Summary
Overview
Work history
Education
Skills
Certification
Languages
Personal Information
Custom Section
Timeline
Generic
VIPINDAS CHIRIYATH POYIL

VIPINDAS CHIRIYATH POYIL

Etakkad,INDIA

Summary

Accomplished professional with extensive expertise in piping design, fabrication, and CAD design. Demonstrates proficiency in isometric drawings, blueprint reading, and quality control, ensuring high standards in mechanical systems and test package preparation. Skilled in pneumatic and hydraulic systems, with a strong focus on safety inspections and pipeline preventive maintenance. Adept at troubleshooting piping issues and conducting field inspections with a keen understanding of ASME standards. Committed to innovation and quality assurance, leveraging leadership excellence to drive team success. Career goals include advancing expertise in gas piping systems while maintaining a focus on health and safety consciousness.

Overview

19
19
years of professional experience
2007
2007
years of post-secondary education
1
1
Certification

Work history

Piping supervisor

LINDE GAS AMERICA
Abu Dhabi, UAE
06.2025 - Current
  • Supervised installation of piping systems, ensuring strict compliance with safety regulations.
  • Coordinated workflows among teams to optimise project efficiency and timelines.
  • Trained and mentored junior staff on best practices in piping installation and maintenance.
  • Evaluated project drawings and specifications for accurate implementation of designs.
  • Oversaw steel structural fabrication and erection processes.
  • Managed modular unit piping and skid fabrication along with installation activities.

CONSTRUCTION SUPERINTENDENT MECHANICAL

LINDE ENGINEERING INDIA
SURAT, GUJARAT
08.2024 - 06.2025
  • Monitors overall job site health, safety and environment performance and verifies that contractors are protecting their workers at the job site
  • Responsible for construction supervision and administration including supervision of contractors and their subcontractors for assigned portions of the project
  • Assists in the coordination of the design deliverables to support continuous and efficient construction
  • Job site point of contact for all contractors in his assigned area of the project participates in safety reporting, and programs and initiatives
  • Communicates the identification, management and resolution of deficiencies and nonconformance to the Construction Manager
  • Assists with construction estimating, scheduling, cost control and reporting for all work being performed by the contractor in his assigned area of the project.

PIPING SUPERVISOR

LINDE ENGINEERING RUSSIA PROJECT AMUR
02.2018 - 05.2022
  • Company Overview: (Module Fabrication for Nederland Blue H2)
  • Control of compliance with construction contracts, specifications and requirements of the project by contractors under 'Process Piping' discipline.
  • Controls construction and installation work on the construction site, including installation of process piping components, participates in the acceptance of performed works by contractors under the 'Piping' discipline.
  • Responsible Carrying out of control checks of items delivered to site and piping items, included in pre-fabricated spools, required for construction of process piping object.
  • Inspection and performance of quality check of installed process piping systems in accordance with written specifications and isometric drawings, prepares punch items list and participates in accepting of contractor's work.
  • Coordination and supervision of work on clearance of punch points by Sub-contractors in the discipline 'Process Piping Systems.
  • Inspection of pressure test and air blowing of piping test circuits.
  • Check of 3D models and isometric drawings, develops safe working plan for installation works.
  • Carrying out of control checks of items delivered to site and piping items, included in pre-fabricated spools, required for construction of process piping object.
  • Establishing and addition of the overview with items delivered to site, checked and installed.
  • (Module Fabrication for Nederland Blue H2)

PIPING/MECHANICAL SUPERVISOR

LINDE ENGINEERING RUSSIA, LCC LINDE AZOT
02.2016 - 05.2017
  • To ensure the compliance by the personnel of suppliers and contractors to HSE standards, monitor the conformity of the work permits to relevant work activities.
  • Supervise and control site activities, Temporary site facilities and implementation of legal, Contractual and internal professional HSE regulations of the client, Controls the use of the PPE.
  • Responsible for daily inspection and final verification that all piping installed are in accordance with isometric drawing, P&ID's Project specification and standard.
  • Ensure proper As-Built, Coordinate and supervise work on clearance of punch point and Final reinstatement of the packages as per test circuit and release for Pressure testing.
  • Final release of test package.
  • Well understand and be able to interpret all technical documents including Clients Engineering Drawings / Specifications / Procedures/Programs, Vendors Drawings / Specifications / Manuals, subcontractors Drawings / Procedures / Manuals.
  • Ensuring all piping general requirement to avoid and eliminates reworks. Involve in Testing, Flushing, Drying, Reinstatement, Commissioning work.
  • Coordination with the Designated Clients and Area on Responsibilities.

PIPING SUPERVISOR

TR-YAMATA VOLGOGRAD RUSSIA VGO DEEP CONVERSION PLANT
VOLGOGRAD
11.2014 - 12.2015
  • Final Project account Works, material inventory and quantity survey.
  • Preparing test packages for piping.
  • Distributes Test Packages to Inspectors and Line Checkers for Site Confirmation and Verification.
  • Review and Coordination of NDE and Outstanding Inspection.
  • Monitors, Records and Clearing of QC Related Punch Items.
  • Conduct incoming material inspection in accordance with the specifications & drawings.
  • Ensures that all welds meets the Project Requirements and in accordance to the WPS.
  • Reviewing the test package for the documentation correctness and preparation of quality documents for hydro test package preparing the weld history according to the NDT requirements and project specification.
  • QA/QC documentations review and approvals.
  • Responsible for daily inspection and final verification that all piping installed are in accordance with isometric drawing, P&ID's Project specification and standard.
  • Review the punch list line checking for reinstatement and mechanical completion of piping system.
  • Coordination with the Designated Clients and Area on Responsibilities.
  • Closing of punch list before/after the pressure test on completed pipelines.
  • Final Release and Sign off of Test Packages.

Test Package Piping / Welding Inspector

TECHNIMONT - YAMATA RUSSIA, SIBUR PDH POLYMER PROJECT
11.2012 - 07.2013
  • Final Project account Works, material inventory and quantity survey.
  • Preparing test packages for piping.
  • Distributes Test Packages to Inspectors and Line Checkers for Site Confirmation and Verification.
  • Review and Coordination of NDE and Outstanding Inspection.
  • Monitors, Records and Clearing of QC Related Punch Items.
  • Conduct incoming material inspection in accordance with the specifications & drawings.
  • Ensures that all welds meets the Project Requirements and in accordance to the WPS.
  • Reviewing the test package for the documentation correctness and preparation of quality documents for hydro test package preparing the weld history according to the NDT requirements and project specification.
  • QA/QC documentations review and approvals.
  • Responsible for daily inspection and final verification that all piping installed are in accordance with isometric drawing, P&ID's Project specification and standard.
  • Review the punch list line checking for reinstatement and mechanical completion of piping system.
  • Coordination with the Designated Clients and Area on Responsibilities.
  • Closing of punch list before/after the pressure test on completed pipelines.
  • Final release and sign off Test Packages.

Test Package/Welding Inspector

Linde Gama PEARL GTL 299 Project - Qatar
03.2009 - 01.2012
  • Company Overview: Shell Pearl GTL 299 Project, Ras Laffan, Qatar
  • Preparing test packages for piping.
  • Distributes Test Packages to Inspectors and Line Checkers for Site Confirmation and Verification.
  • Monitors, Records and Clearing of QC Related Punch Items.
  • Review the punch list line checking for reinstatement and mechanical completion of piping system.
  • Coordination with the Designated Clients and Area on Responsibilities.
  • Closing of punch list before/after the pressure test on completed pipelines.
  • Final Release and Sign off of Test Packages.
  • Review and Coordination of NDE and Outstanding Inspection.
  • Ascertains that Safety for Welding, Testing and Related Activities are being implemented.
  • Inspecting the fit-up activities as per the approved drawing, WPS and the project specification.
  • Witnessing procedure qualification record welding test according to WPS, procedure qualification record according to ASME Section IX.
  • Reviewing Filler Wires and electrodes of welding procedure specification according to ASME Section II Part C & also checking while welding inspection.
  • Ensuring all piping general requirement to avoid and eliminates reworks. Involve in Testing, Flushing, Drying, Reinstatement, Commissioning work.
  • Shell Pearl GTL 299 Project, Ras Laffan, Qatar

QA/QC Inspector

TECHNIMONT, Gama Industry Arabia
Al-Jubail
03.2007 - 12.2008
  • Company Overview: Al-Jubail, KSA
  • Reviewing Filler Wires and electrodes of welding procedure specification according to ASME Section II Part C & also checking while welding inspection.
  • Witnessing procedure qualification record welding test according to WPS, procedure qualification record according to ASME Section IX.
  • Ascertains that Safety for Welding, Testing and Related Activities are being implemented.
  • Weld visual inspections.
  • Proper implementation of WPS before and during welding.
  • Controlling the welding of joints according to Isometric Drawings and checking Diameter, Thickness, Drawing Number & Class in Welding Progress Report.
  • Al-Jubail, KSA

NDT Inspector

Plus Tech Engineering Private Limited
Jamnagar, INDIA
02.2007 - 03.2007
  • Plan, coordinate and supervise the inspection activities at site.
  • Arranging (NDT) preventive maintenance progress upon schedule and responsible for the proper inspection request.
  • Verify that the NDT and tests have been carried out as per request.
  • Review of QA/QC part of final documentations.
  • Maintain inspection documentations; prepare inspection reports, correspondence and other written materials.
  • All other necessary inspection, tests, checks, review and the like required to meet the Company Quality Control and Quality Assurance objectives.
  • Coordinate of radiographic work requirement for any particular task and verifying the interpretation of radiographic films.
  • Co-ordination of NDT activities viz. RT, UT, MT and PT evaluation of discontinuities.
  • Evaluation of discontinuous for different type of metals and weld joints by RT, UT, MT, PT and Post weld Heat Treatment, Weld Repair etc.

Education

Diploma - Mechanical Engineering

Kerala Academy of Engineering & ITC

High School Diploma - Business

Higher secondary
india
03.2000 - 03.2002

Skills

  • Isometric Drawings
  • Blueprint Reading
  • Piping Design
  • Fabrication
  • CAD Design
  • Quality control
  • Mechanical system
  • Test Package Preparation
  • Pneumatic systems
  • Hydraulic systems
  • Machining
  • NDT testing
  • Gas & cryogenic Piping
  • Flange alignment Rotating
  • Static
  • Quality Assurance
  • Documentation
  • Innovation
  • Communication
  • Decision Making
  • Teamwork
  • Flexibility
  • Networking
  • Computer Literacy
  • Adaptability
  • Understanding of steam tracing
  • Piping system knowledge
  • Decision-Making capability
  • Knowledge in asme standards
  • Leadership excellence
  • Pipeline inspection expertise
  • Health and safety consciousness
  • Familiarity with insulation materials
  • Troubleshooting piping issues
  • Field inspection competence
  • Welding techniques
  • Procurement expertise
  • Critical decision making
  • AutoCAD proficiency
  • Team player
  • Materials procurement
  • Safety inspections
  • Pressure testing
  • Hydrostatic testing
  • Pipeline preventive maintenance
  • Gas piping expertise
  • Time efficiency
  • Quality focus

Certification

  • CERTIFIED WELDING INSPECTOR CWI (IND)
  • ASNT LEVEL 2 (RADIOGRAPHY, ULTRASONIC, PENETRAT AND MAGNETIC PARTICLE(IND)
  • CERTIFIED GAS TUNGSTEN ARC WELDING (QP No-ISC/Q0911)
  • Cybersecurity eLearning - Safe and Secure
  • Productivity at a Glance
  • Final Test- HSE Passport Phase 2 - Construction or Project Site
  • Corruption Prevention (Engineering)


Languages

English
Hindi
Malayalam
Tamil

Personal Information

  • Passport Number: S6714714
  • Passport Date Of Issue: 2018-10-11
  • Passport Place Of Issue: KOZHIKODE
  • Passport Expiry Date: 2028-10-10
  • Title: CONSTRUCTION SUPERINTENDENT MECHANICAL
  • ID Type: Passport
  • ID Number: S6714714
  • Date of birth: 25.12.1981
  • Gender: Male
  • Nationality: INDIAN
  • Marital status: Married

Custom Section

  • Preservation of Pressure tested Pipe lines (FSI) (LINDE-JGC/KBR)
  • Seven QC Tools used - GAMA
  • Permit to work applicant -KGC/KBR

Timeline

Piping supervisor

LINDE GAS AMERICA
06.2025 - Current

CONSTRUCTION SUPERINTENDENT MECHANICAL

LINDE ENGINEERING INDIA
08.2024 - 06.2025

PIPING SUPERVISOR

LINDE ENGINEERING RUSSIA PROJECT AMUR
02.2018 - 05.2022

PIPING/MECHANICAL SUPERVISOR

LINDE ENGINEERING RUSSIA, LCC LINDE AZOT
02.2016 - 05.2017

PIPING SUPERVISOR

TR-YAMATA VOLGOGRAD RUSSIA VGO DEEP CONVERSION PLANT
11.2014 - 12.2015

Test Package Piping / Welding Inspector

TECHNIMONT - YAMATA RUSSIA, SIBUR PDH POLYMER PROJECT
11.2012 - 07.2013

Test Package/Welding Inspector

Linde Gama PEARL GTL 299 Project - Qatar
03.2009 - 01.2012

QA/QC Inspector

TECHNIMONT, Gama Industry Arabia
03.2007 - 12.2008

NDT Inspector

Plus Tech Engineering Private Limited
02.2007 - 03.2007

High School Diploma - Business

Higher secondary
03.2000 - 03.2002

Diploma - Mechanical Engineering

Kerala Academy of Engineering & ITC
VIPINDAS CHIRIYATH POYIL