JOB OBJECTIVE Seeking assignments in Mechanical / Piping / pipeline Construction, Operations, Erection & Commissioning, shutdowns, Maintenances and Site Management with a leading organization of repute in Oil & Gas Industry in Toxic gas environment like (Hydrocarbon & H2S, Sulphur, Power Plant) PROFILE SUMMARY
Result oriented professional with 13 years of experience of (onshore/offshore Mechanical, piping , pipe line components to meet design reliability
An effective leader with strong analytical, interpersonal and coordination skills
Overview
1
1
year of professional experience
1
1
Certification
Work history
EPC Contractor
Star Asia Offshore
01.2022
Essayed stellar role in handling wide variety of tasks, Subsea pipe line routing
Distinguished efforts towards handling Fabrication of Pin Fin type Heat Exchanger TRAININGS & COURSES ATTENDED, TBOSIET OPITO approved ETSDC, UAE( Cert 00585501141222264686), Basic H2S Awareness OPITO approved ETSDC U.A.E
( (Every year 2022 - 2024 till date)
EPC Contractor
Punj Lloyd Ltd
Abu Dhabi
01.2017
Distinguished efforts towards handling the Well head facilities (oil & gas , water injection and disposal ) , And construction of
RDS(Remote degasing station), CDS(Central degasing station) ,storage tank , Flow Line (Welding, PWHT/RT ,Pigging, hydro test & Flushing, Drying), Grit & Sand Blasting, Primer, MIO ,Final Painting, Weld Joint HSS Coating, Pipeline & Road crossings
R.O.W, Trial Pits, Berm Making, wellhead tie to piping & oil gathering manifold unit., Offshore Oil spill prevention and response ECO Solutions LLC U.A.E (Al Dabbiya)
China Petroleum Eingineering & Construction Corporation
01.2016
CPECC) , Abu Dhabi
Coordinating and supervising construction of pipeline (Stringing ,Welding, RT, HSS Coating ,Pigging, hydro test ), Horizontal
Directional Drilling for Road crossing , crossing over live pipeline corridors with hurdle supports, MOL (main oil line) crossings, well head piping and Tie-in connection to X-mass Tree in accordance with ADCO isolation system, Plant Shutdown activity to make Tie-in joints in main oil transfer line Precommissioning & Commissioning activities(involving DE pressuring, drain, deoiling, cold cutting & Nitrogen purging) in order to install Multiport selector manifold system(MSM) for new well head pipelines, Pipe rack structural work, new piping unit installation into existing live pipe rack (Tie-in for lines to oil Gathering
Managed 150 manpower during construction phase.
Manifolds , Station manifolds , Road Crossing ,Trunk lines ) & Tankage maintenance of main oil terminal (MOT)., work WMS system (JP,PA,PI,AA) U.A.E.
Campaign lead for preventive maintenance project at NASR platform, DAS LNG Berth-4 Jetty upgrade project
Tecnicas Reunidas, Abu Dhabi
Coordinating and supervising construction of Onshore Mechanical & Piping for oil production, gas lift, WAG, Gas compression station, CDS Plant, Well head shutdowns for precommissiong demolition works of existing old facility and construction to upgrade well facilities, ICAPS Operations, Mechanical Completion & RFC walkdown, punch closure
Take decision in
Coordination with Engineering for FCC drawings, make as built for ISO's /pipeline alignment sheets and weld map, Control and monitor various Subcontractors, Co ordination with QA/QC for testing, make Mechanical completion & RFC walkdown with ADNOC PMT & Operations Team for hand over to PMT/operations punch free oil production wells, Review/Close eye on
Engineering drawing ISO's, Civil Arrangement, Instrument device, Equipment layout & P & ID drawings used for site constructions
Solve site work issues within Engineering & standard limits, support & co-ordinate sub contractors, Daily progress report preparations, Pre plan before work activity with reference to approved drawings, red marks, material availability & Production control application, Carry, check & approve leak test of entire Piping & instrument devices in plant
Role as a ADNOC Approved Performing Authority(PA) to approve Green & Brown Work Permit under ADNOC WMS safe work system
Tecnimont Maire Spa, Abu Dhabi
Coordinating and supervising construction of offshore underground Pipeline/Piping unit, oil, gas, water alternate gas (WAG) manifold systems at cluster (island)(involving welding, NDT, PWHT, painting ,hydrotest, drying) and Tie-in works to well heads in accordance with ICC, offshore pipeline construction( involving activities welding, PWHT,NDT, HSS coating, pipeline Construction & pulling through hydraulically powered linear winch(Capacity 1000 tons) pigging, hydrotest, drying), road crossings, MOL (main oil line) crossings, Tie-in connection between well head cluster manifold unit and subsea pipeline, shore approach through island Revetment area, Pipeline Precommissioning & Commissioning Activities
ICAPS operation, participation in Mechanical completion & RFC walkdown, Breathing Apparatus Courses from ETSDC & ADCO, U.A.E.
Plan & execute pipeline precommissioning & Commissioning activities
Prepare field change notice (within limits of engineering deliverables & ADNOC design general specifications) to optimize
Pipeline routes
Plan, resource arrangement & execute for Pipeline pigging, gauging, water filling, hydrotesting, leak testing, dewatering, swabbing, drying & line preservation as per COMPANY specifications & project quality procedure
Execution of Pipe joint HSS coating, Holiday test clearance prior pipeline lowering
Co-ordinate with Cathodic protection team for corrosion protection of pipelines
Perform jointly with Diving supervisor/diving team for subsea bed presurvey & relevant mainline construction activities
Raise TQ & SQ as & when required & applicable as per project requirements
Critical thinking, work in co-ordination with planning team
Participate in weekly progress meeting with COMPANY have action plan for 2 weeks lookahead
Work in concurrence with Vessel team, be updated on weather forecast, plan & execute project activities accordingly taking into considerations HSE measures
Structural Modifications execution, strengthening for Barge type structures at overboard scaffolding platforms
Replacement of quick release hooks & parallel motion fenders for LNG berth upgradation
Installation, precommissioning & commissioning of new marine access gangway & associated deck strengthening structural works
Reroute, modify clash mitigation structures, boat landing structures, piping & E & I cable trays
Construction execution of critical alternate load path(ALP) supports fitup & welding to strengthen Barge type structures
ALP Commissioning activities for existing accommodation, additional accommodation & water injection platforms at UMM
SHIEFF platform
Mechanical completion walkdowns & punch point clearance for COMPANY hand over
Campaign Engineer for Quarterly Preventive maintenance activities at NASR offshore platform for Rotating
Preventive maintenance of F & G detectors, NOVAC system, Rotating equipment's, calibration & reinstallation of PSVs at NASR platform
Participate in Risk assessments, IWAP meetings
Prepare readiness checklist for job execution
Performed initial site survey for replacement of Instrumentation control valve weighing 8 Tons through static lift at ACPT platform
Prepare & Review Method Statement & other Construction documents, clear COMPANY comments, if any
Lead a construction team of size 200 manpower with suitable arrangement of resources
Equipment's, manpower requirements list, construction execution strategy preparation, Activity scheduling in co-ordination with project planning team
Work in co -ordination with Design & engineering for the basis of generation of safe construction feasible drawings
Follow with procurement team for generation of P.O for Project material once IFC issued from ADNOC
Coordinating & Supervising Erection of underground piping in Clusters and Island Well head pad piping and its infield pipeline & dismantling existing test separator at Al dabbiya clusters
Essayed a stellar role in handling the wide variety of tasks, Subsea pipe line routing
Pipeline stringing on barge & Bogie for Reel Lay
Pipeline welding on barge & Bogie for Reel Lay
Coordinating with QC for Joints NTD & Bogie for Reel Lay
Heat shrink sleeves Coating on pipe joint
Pipeline S-lay by pipelay barge and Reel Lay
Pipeline pigging, hydrotesting, Drying & line inerting
Pipeline pulling into clusters through sea with a hydraulic powered linear winch (1000 Ton capacity)
ONSHORE
Prepare field change notice (within limits of engineering deliverables & ADNOC design general specifications) to optimize
Pipeline routes for 48", 36" & 18" gas & oil pipelines
Raise TQ & SQ as & when required & applicable as per project requirements
Review vendor documents & ensure documents are as per client requirements
Prepare redline markups & field change for Pipeline alignment sheets to optimize route
Pipeline presurvey works to optimize mainline route & reduce critical paths & reworks well in advance prior execution
Critical path identification in co-ordination with planning team, accordingly prepare action plan to accord with achievement of milestones as per forecast plan
Co-ordinate with COMPANY operations, quality, sub-contractors & vendors & ensure project is implemented in smooth flow
Lead a construction team in capacity 200 & ensure right resources are available at site in order to avoid delays & reworks
Plan & carry execution of NDRC (Non- disruptive road crossing) through HDD, open cut & Microtunelling crossing methods
Carry Hot tapping task for live gas pipeline 48" size to facilitate single branch connection from run pipeline & Hot tap by bypass flow through method for installation of Block valve at habshan station
Plan, resource arrangement & execute for Pipeline pigging, gauging, water filling, hydrotesting, leak testing, dewatering, swabbing, drying & line inerting as per COMPANY specifications & project quality procedure
Participate in line walkdowns, action plan, closeout punches generated during MC & reinstatement walkdowns
Competent to carry necessary calculations for hydrostatic pressure testing of pipelines
Working as ADNOC Approved Performing Authority for WMS Permit System Mechanical /Piping / Pipeline
Construction Engineer and issuing mechanical clearance for utility & process loops, as built preparation & documentation and punch point & loop preparation
Working experience on ICAPS (Integrated Commissioning & progress monitoring system), follow up site work completions to close tasks in ICAPS
Note punches raised during MC & RFC walkdowns, updated in ICAPS, ensure activities performed, punches closed in system
Carry Mechanical completion & RFC waldowns with ADNOC operations to hand over Punch free end product to client considering safety, quality, easy operation & maintenance
Piping Construction & testing for Oil, Gas, WAG, Gas lift & produced water dispoal wells
Precommissioning & Commissioning work activities for old and new replacement pipelines
Attending TRA(JSA1/JSA2/FRA) session with client, Writing TRA and Method Of Statement
Coordination & Supervising Installation of Static & Rotating Equipments
Coordination & Supervising maintenance of Well Heads ( Isolating, depressurizing &Installation of valves ,spools )
Coordinating & Supervising spading, de spading , nitrogen purging , in Compression station piping ,Well heads, Natural gas, H2S & main tranfer oil lines
Coordinating & Supervising construction of stainless steel piping for water disposal well heads
Coordinating & Supervising shutdown for extension of RDS & CDS stations with installation of multiport selector manifold system for new well head pipelines and new piping unit over exiting live pipe rack and Tie-in connection into main transfer oil line
Carry, check & approve leak test of entire piping & instrument devices for wells and plants for oil, gas lift piping units
Coordinating & Supervising shutdown for TIE IN'S of flow lines with CDS , RDS and Clusters manifolds & x-mass tree &
Horizontal Directional Drilling for ( trunk , transfer & flow ) lines
Overseeing daily work activities of sub-contractor such as erection of above ground piping, field fabrication & pipeline crossings
Accountable for Fit-up and Weld Visual inspections and coordinating with Quality Department
For QA / QC documents (line history sheet, loop files, RT , DPT and generation / maintenance of work progress reports)
Developing / implementing Project Execution Plan (PEP); preparing bulk MTO from isometrics and monitoring hydro & pneumatic test and box up, hook up activity
Responsible for coordinating with: o Subcontractor's monitoring of daily Piping spool Fabrication and spools erection o HSE team to full fill HSE requirement to meet world class HSE Standards
Preparing GA drawing for unit piping, Pressure Vessels, Pumps and Heater from reference of P&ID, plot plans, civil drawing and client comment as per ASME & ANSI
PRE COMMISIONING SUPERVISION VALVE MAINENANCE/OVERHAULING
Adroit in working on ASME (B31.1,B31.3, B31.4 & B 31.8, Section VIII DIV 1&2), ASTM,AISC, API (620 & 650, 1104),TEMA
MSS Codes & Standards for oil & gas wells
Construction of asphalt roads, Break water at offshore approach area for pipelines, piping (fire works), plumbing work, water distribution lines constructions, utility services, road & pipeline crossings
Experienced in civil works for concret castings, installations of precast elements in oil plants, mechanical, manual excavations
Highly experienced in Toxic gas environment like ( H2S , Gas Compression live plant , Handling Gas & Sulphur Transfer line and plants)
Proven abilities in handling the Piping, Process Plant Piping & structure, Infield Pipelining and oil, Gas Transmission
Pipelining and valve maintenance
Enhanced Ability to Work, Handle & Resolve problems in Static & Rotating Plant Equipments
Adept in working closely with the Project Engineers/Designers; steering the delivery of project engineering / construction deliverables, preparing quality control drawings and providing overall project support
Deft in studying FEED, P&ID and reviewing engineering drawing, valve data sheet & hydro/pneumatic testing activities
Skilled in preparing Welding Maps, BOMs, MTOs and coordinating for the selection of suitable materials for various
Certification
China Petroleum Pipeline Engineering, Abu Dhabi. Mar 2024 to Present Designation: Piping & Pipeline Construction Engineer (AGP Approved & P.A) Project: Mirfa Plant modification and pipeline project Client: ADNOC Gas Processing (AGP) Adyard Altrad Abu Dhabi. Dec 2022 To Feb 2024 Designation: Construction Engineer (Mech, Piping & Pipeline) Offshore (ADNOC Offshore Approved P.A) Project: Barge type structure integrity Project/Nasr Maintenance Project/ACPT/DAS LNG Berth Client: Abu Dhabi National oil company (ADNOC) TECNICAS REUNIDAS, Abu Dhabi Jan'2020 To Nov' 2022 Designation: Piping Engineer (ADNOC Approved P.A) Project: Bu Hasa Integrated Field Development Project (BUIFD) Client: Abu Dhabi National Oil Company (ADNOC) Tecnimont maire spa, Abu Dhabi July'2016 Mar 2019 Designation: Piping & Pipeline Supervisor Project: Al Dabbiya Surface facilities phase-3 project (Offshore & Onshore Pipeline) Client: Abu Dhabi National Oil Company (ADNOC) China Petroleum Engineering & Construction Corporation (CPECC), Abu Dhabi June'2014- June'2016 Designation: Piping & Pipeline Supervisor Project: Asab Unit 6 & 7 Project & ADCOP Maintenance Project (Onshore Pipeline ) Client: Abu Dhabi Company for Onshore Petroleum Operations (ADCO) Punj Lloyd Limited, Abu Dhabi May'2012- Mar'2014 Designation: Piping/Pipeline Supervisor Project: Tie-in Project (Infield Pipeline to RDS & CDS as Oil & Gas Well Head Facilities) Client: Abu Dhabi Company for Onshore Petroleum Operations (ADCO) Star Asia Offshore, Mumbai (EPC Contractor) May'11 - May'12 Designation: Mechanical Engineer (GET-ONGC Offshore Approved) Project: URAN TROMBAY JAWAHARDEEP OIL PIPELINE (Offshore) Client: Oil & Natural Gas Corporation (ONGC) (Punj Lloyd ltd ) NDT Level-2 Completed in RT, UT, MPI & PT From KALVA Engineers Pvt Ltd, INDIA Jan' 12- Feb' 12
Timeline
EPC Contractor
Star Asia Offshore
01.2022
EPC Contractor
Punj Lloyd Ltd
01.2017
China Petroleum Eingineering & Construction Corporation