butts Crushing Works, Taweelah, Abu Dhabi
Job Title: Project Manager
Client: Emirates Aluminium Company Limited (EMAL)
Main Contractor: Outotec GmbH
Project Scope: Mechanical works for the EMAL Green Anode Plant and Butts Crushing equipment installation
Responsibilities:
· Lead and manage the execution of the project activities to ensure safe, quality and timely execution of works in accordance with the contractual obligations within the Project Budget
· Organize and review the execution plan and activities in order to achievement planned schedule.
· Resolve any schedule delays and propose methods for recovery of progress to maintain the overall project base line schedule.
· Plan, schedule the WBS and assign the monthly work and ensure the project departments, site engineers and supervisors are meeting all HSE standards, QA/QC standard rules and observing productivity of the different crew, maintain work efficiency, complete jobs on time.
· Controlling Fabrication workshop of over 100,000-inch diameter of shop welding for different material grades (Carbon steel, Alloy steel, stainless steel and super duplex).
· Manage the pre commissioning and commissioning stage of the project to ensure smooth and proper Hand over to client.
· Prepare and request necessary material, tools and equipment needed for erection, testing and pre-commissioning.
Project Value: AED 25 Million
From Jan. 2011 tell Sep. 2012: Structural , Mechanical and Piping Works (East Area) GASCO Train 4
Job Title: Mechanical Construction Manager
Client: GASCO
Main Contractor: PETROFAC - G S ENGINEERING JOINT VENTURE
Project Scope: The project involves Construction of mechanical works(Structure, Mechanical and Piping works), Pre-commissioning and Commissioning assistance works, Provision, Operation and Maintenance of All temporary Site Facilities, mechanical completion and pre-commissioning of the plant
Responsibilities: · Lead and manage the execution of the project activities to ensure safe, quality and timely execution of works in accordance with the contractual obligations within the Project Budget
· Organize and review the execution plan and activities in order to achievement planned schedule.
· Resolve any schedule delays and propose methods for recovery of progress to maintain the overall project base line schedule.
· Plan, schedule the WBS and assign the monthly work and ensure the project departments, site engineers and supervisors are meeting all HSE standards, QA/QC standard rules and observing productivity of the different crew, maintain work efficiency, complete jobs on time.
· Controlling Fabrication workshop of over 100,000-inch diameter of shop welding for different material grades (Carbon steel, Alloy steel, stainless steel and super duplex).
· Manage the pre commissioning and commissioning stage of the project to ensure smooth and proper Hand over to client.
· Prepare and request necessary material, tools and equipment needed for erection, testing and pre-commissioning.
Project Value: AED 346 Million
From February 2009 to Dec. 2010: SNC Lavalin / Worley Parsons
Job Title: Senior Mechanical Engineer
Client: Emirates Aluminium Company
Main Contractor: SNC Lavalin / Worley Parsons
Project Scope: Installation Temporary Facilities like temporary Electrical Cabling, Storage for free issued materials. Engineering services for detailed design of Wet Pipe Sprinkler System including fire hose real connections. Fabrication and installation of A/G piping for Compressed Air, Natural Gas, Potable Water, Fire Protection(firefighting) Systems, Equipment structural erection, Ducting etc.
Responsibilities:
· All the erection and the fabrication shops for the Silo farm (Alumina & Coke) work, gantry, conveyers and ship un-loader
· All site mechanical construction activity and modification inspection
· All HVAC and plumbers work site Activity for non-process Building and review design
· Bas bar construction and welding inspections for the rectifier area
· Control all the work in cast house and compressor house building
· All site steel structure, roof and wall cladding work
· All piping work for above and underground (sea water, firefighting, nature gas)
Project Value: USD 6.5 Billion
From Nov. 2006 to Feb. 2009: TECNICAS REUNIDAS GULF LTD
Project Name: Petro Rabigh Refinery in Saudi Arabia
Job Title: Mechanical Senior Project Engineer & Deputy Commissioning Manager
Client: Saudi ARAMCO
Responsibilities:
· Review the erect ability and the availability of the steel structures elements. & Reservoirs (ammonia & water)
· Review the IFC Dwg. Further for any problems before start the erection
· Review the erection Dwg. Further for the erection process
· Controlling any modification in the structures and preparing modification packages and the control sheet for it
· Supervise and receive the equipment internals, to review if it is completed (no shortage, no damage)
· Make the preparation for internals erection and the method statements for each equipment
· Pre-commissioning and commissioning of the equipment (static & rotating) for revamping area
· Internal installation for static equipment (Vacuum Tower, Reactors, sour water stripper, etc.)
· Prepare daily and weekly progress status for the steel structures and the equipment, its internals and Reservoirs Construction Progress
· Construction for (rotary & reciprocating) pumps
· Pre-commissioning and commissioning for static and rotating equipment
· Punch list making and clean the client punch list
· Operation for the Sulphur recovery units
From Feb. 2006 to Oct. 2006: JGC ME FZE COMPANY
Job Title: Static Equipment and Machinery Senior Engineer / Supervisor
Project Name: Ras Laffan Gas Processing and Compression Facilities Dolphin Project in Qatar
Client: Dolphin Energy
Responsibilities:
· Supervise the assembly and erection of the gas turbines, pumps and vessels in the exporting unit
· Supervise and controlling the modification of the steel structure support for the piping of the compressors and the gas turbines the air intake units.
· Prepare daily and weekly progress status
· Prepare equipment erection plan.
· Supervise the static and rotating equipment alignment
From July 2004 to January 2006: BONATTI LTD. COMPANY
Job Title: QC. /QA & Mechanical Coordinator and Superintendent Mechanical Engineer
Project Name: Western Libya Gas Project - NC-41 Mellitah Onshore Plant
Scope: NGL Fractionation, Tail gas Treatment, Incineration, Sulphur Degassing & Amine Storage Units (3 Train and its Utility)
Responsibilities:
· Inspection of all steel structure (RACKS, STRNC, PLTF, MISC.)
· Inspection of all arrived equipment (stationary & rotating) looking of any nonconforming situation.
· Check the machinery preservations during storing time and after installation
· Controlling of all sit mechanical inspection for all the stationary equipment (towers & vessels & filter) external and internal
· Controlling of all sit mechanical inspection for all the rotating equipment (pumps & combustion air fans & compressors… etc.)
· Quality control for all the (towers & vessels) internals
· Quality control for the Thermal incinerator and Thermal reactor waste heat boilers
· Controlling for all site mechanical modification for (equipment & steel structures)
· Mechanical Coordinating Engineer between the (civil, piping, insulation, painting and electric) departments
· Mechanical Construction Superintendent and Inspection Engineer for the Amine storage tanks
· Responsible for mechanical completion for all the (stationary & rotating) equipment
· Closing all punch items related to any equipment and any steel structure.
· Pre-commissioning and handover engineer for both (stationary & rotating) equipment.
· Commissioning of all rotary equipment
· Periodical maintenance required for (rotary & static) equipment.
· Handover all the related equipment to every system in Bonatti area
· Corrective maintenance for rotary equipment.
EARLIER PROJECT DETAILS CAN BE PROVIDED UPON REQUEST