To work in a challenging environment that encourages learning creativity, provides exposure to new idea and stimulate personal, professional growth of my organization and improve my knowledge in any field I work with. My superiors can always be assured of single-minded devotion from my side. Competent Engineering professional offering foundation in engineering project management and design. History of success in performing load and cost calculations and establishing clear parameters.
• Responsible for entire start up and shut down activities in boiler , turbine and bop.
• Along with our client commissioning activity was carried out.
• Responsible for continuous, safe and efficient operation of the plant with field operators.
• Generator H2 purging and CO2 purging procedure well versed.
• During annual overhauling, In charge in boiler and turbine from operation side.
• Responsible for the Hydro test of boiler after a tube failure or an annual maintenance.
• Maintained pneumatic, motor operated valves, actuators and pumps, static equipment.
• Instruct and communicate, equipment parts changes etc, as per the situation.
• Responsible for routine changeover of equipment as per schedule.
• Responsible for the LDO, HFO unloading and line of fuel oil system for startup activities.
• Leading and motivating large teams of workers and professionals and handling allocation of tasks within teams based on skills profile.
• Isolation and normalization of equipment whenever PTW issued by shift in charge.
Perform equipment inspection maintenance task, troubleshooting and diagnoses of plant equipment.
CURRENT PROJECT DETALIS
POWER MECH PROJECTS LIMITED (2×600MW), CUDDALORE, TAMILNADU.
Boiler :
Type : PF , Sub Critical , tangential firing
Make : Harbin Boiler co Ltd
Capacity : 2069 TPH
Steam pressure/temp. : 179.9 Kg/cm2 // 540 Deg C
Fuel / feeding system : Imported Coal
Turbine :
Make : Dangfang Machinery Ltd.
Nominal Rating : 600 MW
Steam pressure/temp : 179.9 Kg/cm2 // 540 Deg C
No of stages : 42
Alternator:
Make : Dang Fang Electric Ltd..,
Capacity : 600MW