Dynamic Senior Quantity Surveyor with extensive experience at CDM Smith, excelling in cost planning and value engineering. Proficient in Cost X and Win QS, I drive project success through strategic cost control and effective stakeholder collaboration. A proven leader, I mentor junior staff while delivering substantial cost savings and enhancing project outcomes.

Overview

16
16
years of professional experience

Work History

Senior Quantity Surveyor

CDM smith
Dubai
12.2023 - Current
  • Cost planning and reporting during the conceptual, schematic, and design development stages, based on NRM, along with cost control systems and strategies for large, complex construction projects
  • Collaborated with the QS team, quantifying cost plans using Cost X and worked with project managers, engineers, architects and other stakeholders to ensure that project requirements were met on time and within budget
  • Conducted value engineering studies
  • Tender services including comparisons, tender analysis, negotiations, and recommendations
  • Conducted detailed cost analyses and provided recommendations for cost-saving measures
  • Identified and resolved discrepancies in project costs
  • Quantities and other financial data
  • Reviewed and assessed project change requests and variations recommending appropriate actions to be taken
  • Oversaw the work of junior Quantity Surveyors, providing guidance and mentoring as needed
  • Prepared and presented regular progress reports to project teams, Senior management and clients

Senior Quantity Surveyor

WT Partnership LTD
Abu Dhabi
08.2023 - 11.2023

Project Cost consultant

Blair Anderson LTD
Dubai
11.2014 - 08.2023
  • Collaborated with the QS team, quantifying cost plans using Cost X, Dimension X, Win QS and worked with project managers, engineers, architects and other stakeholders to ensure that project requirements were met on time and within budget
  • Elemental cost planning from the concept stage to the tender stage
  • Preparation and updating of cost Estimates
  • Value Engineering Studies
  • Tender documents Preparation
  • Preparation of Pre-Tender Estimates
  • Undertaking Tender Evaluation and Reports

Assistant Cost Manager

Currie & Brown LTD
Dubai
04.2012 - 10.2014

Assistant Quantity Surveyor

High Gate Interiors
Dubai
11.2010 - 03.2012

Quantity Surveyor

Cost Engineering Services (PVT) Ltd
Colombo
05.2009 - 12.2009

Assistant Site Engineer

International Construction Consortium (ICC) (Pvt.) Ltd
Sri Lanka
01.2009 - 04.2009

Education

Bachelor of Quantity Surveying & Construction Management - Civil Engineering

Sheffield Hallam University
U K
07.2013

HNDE -

Sri Lanka Institute of Advanced Technological Education (SLIATE)
Sri Lanka

Skills

  • Cost X: 7 years of experience
  • Revit BIM - 5 years of experience
  • Dimension X - 10 years of experience
  • Win QS – 14 years of experience

Affiliations

  • Member of AIQS Australian Institute of Quantity Surveyors
  • Member of IIESL Institution Of Incorporated Engineers, Sri Lanka
  • Member of IEng Incorporated Engineers

Projects Involvement

  • Master development Project Wonder, 2 island development – 3 billion, Master development, 3 five-star hotel, 2 Airport, 3 port terminal+ infra., KSA
  • Masdar Discovery Park, Abu Dhabi
  • Sindalah island Development, KSA
  • Port city development, Colombo, Sri Lanka
  • Dubba Port Terminal 1, Infra, 900 M, KSA
  • KIZAD infrastructure project, Abu Dhabi
  • Marjan Island road Development, Approximate cost 200 M, RAK
  • Al Daoon Road Development, Approximate cost 600 M, Infra, Abu Dhabi
  • Al Alian cycle track, 3 locations Al Yahar, Al Salamat & Al sad, 20 km, Infra
  • Upgrading of Emirates Road, From Al Badeea IC to E55 IC, Ajman, approximate cost 600 M, Infra
  • E611 and E311 connection to RAK sector 6 beach district, Abu Dhabi
  • DMT 60 park, Various location in Abu Dhabi, Infra
  • CoEx (Conference and Exhibition Centre) Project, Located in EXP O2020, Dubai
  • Showrooms AMG City Walk Gargash, Dubai
  • Lego & Little Explorers Stores, Dubai
  • Mudon Residential 400 Villas, Dubai
  • Al Barari Residential Developments, Dubai
  • Dubai Creek Harbor Residential Development, Dubai
  • DIP Residential Development, Dubai
  • RAK Public Realm Development, Dubai
  • Dar Al Mankhool Residential, Dubai
  • Dar Al Khor Residential, Dubai
  • The Gate Avenues, Shopping malls/Mixed-use developments, DIFC, Dubai
  • Innovation Hub development, Dubai
  • Etihad Museum, Museums, Dubai
  • Kalba Wildlife Centre, Zoo and safari parks, Sharjah
  • Bridi Park, Sharjah
  • VOX cinemas, KSA
  • AMC Cinemas, KSA
  • Fort Hotel, Oman
  • Al Jadaf Development, Dubai
  • Deerfield Town Square Mall, Abu Dhabi
  • ADCO Shah New Accommodation, Abu Dhabi
  • Al Tayer Motors Service Centre, Dubai
  • Dubai Chamber of Commerce, Dubai
  • Oceana Residence, Dubai
  • Dubai Bank, Dubai

Languages

English

Forms Of Contracts

FIDIC Forms of Contracts

Years Of Experience

14

Timeline

Senior Quantity Surveyor

CDM smith
12.2023 - Current

Senior Quantity Surveyor

WT Partnership LTD
08.2023 - 11.2023

Project Cost consultant

Blair Anderson LTD
11.2014 - 08.2023

Assistant Cost Manager

Currie & Brown LTD
04.2012 - 10.2014

Assistant Quantity Surveyor

High Gate Interiors
11.2010 - 03.2012

Quantity Surveyor

Cost Engineering Services (PVT) Ltd
05.2009 - 12.2009

Assistant Site Engineer

International Construction Consortium (ICC) (Pvt.) Ltd
01.2009 - 04.2009

Bachelor of Quantity Surveying & Construction Management - Civil Engineering

Sheffield Hallam University

HNDE -

Sri Lanka Institute of Advanced Technological Education (SLIATE)
ROHANA KODITHUWAKKU