Accomplished professional with extensive expertise in pipeline operations, construction, and maintenance. Demonstrates proficiency in project management, risk assessment, and quality management systems. Skilled in regulatory compliance, environmental impact analysis, and team leadership. Adept at utilising CAD software for pipeline design and engineering, with a strong foundation in materials selection and corrosion control. Committed to process improvement and cost control while ensuring adherence to industry codes and standards. Career goal: to leverage analytical thinking and creative problem-solving skills to drive innovation in pipeline integrity management systems.
Experienced Pipeline Engineer with knack for solving complex challenges and driving project success. Led multiple projects, improving efficiency and safety standards. Known for collaborative approach and delivering results under tight deadlines.
Overview
20
20
years of professional experience
1
1
Certification
Work History
Senior Pipeline Engineer
Abu Dhabi Company for Onshore Operations
Abu Dhabi, U.A.E.
10.2013 - 02.2025
Supervise welding and installation of 2-inch cosasco flare weld access fittings for internal corrosion monitoring at 6 O'clock positions for 20" and 12" NEB and Rumaitha export pipelines at km 23, 50, 29 and 100
Lead the design and implementation of pipeline projects, including feasibility studies, route selection, and detailed engineering for MOLs 1.2, 3.3 and 3.5
Manage project teams, ensuring timely completion of milestones and adherence to budget constraints
Conduct risk assessments and develop mitigation strategies to address potential hazards in the daily operations of AON MOLs
Oversee quality assurance and control processes to ensure compliance with industry standards and regulations in the day to day running of MOL operations
Collaborate with environmental specialists to minimize the impact of pipeline projects on local ecosystems
Prepare technical reports and documentation for regulatory submissions and stakeholder communication
Spearheaded the engineering design and execution of major pipeline projects, including [WEP, ADCOP, and JD/MP 21 upgrade], ensuring compliance with international standards (e.g., ASME B31.4, ASME B31.8, ADNOC Standards, DNVGL)
Led and mentored a team of UAE engineers and designers, providing technical guidance and overseeing project deliverables
Conducted detailed feasibility studies, route selection, and cost estimations for proposed pipeline projects
Developed and implemented pipeline integrity management programs, encompassing risk assessment, corrosion monitoring, and inspection strategies for four no's MOLs
Utilized advanced engineering software such as CAESAR II, AutoPIPE for pipeline stress analysis, hydraulic calculations, and structural integrity assessments
Collaborated effectively with cross-functional teams, including procurement, construction, and operations, to ensure seamless execution of pipeline operations
Played a key role in HAZOP studies, risk assessments, and environmental impact assessments for several MOL projects
Contributed to the development and implementation of company-wide pipeline engineering standards and best practices
Conducted trending of corrosion rate data from intrusive weight loss coupons, ER probes for MOLs 1.1 & 1.2, 3.4 & 3.5, 4.1 & 4.2, and issue monthly report on the effectiveness of existing chemical treatment and corrosion control strategy
Extensive mentoring of the UAE nationals on best and current maintenance practices for pipelines and crude storage tanks
Coordinates the monthly routine de-watering pigging of MOLs 1.2, 3.4, 3.5, and 4.2 and collect samples for intrusive indirect internal corrosion monitoring
Conducted IPS verification of reported anomalies for MOLs 1.2, 3.4, 3.5 and 4.2 and recommend remedial measures to maintain pipeline integrity
Supervises the implementation of chemical treatment and dewatering pigging by ensuring the recommended and effective dose of corrosion inhibitor and batch of biocide is injected monthly for MOL 1.2, 3.4, 3.5 and 4.2
Reviewed work scopes, WPS, and PQR for welding of ICMP access fittings on 24inch Spurline 1 & 2
Repairs of over 250 no's of dead leg drains in JD terminal piping headers.
Reviews work scope, soil resistivity, conceptual design, design documents, including supervision during the construction, installation, pre-commissioning, and commissioning of MOLs
Conducted leak repair by clamping on 24inch MOL 1.2 at MP 66
Conducts bi-annual CP performance evaluation by recording the on/off survey pipe to soil potential for buried MOLs 1.2, 3.4, 3.5 and 4.2
Conducted the de-oiling by nitrogen of MOL 3.5
Conducted decommissioning, sectional replacement and commissioning of MOL 3.5
Conducted caliper/cleaning pig runs on 24inch MOL 1.2, 36inch MOL 3.4, 36inch MOL 3.5 and 36inch MOL 4.2 in preparation for IPS
Conducted shutdown maintenance of storage tank no 1518
Coordinate/Conducted hydro test and repairs of flowlines in Bab, Habshan, Buhasa, Asab, MOL 1.2 and Shah fields and documents same for integrity evaluations
Collect base water sample for crude during routine pigging for MOLs 1.2, 3.4, 3.5 and 4.2 and submit same to laboratory for water chemistry analysis to identify levels of existing corrosion species and establish the existence of new elements
Supervised welding and installation of Sacrificial anode for the produced water tank at main pumping station
Conducted leak investigation report, repair, pre-commissioning, and commissioning of 24inch MOL 1.2 at MP66 near JDA
Supervised the construction of 24in Dabbiyya to Habshan crude export pipeline
Participated in the review board for the development of standard for the analysis of inspection data relating to corrosion measurement
Conducted sleeve welding of fifty-six sleeves on 20inch Neb export line, MOL 3.4, MOL 3.5, MOL 4.2, spur lines 1 and 2
Conducted bell-hole inspection of 36inch MOL3.5 at MP 58 and MP 48 linking manifolds
Conducted Sleeve welding on 30inch surge outlet line on storage tank 1516 in JDA tank farm
Shutdown overhaul and turn around maintenance of 24inch and 30-inch foreshore and meter bank header piping
Carried sectional replacement of 64inch loading line and 48inch tank 1518 outlet discharge line
Conducted sleeve welding of 24inch surge outlet line on storage tanks 1514 and 1515 in JDA tank farm
Procurement of all insurance spares and maintenance items for pipeline department
Day to day running of pipeline maintenance workshop and supervision of all workshop maintenance activities
Performed maintenance of export main oil pipelines, oil storage tanks etc
Hydrotest, maintenance, and cleaning of pipelines
Mentoring of the locals on the use of equipment's and procedures for best maintenance practices
Task orders and work planning using Maximo
Pipeline maintenance and construction of 40-inch ADCOP pipeline
Discharge of other functions as may be due by the team lead
Proposed maintenance procedures for use by contractors
Pre-commissioning/Commissioning/isolation/de-isolation of pipelines
Turn-around maintenance of pipelines and storage tanks
Management of change and anomalies on main oil pipelines
Developed procedures for commissioning and startup
Conducts site HSE audits at worksites
Performed and planned shutdown activities of degassing stations in rumaila oilfields
Supervision of sand/grit blasting of storage tanks
High pressure washing/steam washing of storage tanks
Sectional replacement of 36inch MOL 3.5 Main Oil Line at MP58.5, MP51.4, MP59 and MP 64.5 locations
Implemented measures for corrosion control, prolonging pipeline lifespan.
Conducted regular audits for quality assurance purposes.
Coordinated maintenance operations for minimal downtime.
Optimised pipeline routes using advanced software tools.
Ensured compliance with environmental standards whilst executing pipeline projects.
Undertook feasibility studies to assess new pipeline projects' potential success.
Created contingency plans, reducing impact of disruptions.
Analysed data from inspection tools to maintain pipeline health.
Provided technical support in tender preparation and acquisition processes.
Attended relevant training courses, staying abreast of latest industry trends.
Adhered strictly to local and international codes during design process.
Collaborated with multidisciplinary teams, resulting in streamlined project execution.
Enhanced operational efficiency by implementing innovative technology solutions.
Conducted on-site inspections, ensuring adherence to safety regulations.
Oversaw construction activities, ensuring quality assurance and control.
Designed pipeline systems for optimal oil flow within the MOL network.
Harnessed strong data analysis and modelling to deliver complex engineering calculations.
Delivered construction outcomes through targeted structural stability assessments.
Organized information and completed paperwork for technical bids to secure new contracts for welding and pipeline maintenance contracts.
Minimized deviation from cost parameters through performance and budget monitoring through the lifetime of pipeline projects.
Conducted diligent site surveys and research to predict and quickly resolve issues.
Resolved project challenges through in-depth analysis and stakeholder consultation during all project stages.
Established project materials and methods to maximize construction productivity.
Prepared accurate project cost estimates, schedules, and specifications for daily operations of the MOLs to deliver the planned throughputs.
Motivated site teams to achieve quality results against construction deadlines for new MOLs projects.
Coordinated contractors, subcontractors, and labourers to deliver new MOL3.5 and 1.2 projects.
Monitored and maintained health and safety standards for site compliance in all projects.
Mechanical Engineer (Rumailla oilfied operations) - on British Petrol/ROO Project
Petrofac Engineering and Construction
Rumaila, Iraq
02.2012 - 08.2013
Leak testing of separators no 1 - 4 in train no 1, DS5 station in Rumaila oilfields
Mentoring of the Iraqi nationals on the use of equipment's and procedures for vessel cleaning/maintenance and pipelines
Leak testing of separators no 1 - 4 in train no 2, DS5 station in Rumaila oilfields
Leak testing of separators no 1 - 4 in train no 1, Ratqa station in Rumaila oilfields
Welding, fabrication, and construction 24inch LP and HP flare lines for DS5 station in Rumaila oilfields
Pressure vessels turn around maintenance for separators no 1-4, test separators no 1-3, dehydrators, desalters for train no 1 and 2 in Ratqa, Markezia and DS5 stations
Construction, welding, hydrotest (leak test), fabrication and commissioning of 12inch in-service process line to dehydrator (train 2) in DS4 station
Change-out of all process valves in DS5 (trains 1 and 2), DS4 (trains 1 and 2), and Ratqa (train 1)
Change-out/replacement of all vessel internals with new Cameron internals in DS5 (train 1 and 2) and Ratqa (train1)
Application of composite wrappings reinforcement on 20inch inlet pipeline to separators no 1 (train 1 and 2) in DS4 and DS5
Start-up and commissioning after turn-around shutdown for DS5 and DS4 (trains no 1 and 2), Ratqa DS and Markezia
Grit blasting and coating of separators, dehydrators and desalters in Ratqa, Markezia, DS4 and DS5 degassing stations
Coating of separators, desalters, storage tanks and dehydrators in DS1, DS4, DS5, Ratqa and Markezia degassing stations in Rumaila oilfields
Conduct maintenance of off-plot pipelines, on-plot pipelines, separators, dehydrators, desalters, heat exchangers, oil storage tanks, and other static equipment's
Hydrotest, maintenance, and cleaning of pipelines
Mentoring of the locals on the use of equipment's and procedures for vessel cleaning/maintenance and pipelines
Hydrotest and cleaning of pressure vessels
Pipeline maintenance and construction of pressure vessels inlets and outlets
Discharge of other functions as may be due by the project manager
Proposed pressure cleaning and maintenance procedures for use by contractors
Pre-commissioning/Commissioning/isolation/de-isolation of pressure vessels
Turn-around maintenance of pipelines and vessels
Construction of on-plot and off-plot pipelines in rumaila oilfields degassing stations
Management of change and anomalies on pressure vessels for all degassing stations
Developed procedures for static equipment testing, maintenance, commissioning, and startup
Conduct site HSE audits at worksites
Hydrotesting/pressure testing of high-pressure static and rotating systems
Part of the planning team for shutdowns of degassing stations in rumaila oilfields
Sand/grit blasting of vessels
High pressure washing/steam washing of vessels
Chemical washing of vessels
Developed a training program for pressure vessel maintenance for Rumaila oilfields shutdown
Proposed equipment's specification for use in vessel cleaning
Prepare work procedures for commissioning and pre-commissioning, hydrotesting, vessel maintenance, tank cleaning and maintenance etc
Pipeline/Flow assurance engineer
Shell petroleum development company
Port Harcourt, Nigeria
12.2004 - 01.2012
Company Overview: (contract staff)
Conducted weekly chemical injection of Biocides and scale inhibitors on 20" Kolo Creek - Rumuekpe trunk line T/L at kolo creek manifold M/F, 36" Rum - Nkpoku at Rumuekpe M/F, 36" Nkpoku - Ogale T/L at Nkpoku M/F, 10inch eku 1 to eku 2 delivery line at eku 1 M/F etc
For corrosion and bacterial monitoring and control forecast and analysis
Carried out routine sample collections of crude from each launcher and receiver of Trans Niger Pipeline (TNP) network, Greater Port Harcourt swamp Line (GPHSL) network and Nembe creek Trunk line (NCTL) network in Shell-east and analyse for crude/water analysis, SRB presence, CO2 presence and H2S content gas, oxygen ingress and presence of Organic acid and impact on alkalinity, and report same on monthly basis
Conducted routine pigging of all shell east delivery and trunk lines (GPHSL and NCTL) and update the progressive pigging database accordingly
Conducted 6-monthly CP survey of 36inch Nkpoku to ogale T/L, 36inch Rumuekpe to Nkpoku, 24inch alakiri to bonny terminal T/L, 14inch okordia to Rumuekpe T/L and update all findings in the integrity database for recommendations etc
Conducted monthly CP monitoring of 8inch Agbada 1 F/S to Agbada 1 M/F, 12inch Imo 1 to Imo 2, 28inch Ogale to Bony T/L, 24inch Ogale to Bonny T/L, 24inch Nembe to Sanbath M/F, 30inch Sanbath to Cawthorne channel tie-in M/F etc
Supervised the installation/replacement of defective deep well ground bed anode at Nkali flow station to improve on assets integrity at that location
Conduct hydrotest of 8inch Isimiri to imo gate M/F delivery line to ascertain the leak tightness and integrity of the delivery line
Supervised the 5-yearly intelligent pigging survey of 36inch Rumuekpe to Ogale M/F trunk line, 6inch belema F/S to sego M/F , 16inch peterside to bonny river crossing, 6inch krakrama F/S to krakrama M/F, and 16inch odeama F/S to belema M/F
Conduct sectional replacement of 24inch ogale to bonny terminal T/L at Bomu, 10inch eku 1 to eku 2 at eku M/F, 20inch Sanbath to krakrama at Sanbath etc
Conduct IPS verification of reported anomalies for 36inch Rumuekpe to Ogale M/F trunk line, 6inch belema F/S to sego M/F , 16inch peterside to bonny river crossing, 6inch krakrama F/S to krakrama M/F, and 16inch odeama F/S to belema M/F
And recommend remedial measures to maintain pipeline integrity
Supervised the pre-commissioning/commissioning of 18inch kolocreek to Gbaran-ubie condensate line, 24inch Nembe creek to Sanbath T/L and 30inch Sanbath to Cawthorne channel tie-in M/F
Pipeline desanding and descaling of 24inch buguma to bakana NCTL
New Nembe Creek Trunk line (NCTL) - partook in the design, pre-commissioning, and commissioning
New Kolo Creek Trunk line (KCTL) - partook in the design, laying of pipelines, pre-commissioning, and commissioning
18" GU - Kolo Creek tie-in manifold - partook in the commissioning
Ability to interpret and understand P&IDs, D&IDs, UFDs, PFDs, GA's
Management of design team involved with pipeline project conceptual studies, FEED, detailed design work and construction management
Conduct leak repairs by clamping and sectional replacement on all crude and gas pipelines (swamp and land)
Online routine valves servicing and defective repairs on all types of valves according to the OEM on NCTL and GPHSL
3monthly maintenance of oil and gas vessels
Conduct PIMS analysis and risk-based inspections on selected trunk lines, risers, and pipelines
Conduct flow assurance checks on trunk lines from upstream stations to downstream terminal stations
De-scaling, de-sanding and wax removal on both oil and gas pipelines and vessels
Conduct filling, cleaning, hydrotest, gauging, de-watering and drying of vessels, crude and gas pipelines, and vessels as applicable
Design of workable plan for manifold/facility upgrades at Okordia and Adibawa manifolds
Impressive knowledge/experience over classification of NORM in oil and gas wastes and their method of detection
Knowledgeable on the use of uncompensated GM tube and compensated GM tube in detecting NORM
Conduct maintenance of pipelines by valve change-outs, sectional replacements, barrel door change-outs, rotating and static equipment's maintenance, welding of pipeline accessories (valves, pressure points, pig signalers)
Manifold/riser inspections to ascertain their integrity
Conduct valve leak test using ultrasonic probes
Conduct weekly chemical injection of biocide and other approved corrosion inhibitors to prevent bacterial growth and mitigate corrosion on 20inch kolocreek to Rumuekpe and 24inch Nkpoku to Ogale Trunk line
Conduct crude water and oil sampling and analyze insitu to ascertain the rate of iron growth in the pipeline
Verification of materials suitability for the existing lines and materials selection for new pipelines systems
Conduct monthly Cathodic protection monitoring of pipelines to monitor the rate of protection of all pipelines using company's approved procedures and standards
Conduct ultrasonic measurement at intervals to know the rate of wear of pipelines
Installation of both vertical and horizontal ground beds and transformer rectifiers
General external and internal corrosion control
Use of primavera to plan, monitor and schedule projects, use of SAP for raising work orders and pipeline maintenance
Inventory Management and Spares Maintenance: An Asset Performance Case of Business Continuity and Pigging Spares at AON Crude Pipelines - Inventory Management and Spares Maintenance: An Asset Performance Case of Business Continuity and Pi | Page 1 | Search Results | OnePetro
Challenges at Pipeline Crossings: a Holistic Anatomy of New Mol 1.2 and 3.5 Pipelines Construction - Challenges at Pipeline Crossings: a Holistic Anatomy of New Mol 1.2 and 3.5 Pipelines Construction | Page 1 | Search Results | OnePetro
Sulphate Reducing Bacteria SRB Control and Risk Based SRB Severity Ranking - Sulphate Reducing Bacteria SRB Control and Risk Based SRB Severity Ranking | Abu Dhabi International Petroleum Exhibition and Conference | OnePetro
The Barriers to Smooth Implementation of Diversity as a Workforce Strategy by the Worldwide Oil and Gas Industry - The Barriers to Smooth Implementation of Diversity as a Workforce Strategy by the Worldwide Oil and | Page 1 | Search Results | OnePetro
Languages
English
Proficient (C2)
Affiliations
Authoring
Research
Certification
Chartered Engineer – The Engineering Council United Kingdom/Institute of Materials
Mechanical Engineer (Rumailla oilfied operations) - on British Petrol/ROO Project
Petrofac Engineering and Construction
02.2012 - 08.2013
Pipeline/Flow assurance engineer
Shell petroleum development company
12.2004 - 01.2012
Master of Science - Materials Engineering
University of Derby
Bachelor of Engineering - Mechanical Engineering
Federal University of Agriculture
Similar Profiles
Fatima Abdulla Hasan Al HosaniFatima Abdulla Hasan Al Hosani
Senior Master Plan Engineer (Wells and Clusters) at Abu Dhabi National Oil Company, ADNOC OnshoreSenior Master Plan Engineer (Wells and Clusters) at Abu Dhabi National Oil Company, ADNOC Onshore