Summary
Overview
Work History
Education
Skills
Maritalstatus
Personal Information
Languages
Timeline
P.B. Ravishankara

P.B. Ravishankara

Electrical ingineer

Summary

Application for the post of Suitable position in your esteemed organization. Experienced Site Engineer with [Number] years of experience managing multiple simultaneous responsibilities to foster construction project completion. Well-organized planner and problem-solver versed in site preparation and day-to-day management.

Overview

29
29
years of professional experience

Work History

Site Engineer

Engineering Consortium Consulting Engineers (ECCE)
10.2023 - Current
  • Ensure implementation of company IMS policy and objectives at Project level.  Responsible for the Health, Safety and Environmental (HSE) issues on the specific project site.
  • Review the DAS & MAS logs of the project.
  • Review / approve all Method Statement for installation and testing/ commissioning for Electrical Systems.
  • Review / approve Material Submittal in accordance with project specification for Electrical equipment.
  • Review / approve shop drawings in accordance with contract documents & site condition for Electrical.
  • Monitor engineering work progress (Material Submittal & Shop drawings) in-line with DAS & MAS schedule for electrical.
  • Attend technical and progress meetings with Client, Contractor & Sub-contractor.
  • Ensure with project administration team to maintain logs / record of all the deliverables and documents, i.e. NCRs, surveillance reports, site instructions, etc.  Coordinate with site supervisor / inspector to facilitate correct documentation for inspection.
  • All energy consuming devices / equipment’s i.e. lighting, motor, air conditioners etc. shall be minimum complying with ASHRAE 90.1.
  • Conduct routine site visit to ensure the work carried is in-line with the requirements in coordination with the site supervisor / inspector.
  • Respond to technical queries of the contractor.
  • Issue NCRs to the contractor if the Material and/or installation found not in line with project requirement & contract documents in coordination with site supervisor / inspector.
  • Review payment certificates / variations in coordination with the Project QS.
  • Witness testing and commissioning activities.
  • Coordinate with site supervisor / inspector to issue snag list to the contractor.
  • Review & verify the Operation & Maintenance Manuals.
  • Review / approve the as-built drawings in coordination with site supervisor / inspector

MEP Manager

ADANI GROUP
2 2022 - 07.2023
  • Managed, monitored, and recorded weekly look ahead plan for resource and progress
  • Oversaw subcontractors and ensured compliance with Adani processes
  • Managed procurement of subcontractors' packages
  • Monitored and audited MEP installation works
  • Responsible for managing, monitoring, and sequencing subcontractors in line with program requirements.

Senior Electrical Engineer

DUNERS SDN BHD. Engineering Consultants
10.2011 - 11.2021
  • Handled various projects including First Emporium Shopping Mall & Supermarket, Sekolah Menengah Arab Kampong Rimba School project, G+12 units 6 story Apartment Building, G+14 units 7 story Apartment Building, Indonesian Embassy, Bangunan Baru Pejabat (G+ 4 Office Building), Hal Ehwal Ugama Temburong, Proposed Renovation of Single Officer Living Quarters at officer mess, Proposed Calcium Carbonate Powder Processing Factory, Proposed 4 unit's 3-Story Shop Houses at Block- A, BSP Solar HQ Project at seria, Negara Brunei Darussalam, Refurbishment of sewerage vacuum system, Repair works of mechanical and electrical system for sewerage, Pumping station mps - 20, Gadong catchment
  • Responsible for design review, onsite construction supervision, approval of contractor's shop drawings, cable management system, material submittals, method statements, inspection test plan, O & M Manuals, as-built drawings, and inspecting & approving contractors' installations.

Electrical Inspector

W/S ATKINS
- 03.2011
  • Inspected contractor quality control program, monitored contractor compliance with contract documents and electrical codes, supervised electrical installations, reviewed and approved contractor shop drawings and material submittals, liaised with client and contractor representatives, attended progress and coordination meetings, inspected materials and equipment, issued non-conformance reports and replied to contractor's requests for information, reviewed design changes, and ensured work was carried out as per contract specifications.

Electrical Inspector

W/S ATKINS
06.2006 - 03.2009
  • Monitored contractor quality control program, supervised electrical installations, reviewed and approved contractor shop drawings and material submittals, liaised with client and contractor representatives, attended progress and coordination meetings, inspected materials and equipment, issued non-conformance reports and replied to contractor's requests for information, reviewed design changes, and ensured work was carried out as per contract specifications.

Project Engineer

M/S Zener Steward Electro mechanicals. (M & E Contractor)
05.2005 - 05.2006
  • Managed the Golf Clubhouse & 23 villas project for Emmar Properties
  • Responsible for planning, execution, supervision, and quality assurance of various construction activities
  • Handled project coordination and documentation, obtained approvals for variations, prepared job status reports and progress reports, managed procurement of materials, coordinated with clients and consultants, and reviewed sub-contractor's invoices and claims.

Project Manager

M/S Micron Electricals. (Electrical Contractor)
06.2004 - 03.1998
  • Managed various projects including Suhas Park, Bell ceramic Ltd, Prestige Emerald Lavely Road, Surya I.T
  • Park – II, and Biocon (India) Ltd
  • Responsible for handling complete site work, estimation, costing, budgeting, project cost analysis, preparation of material submittals and method statements, coordination with design consultants, procurement of materials, conducting sub-contractor's meetings, and ensuring safety standards and procedures were implemented.

Site Engineer

M/S Power point. (Electrical Contractor)
10.1995 - 03.1998
  • Handled various projects including Sonata software, People software, and I-Gate
  • Responsible for handling complete site work, estimation, costing, budgeting, installation of electrical systems, coordination with design consultants, procurement of materials, and ensuring work was completed within the set time frame.

Education

Bachelor of Engineering in Electrical -

University of Bangalore
07.1994

Skills

AutoCAD

Maritalstatus

Married

Personal Information

  • Date of Birth: 05/23/1968
  • Nationality: Indian
  • Driving License: Brunei, Oman

Languages

English
Hindi
Kannada

Timeline

Site Engineer - Engineering Consortium Consulting Engineers (ECCE)
10.2023 - Current
Senior Electrical Engineer - DUNERS SDN BHD. Engineering Consultants
10.2011 - 11.2021
Electrical Inspector - W/S ATKINS
06.2006 - 03.2009
Project Engineer - M/S Zener Steward Electro mechanicals. (M & E Contractor)
05.2005 - 05.2006
Project Manager - M/S Micron Electricals. (Electrical Contractor)
06.2004 - 03.1998
Site Engineer - M/S Power point. (Electrical Contractor)
10.1995 - 03.1998
MEP Manager - ADANI GROUP
2 2022 - 07.2023
Electrical Inspector - W/S ATKINS
- 03.2011
University of Bangalore - Bachelor of Engineering in Electrical,
P.B. RavishankaraElectrical ingineer