Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Varun Mohanan

Sharjha

Summary

Critical-thinking Quality Control Engineer with[4.5] years of experience facilitating structural steel quality process improvements. Proficient in interpreting quality metric data and applying analysis methods to enhance product designs. Initiates quality control objectives to resolve production problems, maximize product reliability and minimize costs.

Overview

5
5
years of professional experience
1
1
Certification

Work History

QA/QC Engineer

ROYAL STEEL FABRICATION L.L.C SHARJHA
05.2022 - Current
  • Adhered to federal guidelines for quality control inspection.
  • Inspected raw materials and finished products to verify quality and disposed items that did not meet safety requirements.
  • Developed and audited practices, programs, and reporting system metrics for optimal efficiency.
  • Documented and executed detailed test plans and test cases and summarized and logged audit findings for reporting purposes.
  • Determined root cause of deviations and non-conforming results and implemented appropriate
  • corrective and preventive actions throughout product development process.
  • Tested welders for understanding of code and proficiency in different environments.
  • Reviewed specifications in order to assess contractor compliance with design.
  • Maintained current knowledge of [Description] codes.
  • Wrote welding policies and specifications for jobs.
  • Examined products for imperfections and defects.
  • Recorded inspection and test results on data sheets.
  • Followed standard operating procedures for inspections and tests.

PROJECTS WORKED

WILLIAM HARE U .A .E

  • GOLDEN PASS LNG EXPORT PROJECT
  • ASSUIT HYDROCRACKING COMPLEX(AHC)EGYPT
  • GBC PRECRUSHER PROJECT(SAG 3)
  • TECHNIP ITALY S.P.A
  • PLAQUEMENS L.N.G POJECT,U.S.A
  • ROTTERDAM CAPACITY GROWTH,NETHERLAND
  • KASUANG COPPERCLEANER CIRCUIT

ASSENT STEEL INDUSTRIES

  • MANYAR SMELTER PROJECT

AMITY ENGINEERING

  • 105 DEGREE CELECIUS HOT WATER GENERATOR PLATEFORM
  • EXTERNAL PIPE RACK(ROAD CROSS OVER)


FACILITY TEAM MEMBER

TVS MOTOR COMPANY LIMITED
11.2021 - 02.2022
  • PREVENTIVE MAINTENANCE OF AHU(air handling unit),pumps,motor burner and general equipments
  • break down maintenance
  • paint shop maintenance
  • equipment maintenance
  • maintenance of conveyor
  • yaskawa 6 axis robot atomizer service
  • graco 2ks pro mix service


QC Welding Inspector

SHAKTHI ENGINEERS
03.2019 - 10.2021
  • Tested welders for understanding of code and proficiency in different environments.
  • Reviewed specifications in order to assess contractor compliance with design.
  • Examined products for imperfections and defects.

Education

Bachelor of Technology - ENGINEERING

CET PAYYANUR
KANNUR UNIVERSITY
08.2020

PLUS TWO -

C.P.N.M G.H.S.S MATHAMANGALAM
KERALA,INDIA
03.2014

S.S.L.C -

C.P.N.M G.H.S.S MATHAMANGALAM
KERALA,INDIA
03.2011

Skills

  • CSWIP 31(CUSTOMER ID:767480)
  • BGAS GRADE 2
  • ISO IMS LEAD AUDITOR(FROM TUV SW)
  • CATIA V5R10

Certification

  • CSWIP 3.1
  • BGAS GRADE 2
  • ISO IMS LEAD AUDITOR(FROM TUV)

Languages

English
Bilingual or Proficient (C2)
Hindi
Bilingual or Proficient (C2)
Malayalam
Bilingual or Proficient (C2)
Tamil
Elementary (A2)

Timeline

QA/QC Engineer

ROYAL STEEL FABRICATION L.L.C SHARJHA
05.2022 - Current

FACILITY TEAM MEMBER

TVS MOTOR COMPANY LIMITED
11.2021 - 02.2022

QC Welding Inspector

SHAKTHI ENGINEERS
03.2019 - 10.2021

Bachelor of Technology - ENGINEERING

CET PAYYANUR

PLUS TWO -

C.P.N.M G.H.S.S MATHAMANGALAM

S.S.L.C -

C.P.N.M G.H.S.S MATHAMANGALAM
  • CSWIP 3.1
  • BGAS GRADE 2
  • ISO IMS LEAD AUDITOR(FROM TUV)
Varun Mohanan