An astute professional with 11 years of experience in the field of railway signaling (Mainline, Metro,ETCS-L2) including Design, Testing ,commissioning, Maintenance and Project management. A creative and inventive thinker, who can build a good rapport with clients quickly, understand their requirements and result oriented person with a thirst of learning new things.
Etihad Rail Stage 2 : ETCS Level 2 : Hitachi Siganling Systems
Etihad Rail Stage 2 : ETCS Level 2 : Hitachi Siganling Systems
• Initial Budget preparation.
• Take-Over Project.
• Conduct meeting with customers at relevant stages.
• Conduct Site visit as necessary.
• Conduct Design Kick-off Meeting.
• Closure of Technical Queries.
• Preparation Project Deliver Plan.
• Preparation of Budget.
• Prepare PMR & CTC regularly and circulate for review.
• Ensure approval of BOM and other engineering documents before acceptance.
• Prepare procurement schedule based on lead time and building readiness.
• Rise PR as per the procurement schedule and follow up for material supply.
Preparation of Invoice request.
• Follow up for payment with customer.
• Conduct closeout meeting on completion of contract scope. (Include lesson learnt, data analysis report & certificates from customer)
• Co-ordinate with purchase for supplier selection & finalization.
• Ensure validity of Delivery Period, Insurance & Performance Bank Guarantee.
• Ensure Submission of contractual documents to customer. (PBG, GPA, Indemnity bond & Insurance)
• Ensure relay room readiness before starting the Installation.
• Ensure the quality of installation & wiring as per OEM guidelines & RDSO Pre-Commissioning Checklist.
• Co-ordinate with Site Engineers & Technicians for site activities.
• Co-ordinate with Design and Verification Team.
• Co-ordinate with T&C for customer FAT, SAT and commissioning.
• Ensure submission of As made markup copy to design Team.
• Ensure submission of final documents.
• Co-ordinate with customers for getting for approvals of site works. (Materials transaction, Indoor and outdoor activities)
• Ensure on-Time submission of relevant Letters to customers. (Extension of DP, PBG, Insurance & Deputation letters to site staff)
• Ensure maintenance is carried out as pr the OEM recommendation & reports approved by customers
• Co-ordinate with OEM for FAT, Site Visit & OEM Certification.
• Access the competency of site Engineers & Technicians at defined frequency.
• Ensure non-confirming products identified separately, isolated & sent back to originators with remarks & identification.
• Cross verifies the stock register maintained by site engineer.
• Ensure DT for incoming as well as outgoing documents.
• Achieving system acceptance with Tester in Charge.
• Reporting any errors.
• Ensuring all required documentation is completed, including Test certificates.
• Evidence and all assigned work instructions at the end of each shift.
• Engaging the supplier, internal and customer product reviews with emphasis on customer requirements and compliance.
• Lead the assigned dedicated work scope of Test and Commissioning.
• Conduct all required Test Procedure, Methodology & equipment testing activities in site related to project to obtain sign-off from Customer.
• To arrange all test equipment required for testing in coordination with site Manager & team leader.
• Mobilization of required test equipment arranged and made ready to commence testing in time.
• Coordinate and liaise with Customers on application of Permit-To-Work for testing activities for approved proceedings.
• Prepare and compile test report for submission to customer
• Prepare and draft Method Statement Risk Assessment.
• Supervise and monitor the site test activities at each specific T&C work.
• Provide support to team leaders and site engineers in all safety related requirement.
• Develops test plans and test procedures for Site Acceptance Test (SAT), Interface test (IFT) and System Integration Test (SIT).
• Plan scheduling and job allocation for activities (to coordinate with Planner)
• Participation in technical discussion and report preparation.
• Organizing training programs.
• Installation & wiring for Railway Signalling Systems.
• Report to Project Manager on the station of Installation & Wiring.
• To support Testing & Commissioning (T&C) team during T&C activities.
• Ensure Installation is done as per the Interface circuits and OEM manual.
• To prepare bell Test marked copy of Interface Circuits after installation, wiring & bell test and report to Design Engineer.
• To prepare As Built marked copy of Interface circuits after commissioning.
• Conduct Weekly, Monthly & Annual maintenance in Electronic Interlocking and sent report to Customers.
• Conduct preventive maintenance periodically to reduce the system failures.
• Attend the EI system failure and sent failure report to customers.