A registered civil engineer experienced in managing large scale infrastructure, industrial, oil& gas projects across Africa and the Middle East. Over 18 years of experience managing global teams of 5-20 people. Core skills include extrapolating data and
providing actionable insights, on-site experience in planning, estimation, cost control, variations, subcontractor management, technical support to field supervision, liaison with clients, monitoring and reporting on progress, producing technical reports, in-depth knowledge in quality control and quality assurance including final documentation handover, detailed attention to Health Safety and Environment, mentoring site engineers and people skills. With my advanced knowledge in Scrum, a great ability has been developed to remove impediments from my teams and deliver a customer-centric project
Project: Etihad Railway Project (Package 2C, Dubai)
Projects description – Infrastructure and building construction, consisting of – upper floor offices, lower floors - operations control rooms, laboratories, etc involving the use of curtain walls, glass-reinforced concrete(GRC), acoustic covering for slabs/walls, acoustic baffles, wall vinyl covering, glazed partitions, raised access flooring, carpet/ceramic/marble tiling, etc., for Emirates Global Aluminum (EGA), Asphalt road construction,potable/sewerage/storm water network for Operations Management Center project.Concrete Packages II project-Equipment foundations and utilities including precast works.
Projects description:
Ruwais Refinery Expansion Project -Managed the field quality control for EPC3,5 & 6 civil works packages reporting to the PMC Quality Manager
Khalifa Port and Industrial Zone Projects - Industrial Zone area A of the Khalifa Port and Industrial Zone (KPIZ} Abu Dhabi. I supervised parts of contractor Habtoor Leighton Group's scope of work in KPIZ which included:12 million cubic meters of earthworks, 18 kilometers of three, four, five, and six-lane dual carriageways, four bridges, 39 major services culverts and bridges, Seven kilometers of mechanically stabilized earth (MSE) walls, 31 kilometers of electrical reticulation, 39 kilometers of telecommunications distribution, 90 kilometers of pipelines.
Project details:
11kv and 33kv lines re-routing works, instrumentation, switches, and terminals installation inspection-Train 6 location around the footprint of planned Train 7+ works
NLNG TRAIN 7 + pre-F.I.D Projects(Consultancy on behalf of Technical Advisor to NLNG (Shell Global Solutions,The Hague); Site Preparation (drainage, plant roads), Offshore dredging and Hydraulic Fill – 84 million euros approx.Onshore and Nearshore Soil Investigation – US$ 5 million LNG Preload Contract–US$25milllion, SoilInvestigation by Coffra/NW DM/Boskalis
Projects:
Quay Wall Construction/Channel Dredging for NLNG/Shell/ ExxonMobil
Calabar River Dredging project (joint with Jan de Nul)
Projects:
Construction of internal asphaltic and cement concrete roads
OGGS (Offshore Gas Gathering System) and Infrastructure Work from Bonny to Forcados –ADAMAC (main contractor) wellhead, flowline, manifold and modification of Central Processing Facility - Shell Petroleum Development Company of Nigeria(client)>US$200million)