Rajdipta Paul

Rajdipta Paul

Dubai,UAE

Summary

Over the past 9 years and 8 months, I have built a career designing and delivering large-scale heavy infrastructure on both a national and international level. I earned my Bachelor of Technology in Civil Engineering from Maulana Abul Kalam Azad University of Technology (MAKAUT) in 2016, and since then, I have continuously advanced my technical expertise in the field. My professional portfolio is heavily focused on involving projects on Bridges, Underground Structures such as Underpasses, Metro Stations, Cut & Cover Tunnels etc. I am adept at solving intricate structural challenges and am committed to delivering engineering solutions that prioritize economic viability, durability, and innovation.

Overview

10
10
years of professional experience
7
7
years of post-secondary education

Work history

Structural Design Engineer – Bridges/Tunnels

Parsons International Limited
Dubai, UAE
2024.10 - 2026.06

Structural Design Engineer - III

AECOM India Private Limited
Kolkata, India
2022.01 - 2024.10

Structural Design Engineer - II

AECOM India Private Limited
Kolkata, India
2019.01 - 2021.12

Structural Design Engineer - I

AECOM India Private Limited
Kolkata, India
2016.09 - 2018.12

Education

Master of Technology - Structural Engineering

BITS Pilani – WILP
India
2025.01 - 2027.12

Bachelor of Technology - Civil Engineering

Maulana Abul Kalam Azad University of Technology
West Bengal, India
2012.08 - 2016.08

12th examination - Higher Secondary

Mc William Higher Secondary School
Alipurduar

10th examination - Madhyamik

Mc William Higher Secondary School
Alipurduar

Skills

  • CSi Bridge (Using since October 2024)
  • Sap 2000 (Using since October 2024)
  • Autodesk Structural Bridge Design (Using since October 2024)
  • Sp Column (Using since October October 2024)
  • Staad Pro (Using since October 2016)
  • MIDAS Civil (Using since May 2021)
  • Oasys Adsec (Using since December 2016)
  • MS Office (Using since September 2016)

LANGUAGES KNOWN

English
Fluent
Hindi
Fluent
Bengali
Native

Projects handled

  • Project name: Bridge Assessment (Existing Bridge Assessment), Duration: January 2026 – April 2026 (4 Month), Client: RTA, Dubai, Location: Dubai, Duties:, Load Calculation and model preparation of existing bridge considering as built geometry., Design of RCC/PSC superstructure, diaphragm, pier wall and abutment beam., Prepare design summary and suggestion for critical elements., Software Used: CSi Bridge, Midas Civil 2025, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Improvements of Intersection between Maliha and Sheikh Khalifa Bin Zayed Roads (Post tension Cast in Place bridge), Duration: November 2025 – till date (2 Months), Client: SRTA, Sharjah, Location: Dubai, Duties:, Design of 1 number Post tension CIP multi span continuous bridge having multiple construction stages. Superstructure is two cell box supported over single column and pile foundation having varying depth and width. Ends of the bridges are supported on abutments., Load Calculation and model preparation of bridge using CSi Bridge software., Force extraction., Design of box girder- Stress check, longitudinal reinforcement design, transverse design, diaphragm design, bearing data preparation, deflection check., Design of Substructure & Foundation- Design of pier cap, pier column, Abutment beam, abutment back wall and pile foundation., Drawing preparation with the help of drafting team and Technical Report preparation., Software Used: CSi Bridge, Sap 2000, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Improvement of Al Wasl, Al Safa & Umm Suqeim Roads (Underpass design), Duration: October 2025 – November 2025 (2 months), Client: RTA, Dubai, Location: Dubai, Duties:, Design of underpass closed and open section., Load calculations and model preparation., Design of all elements of underpass for each section & Base Pressure check., Software Used: CSi Bridge, Sap 2000, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Improvements to enhance traffic flow on Sheikh Zayed Road (Post tension Cast in Place bridge), Duration: August 2025 – September 2025 (2 Months), Client: RTA, Dubai, Location: Dubai, Duties:, Preliminary study and spanning arrangement of proposed bridge location near Coca Cola Arena., Identifying Pier locations and fixing bridge spans., Load calculation and model preparation of one identified critical bridge., Design of box girder- Stress check & bearing data preparation., Design of Substructure & Foundation- Preliminary sizing of all substructure elements, Drawing preparation with the help of drafting team and Technical Report preparation., Software Used: CSi Bridge, Sap 2000, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Development of the junction between al khail road & hessa street Package-1 & 2 (Post tension Cast in place bridge), Duration: July 2025– August 2025 (2 Months), Client: RTA, Dubai, Location: Dubai, Duties:, Design of 3 numbers Post tension CIP multi span continuous bridge having multiple construction stages. Superstructures are Single cell box supported over single column and pile foundation having varying depth and width. Ends of the bridges are supported on abutment or common pier., Load Calculation and model preparation of bridge using CSi Bridge software., Force extraction., Design of box girder- Stress check, longitudinal reinforcement design, transverse design, diaphragm design, bearing data preparation, deflection check., Design of Substructure & Foundation- Design of pier cap, pier column, Abutment beam, abutment back wall and pile foundation., Drawing preparation with the help of drafting team and Technical Report preparation., Software Used: CSi Bridge, Sap 2000, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Improvement of Al Wasl, Al Safa & Umm Suqeim Roads (Post tension & RCC Cast in place bridge), Duration: December 2024 – July 2025 (7 Months), Client: RTA, Dubai, Location: Dubai, Duties:, Design of 4 numbers Post tension and 1 RCC CIP multi span continuous bridge. Superstructures are Single cell / Multi cell box supported over single column and pile foundation having varying depth and width. Ends of the bridges are supported on abutment or common pier., Load Calculation and model preparation of bridge using CSi Bridge software., Force extraction., Design of box girder- Stress check, longitudinal reinforcement design, transverse design, diaphragm design, bearing data preparation, deflection check., Design of Substructure & Foundation- Design of pier cap, pier column, Abutment beam, abutment back wall and pile foundation., Drawing preparation with the help of drafting team and Technical Report preparation., Software Used: CSi Bridge, Sap 2000, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Ras Al Khaimah Beach District- Sector 6 (Post tension Cast in place bridge), Duration: November 2024 – December 2024 (2 Months), Client: Al Marjan Developers, Ras Al Khaimah, Location: Dubai, Duties:, Design of 1 number Post tension CIP multi span continuous bridge. Superstructures are Single cell box supported over single column and pile foundation. Ends of the bridge are supported on abutment., Load Calculation, tendon profile preparation and model preparation of bridge using CSi Bridge software., Force extraction., Design of box girder- Stress check of box girder, longitudinal reinforcement design, transverse design, diaphragm design, bearing data preparation, deflection check., Design of Substructure & Foundation- Design of Substructure & Foundation- Design of Substructure & Foundation- Design of pier cap, pier column, Abutment beam, abutment back wall and pile foundation., Drawing preparation with the help of drafting team and Technical Report preparation., Software Used: CSi Bridge, Sap 2000, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Maintenance of Existing underpass - Al Nahada & Al Qiyadah Underpass (Existing Underpass Maintenance Design), Duration: October 2024 – November 2024 (2 Months), Client: RTA, Dubai, Location: Dubai, Duties:, Load Calculation and model preparation of closed and open section underpass., Design of underpass components., Base pressure check considering new live load considerations., Comparison of old and new design results., Software Used: Sap 2000, Midas Civil 2022, Autodesk Structural Bridge Design, sP Column, MS office.
  • Project name: Chennai Metro Project (Underground Metro Station), Duration: August 2021 – Mar 2022 (8 Months), Client: CMRL, Location: Chennai, India, Duties:, Design of different components of underground station metro station such as Diaphragm Wall, Waler Beam, Upstand Beam and Design of Slab., Drawing preparation with the help of drafting team and Technical Report preparation, Software Used: MS office, Staad Pro., Oasys Adsec
  • Project name: Dhubri-Phulbari Bridge in the state of Assam / Meghalaya on NH-127b (Extra Dosed Road Bridge), Duration: December 2020 – July 2021 (8 Months), Client: National Highways and Infrastructure Development Corporation, Location: Dhubri, India, Duties:, As Aecom was Authority’s Engineer in this project, involved in design checking., The following design checking has been performed:, Checking Design Basis Report., Checking of Pile & Pilecap and Viaduct PSC Box girder (Trans. analysis, stacking, Lifting) for Viaduct portion., Design and Drawing check of temporary form work and Preparation of comment response Sheet., Software Used: MS office, Staad Pro, Oasys Adsec, Midas Civil, FB Multiplier
  • Project name: Patna Metro Phase I Corridor 2 (Underground Metro Stations), Duration: January 2020 – November 2020 (11 Months), Client: Delhi Metro Rail Corporation (DMRC), Location: Patna, India, Duties:, Preparation of Design Basis Report (DBR), Design of different components of UG metro such as Diaphragm Walls, slabs, and columns., Stability Analysis of UG metro station., Drawing preparation with the help of drafting team &Technical Report preparation, Preparation of 3D model for dowel bar design at expansion joint location., Software Used: Midas Civil 2022, MS office, Oasys Adsec
  • Project name: Chennai Metro Project (Underground Metro Station), Duration: November 2022 – February 2023 (4 Months), Client: CMRL, Location: Chennai, India, Duties:, Design of different components of underground station metro station such as Diaphragm Wall, Waler Beam, Capping Beam, Upstand Beam and Slabs., Drawing preparation with the help of the drafting team. and Technical Report preparation., Attending technical meetings, responsible for delivering several packages., Software Used: MS office, Staad Pro., Oasys Adsec
  • Project name: Patna Metro Phase I Corridor 2 (Elevated Metro Stations), Duration: February 2020 – April 2020 (2 Months), Client: Delhi Metro Rail Corporation (DMRC), Location: Patna, India, Duties:, Design of Longitudinal Beams (superstructure), Deep Foundation & Substructure, Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: Chennai Metro Phase II Corridor 4 (Elevated Metro Viaduct), Duration: November 2019 – Mar 2020 (5 Months), Client: Chennai Metro Rail Limited (CMRL), Location: Chennai, India, Duties:, Design of different type of Piers (Portal Pier, Single Pier, and Double decker pier), Design of Deep Foundation, Technical Report preparation and drawing preparation with the help of drafting team., Software Used: MS office, Staad Pro, Oasys Adsec, Midas Civil
  • Project name: Mumbai Metro Rail Project Line MML2B (Elevated Metro Stations), Duration: November 2019 – December 2019 (2 Months), Client: MBZ - RCC (JV), Location: Mumbai, India, Duties:, Design Section identification of elevated station., Staad Model preparation, load calculation, and Foundation Design, Co-ordination with Mumbai team regarding critical design issues, Software Used: MS office, Staad Pro
  • Project name: Consultancy Services for Detail Design of Two Bridges Over River Makru & Barak on NH37 In the State of Manipur (Steel Road Bridge), Duration: May 2019 – October 2019 (6 Months), Client: Bhartia Infra Projects Ltd (BIPL), Location: Manipur, India, Duties:, Staad Model preparation for different components, Detail connection Design of superstructure Truss (90m X 10m), Foundation Design & Substructure design, Technical Report preparation and drawing preparation with the help of drafting team., Construction support and Co-ordination with clients for critical issues., Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: Chennai Metro Phase II Corridor 3 (Underground Metro Stations), Duration: April 2019 – July 2019 (4 Months), Client: Chennai Metro Rail Limited (CMRL), Location: Chennai, India, Duties:, Design of different components of underground station metro station such as Diaphragm Wall, Waler Beam, Upstand Beam and Design of Slab Design of Roof, Concourse & Base Slabs, Stability Analysis of UG metro station., Technical Report preparation and drawing preparation with the help of drafting team., Software Used: MS office, Staad Pro
  • Project name: Detail Design of Canopy Truss at Toll Plaza and Proposed toilet block of Second Vivekananda Bridge (Steel Structure Project), Duration: Feb 2019 – May 2019 (4 Months), Client: Second Vivekananda Bridge Tollway Company, Location: Howrah, India, Duties:, Staad Model preparation of Canopy Structure, Detail design of concrete foundation, steel column, steel truss members, and steel connections., Technical Report preparation and drawing preparation with the help of drafting team., Co-ordination with client and site visits, Software Used: MS office, Staad Pro
  • Project name: Riyadh Metro Project-Egress Shaft (Egress Shaft for Underground Metro), Duration: November 2018– March 2019 (5 Months), Client: Bechtel Almarjan CCC Siemens consortium (BACS), Location: Riyadh, Saudi Arabia, Duties:, Detail Design of Architectural Block Work supporting Beam., Technical Report preparation and preparation of detail drawing with the help of Drafting team., Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: Jakarta Metro Rapid Transit (JMRT) (Steel Roof Shed in Elevated Metro), Duration: July 2018 – August 2018 (2 Months), Client: Tokyu-Wika Joint Operation (TWJO), Location: Jakarta, Indonesia, Duties:, Design of steel roof, staircases, steel connections, Chequer plate in accordance with British Codes, Software Used: MS office, Staad Pro
  • Project name: New BG Rail line between Jiribam – Tupul (Imphal) Bridges Project. (NFR 7 Bridges) (Railway Bridges), Duration: October 2017-July 2018 & September 2018 - February 2019 (1 year and 6 Months), Client: Northeast frontier railway, Location: Manipur, India, Duties:, Design of Deep Foundation and Substructures (Pier and Pier Cap), Technical Report & drawing preparation. Attending client meetings and Site Visits., Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: DDC of Bridge No 4 & 5 in Connection with Construction of Sivok to Rangpo New BG Railway Line Project (Railway Bridges), Duration: June 2018 – August 2018 (2 Months), Client: IRCON International, Location: West Bengal & Sikkim, India., Duties:, Design of Deep Foundation and substructures (Pier and Pier Cap), Technical Report preparation & Checking of Drawings, Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: New BG Rail line between Jiribam – Tupul (Imphal) Bridges Project. (NFR 6 Bridges) (Railway Bridges), Client: Northeast frontier railway, Location: Manipur, India, Duties:, Design of Deep Foundation and Substructures (Pier and Pier Cap), Technical Report preparation and preparation of detail drawing with the help of drafting team, Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: New BG Rail line between Jiribam – Tupul (Imphal) Bridges Project. (NFR 3 Bridges) (Railway Bridges), Duration: July 2017-September 2017 (3 Months), Client: Northeast frontier railway, Location: Manipur, India, Duties:, Preparation of Design Basis Report (DBR), Design of Deep Foundation and substructures (Pier and Pier Cap), Technical Report preparation and preparation of detail drawing with the help of drafting team, Software Used: MS office, Staad Pro, Oasys Adsec
  • Project name: Dhubri - Phulbari Extradosed Bridge Project (DPR Road Bridge Project), Duration: February 2017 – March 2017 (2 months), Client: National Highway and Infrastructure Development Corporation (NHIDCL), Location: Assam, India., Duties:, Design of 1 no. 3.0×3.0 single cell RC box culvert and Design of 2 no. RC 12.0×5.5 single cell VUP (Using IRC Code)., Software Used: MS office, Staad Pro
  • Project name: Riyadh Metro Project-Egress Shaft (Egress Shaft for Underground Metro), Duration: September 2016 – January 2017 & March 2017 – June 2017 (8 months), Client: Bechtel Almarbani CCC Siemens consortium (BACS), Location: Riyadh, Saudi Arabia., Duties:, As Structural and Architectural Design coordinator travelled to Riyadh, Saudi Arabia for 2 months., Load Calculation of Various structural components., Design in Excel for Basements and Stair components of EES., Software Used: MS office, Staad Pro, Oasys Adsec

AWARDS / ACHIEVEMENTS

Awarded with the title “CIRCLE OF EXCELLENCE” for delivering a critical milestone with team in NEOM Infrastructure Project at Aecom Kolkata in September 2023.

Affiliations

  • Chartered Engineer (India)
  • Associate Member of The Institution of Engineers (India)

DECLARATION

I hereby declare that the above information is true and correct to the best of my knowledge and belief. Date: 2026-05-12 Rajdipta Paul

Timeline

Master of Technology - Structural Engineering

BITS Pilani – WILP
2025.01 - 2027.12

Structural Design Engineer – Bridges/Tunnels

Parsons International Limited
2024.10 - 2026.06

Structural Design Engineer - III

AECOM India Private Limited
2022.01 - 2024.10

Structural Design Engineer - II

AECOM India Private Limited
2019.01 - 2021.12

Structural Design Engineer - I

AECOM India Private Limited
2016.09 - 2018.12

Bachelor of Technology - Civil Engineering

Maulana Abul Kalam Azad University of Technology
2012.08 - 2016.08

12th examination - Higher Secondary

Mc William Higher Secondary School

10th examination - Madhyamik

Mc William Higher Secondary School
Rajdipta Paul