Summary
Overview
Work History
Education
Skills
Certification
DECLARATION
Software
Timeline
Generic
Vithun Kumar

Vithun Kumar

Senior Construction Engineer
Abu Dhabi

Summary

Results-driven Mechanical Engineer with over 18 years of diverse experience in construction, fabrication, project coordination, site management, and engineering design within the Oil & Gas and Renewable Energy sectors. Currently serving as a Senior Construction Engineer at NMDC Energy (formerly NPCC), specializing in the construction of offshore jack-up drilling rigs, offshore wind farm jackets, Saudi Aramco Production Deck Modules (PDMs), seismic vessels, and tug vessel refurbishment. Recognized for a strong work ethic and exceptional organizational skills, consistently delivering high-quality results through sound decision-making both independently and within high-performing teams. Committed to driving innovation and efficiency in engineering projects while fostering collaborative relationships across multidisciplinary teams.

Overview

18
18
years of professional experience
4
4
Certifications
4
4
Languages

Work History

Senior Construction Engineer

NMDC Energy (Formerly NPCC)
02.2023 - Current

Projects Handled

Project: Construction of ZulF Production Deck Modules (PDMs)

Client: Saudi Aramco

Duration: Feb 2023 – Present


Responsibilities:

  • Ensure strict compliance with Health, Safety, and Environmental (HSE) standards across all project activities.
  • Manage daily construction operations to ensure alignment with project schedules and timelines.
  • Oversee construction activities to maintain quality standards and meet contractual obligations.
  • Collaborate with the construction team to promptly resolve on-site issues and technical challenges.
  • Prepare and submit detailed progress reports to clients and internal stakeholders.
  • Track project performance against key milestones and proactively report risks or deviations.
  • Coordinate with senior management to address and resolve contractual or operational matters.
  • Supervise and mentor Yard Engineers, providing technical guidance to enhance team performance.
  • Identify and resolve technical issues to improve project execution efficiency.
  • Maintain clear and timely communication with clients regarding project status, changes, and concerns.
  • Prepare job instructions and initiate variation proposals to optimize cost and efficiency.
  • Monitor subcontractor performance to ensure adherence to schedule and quality benchmarks.
  • Review and validate engineering drawings and deliverables to ensure compliance with project requirements.
  • Detect and correct discrepancies between design documents and specifications in a timely manner.
  • Coordinate cross-functional activities to ensure seamless integration across departments.
  • Optimize task durations and workflows to enhance execution efficiency and minimize delays

Senior Construction Engineer

Lamprell energy Ltd
04.2018 - 01.2023

Projects Handled

Project: Construction of two LeTourneau 116E ABS-class new-built jack-up drilling rigs.

Client: ARO Drilling

Duration: May 2020 – Present


Project: Constructability review, project readiness, and fabrication of Wind Turbine Generator (WTG) jacket foundations.

Client: Moray Offshore Windfarm East

Duration: Jan 2019 – Jan 2020


Project: BRRI Pipeline Replacement Project – bidding, schedule development, fabrication, testing, and load-out of risers, subsea pipeline spools, and structural components.

Client: Saudi Aramco

Duration: May 2018 – Dec 2019


Responsibilities:

  • Ensure compliance with Health, Safety, and Environmental responsibilities and ensure all project work is executed safely.
  • Reviewing the 4 weeks, look ahead with all discipline project supervisors and production team and taking necessary action to meet the schedule.
  • Prepare project specific procedures, fabrication execution plan and method statements for structural and piping fabrication & installation works according to company standards and principles.
  • Reviewing of constructability and IDC drawings.
  • Prepare construction 'work-pack norms' and allocate work-packs for fabrication and construction activities in line with schedule requirements.
  • Attending weekly Project meeting and Engineering/Procurement interface meetings.
  • Liaise with PM and CM with reference to project production issues.
  • Coordinating with pipe shop, Fabrication shop and Fabrication pads to ensure fabrication on-going at above locations as per schedule.
  • Coordinating with supervisors for solving various technical issues at site/shops etc.
  • Make sure As-built drawings are submitted by Production to QC as per engineering requirements.
  • Preparation of Field change request along with red line mark-up, as per the changes identified.
  • Coordinate with warehouse and QC for prioritizing the material inspection and release to production.
  • Preparation of weekly progress report and submit to planning.
  • Maintaining issue register to record all the issues such as drawing issues, material issues, site issues etc. Maintain the lesson learnt register for the project for future reference.
  • Interfacing and coordinating between all the disciplines for the mechanical completion and assist commissioning team for the startup operations.
  • Conducted thorough site investigations to identify potential issues before the start of construction activities.
  • Implemented sustainable building practices to minimize environmental impact and lower operating costs for clients.
  • Led weekly progress meetings with key stakeholders to review accomplishments, address concerns, and set priorities for upcoming tasks.
  • Spearheaded initiatives aimed at improving overall company performance including technological advancements adoption.

Construction Engineer

Lamprell energy Ltd
07.2013 - 04.2018

Projects Handled

Project: Fabrication, assembling and loadout of Jackets foundations East Anglia one offshore Wind farm project.

Client: Scottish Power Renewables

Duration: August 2017 to April 2018


Project: Construction of six LeTourneau 116E ABS class new built Jack-up rigs for various clients.

Client: NDC, Ensco and Jindal Drilling company

Duration: July 2013 to July 2017.


Responsibilities:

  • Ensure compliance with Health, safety, and Environmental responsibilities and ensure all project work is executed safely.
  • Reviewing the 4 weeks, look ahead with all discipline project supervisors and production team and taking necessary action to meet the schedule.
  • Prepare project specific procedures, fabrication execution plan and method statements for structural and piping fabrication & installation works according to company standards and principles.
  • Reviewing of constructability and IDC drawings.
  • Prepare construction 'work-pack norms' and allocate work-packs for fabrication and construction activities in line with schedule requirements.
  • Attending weekly Project meeting and Engineering/Procurement interface meetings.
  • Liaise with PM and CM with reference to project production issues.
  • Coordinating with pipe shop, Fabrication shop and Fabrication pads to ensure fabrication on-going at above locations as per schedule.
  • Coordinating with supervisors for solving various technical issues at site/shops etc.
  • Make sure As-built drawings are submitted by Production to QC as per engineering requirements.
  • Preparation of Field change request along with red line mark-up, as per the changes identified.
  • Coordinate with warehouse and QC for prioritizing the material inspection and release to production.
  • Preparation of weekly progress report and submit to planning.
  • Maintaining issue register to record all the issues such as drawing issues, material issues, site issues etc. Maintain the lesson learnt register for the project for future reference.
  • Interfacing and coordinating between all the disciplines for the mechanical completion and assist commissioning team for the startup operations.

Piping Engineer

Drydocks World Dubai
12.2009 - 03.2013

Projects Handled

Project: Refurbishment of P161 UAE Navy Corvette vessel.

Client: UAE Navy

Duration: Mar-2012 to Mar-2013


Project: Construction of two Seismic Vessels (NB69 & NB70)

Client: Polarcus

Duration: Dec-2009 to Mar-2012


Responsibilities:

  • Prepared project specific procedures and method statements for piping fabrication & installation works according to company standards.
  • Review/ interpret design drawings for constructability and interfaced with design team and construction team to develop the optimum piping design required for construction.
  • Provide clarification of drawings, specifications, and other technical documents as necessary to support Construction.
  • Liaise closely with project managers, planning and production team to schedule and execute all the work related to the project.
  • Performed field walk downs and inspections to review work for conformance with design requirements, applicable codes/standards, and project procedures.
  • Support the Piping Supervisor and foreman in resolving issues related to applicable piping fabrication and installation activities.
  • Prepare & perform to estimate man-hour and manpower forecasts.
  • Reviewed the piping activities and completed them accordance with schedule requirements.
  • Followed up the project schedule and ensured all materials & drawings were timely available for construction.
  • Coordinated with the procurement department for material ordering, follow-up and corrective actions as required.

Senior Design Engineer

Conceptia Software Technologies Ltd
08.2007 - 09.2009

Projects Handled

Project: Designing of Seismic Vessels (NB69 & NB70), Design of a completely outfitted & equipped, Anchor handling tug vessel.

Client: Drydocks world, Dubai, BSL, Mumbai

Duration: Aug-2007 to Sep-2009


Responsibilities:

  • Used AutoCAD and Tribon software to produce high-quality designs, drawings and layouts to project specifications.
  • Constantly met compliance targets by testing, validating and documenting designs to global industry standards.
  • Minimized risk of error by accurately creating and maintaining Bills of Materials (BOM).
  • Study the process requirements and site conditions to design and plan the mechanical equipment layout and piping systems that can support the process operations work.
  • Development of project specifications, piping layouts, design calculations, stress analysis, procurement specifications and material engineering.
  • Prepare piping material specifications (i.e., size calculations, schematic diagram design, P&ID diagram, and layout plans for procurement purposes.
  • Design and model piping systems including support using 3D modelling software.
  • Attend meetings with the client to discuss and resolve the design-related issues observed by the clients.
  • Prepared piping general arrangements, detail drawings and Material Take-offs (MTOs).
  • Prepared equipment layout drawings and developed them in accordance with corporate and project procedures.

Education

Bachelor of Engineering - Mechanical

V.L.B. JCET
Coimbatore, India
08.2005

Certificate of Higher Education - Computer Science

R.K.V. Matriculation Hr. Sec. School
Coimbatore, India
03.2001

Skills

Leadership, Commitment, and team building

undefined

Certification

Six sigma white belt - Certified

DECLARATION

I hereby declare that the above written particulars are true to the best of my knowledge and belief VITHUN KUMAR U

Software

MS office

MS Project

Auto CAD

Navisworks

PIMS, SAP and Oracle

Timeline

Senior Construction Engineer

NMDC Energy (Formerly NPCC)
02.2023 - Current

Senior Construction Engineer

Lamprell energy Ltd
04.2018 - 01.2023

Construction Engineer

Lamprell energy Ltd
07.2013 - 04.2018

Piping Engineer

Drydocks World Dubai
12.2009 - 03.2013

Senior Design Engineer

Conceptia Software Technologies Ltd
08.2007 - 09.2009

Certificate of Higher Education - Computer Science

R.K.V. Matriculation Hr. Sec. School

Bachelor of Engineering - Mechanical

V.L.B. JCET
Vithun KumarSenior Construction Engineer