Summary
Overview
Work history
Education
Skills
Websites
PERSONAL DETAILS
Accomplishments
Timeline
Generic
VYAS NELLIPARAMBIL SREEDHARAN

VYAS NELLIPARAMBIL SREEDHARAN

Abu Dhabi,UAE

Summary

POSITION APPLIED FOR : SENIOR CONSTRUCTION SUPERINTENDENT/ LEAD CONSTRUCTION ENGINEER

  • Results-driven professional with extensive experience in site management, electrical operations, and construction management.
  • Proven track record in project scheduling, contractor oversight, and compliance with safety regulations.
  • Expertise in technology transfer and value engineering to enhance service strategies and ensure quality assurance.
  • Committed to effective team leadership and training, maintaining high standards in site inspections and contract reporting.
  • Established Construction Manager skilled in client, team and contractor engagement for positive project outcomes.
  • Monitors performance and identifies delivery gaps, implementing swift solutions to maintain progress.
  • Plans and prioritizes well to achieve cost, quality and timeframe objectives..

Major Clients worked with.

  • ADNOC
  • Kuwait Oil Company ( KOC).
  • Kuwait National Petroleum Company (KNPC)
  • EQUATE Petrochemicals ( DOVE Chemicals).
  • British Petroleum ( BP)
  • Arabian Oil company ( AOC).
  • QGPC / QAFAC.
  • PETRONET
  • POWER GRID CORPORATION
  • COCHIN REFINERIES ( BPCL)


PROJECTS HANDLED / WORKED:


  • GATHERING CENTRE 32 ( GC32) BELONGS TO KUWAIT OIL COMPANY.
  • GATHERING CENTRE 29 ( GC29) BELONGS TO KUWAIT OIL COMPANY.
  • EFFLUENT WATER INJECTION PROLJECT, NK, BELONGS TO KUWAIT OIL COMPANY.
  • 30 " PIPE LINE FROM NORTH KUWAT TO SOUTH KUWAIT. BELONGS TO KUWAIT OIL COMPANY.
  • POWER DISTRIBUTION PROJECT TO ESP WELL PROJECT BELONGS TO KUWAIT OIL COMPANY.
  • INSALLA GAS PROJECT WITH BRITISH PETROLEUM AND GAS
  • UPGRADATION OF UNDERGROUND FACILITIES BELONGS TO KUWAIT OIL COMPANY.
  • B2 AND NEW A 142 SUBSTATION AT SEK PROJECT BELONGS TO KUWAIT OIL COMPANY.
  • MODERNISATION OF CENTRAL CONTROL ROOM BELONGS TO KNPC.
  • EXTENSION OF HEADERS PROJECT BELONGS TO KUWAIT OIL COMPANY.
  • OLEFLEX HEATER AND MTBE FACILITY PROJECT BELONGS TO QGPC, QATAR.
  • KUWAIT POLY PROPELENE PROJECT BELONGS TO DOVE AND PIC, KUWAIT.
  • ON SHORE GAS DEVELOPMENT PROJECT AT HABSHAN, BELONGS TO ADNOCE.
  • POWER DISTRIBUTION PROJECT FOR SAUDI ARABIAN TEXACO
  • CATHODIC PROTECTION PROJECT AT ARABIAN OIL COMPANY AT AL KHAFJI, SAUDI ARABIA.
  • 72 MW SUBSTATION PROJECT AT NORTH KUWAIT BELONGS TO KUWAIT OIL COMPANY.
  • CONSTRUCTION OF COMMUNICTY CENTRE AT POWER GRID, INDIA.


Overview

34
34
years of professional experience
5998
5998
years of post-secondary education

Work history

Construction Manager (E&I)

Contracting com to ADNOC at Zirku Island, AbuDhabi
Zirku Island
09.2024 - 08.2025
  • Coordinated Belbazem Gas Development Project with ADNOC and NMDC at Zirku Island since September 2024.
  • Planned work schedules to ensure timely task completion.
  • Managed construction projects from initial planning through to final completion.

Construction manager

Al Ahelia Switchgear Company
Kuwait
11.2023 - 08.2024
  • Led construction of 72MW, 11KV main intake substation and new area substations for Kuwait Oil Company.
  • Developed comprehensive project plans to ensure successful execution and timely delivery.
  • Facilitated team collaboration to promote innovative solutions across projects.

Project Manager

Aaker Engineers and contractors India
Thrissur, India
07.2020 - 06.2022
  • Directed efforts with Aaker Engineers and contractors for Power Grid Corporation project.
  • Led construction of community centre at 320KV HVDC terminal, KVA campus in Thrissur.
  • Ensured alignment with project goals and standards throughout execution.

Sr. Construction Superintendent

Petrofac International Ltd
09.2006 - 05.2020
  • Worked with Petrofac International Ltd from September 2006 to till 15th May 2020 for various Projects in Kuwait and Algeria as Sr. Construction Superintendent.
  • Projects handled / worked with:
  • New Gathering Centre 32 (GC32) Project with Kuwait Oil Company at South East Kuwait.
  • New Gathering Centre 29 (GC29) Project with Kuwait Oil Company at North Kuwait.
  • Effluent water injection phase -1 and Sea water injection phase -2 projects with Kuwait Oil Company at North Kuwait.
  • Power Distribution Project for ESP wells with Kuwait Oil Company at North Kuwait. Associated with project team for preparation of BOQ’s for elevated substations for Kuwait Oil Company at North Kuwait.
  • 40” pipe line from BS 131 to Mina Al Ahmadi refinery project with Kuwait Oil Company.
  • In Sallah Gas Compression Project in Algeria, as a joint venture of British Petroleum and Sonatrach, Algerian Govt Gas authority.
  • Facility upgrade and relocation of underground facilities project with Kuwait Oil Company at South Kuwait.
  • Assisted for preparation of bill of quantities BOQ’s for the new elevated substation project with Kuwait Oil company for various GC’s during proposal stage. Attended meetings with proposals team at Sharjah for multiple occasions.
  • Collaborated effectively with subcontractors, ensuring quality workmanship.
  • Delegated tasks efficiently amongst team members for optimal workforce utilisation.
  • Managed large-scale construction projects, ensuring timely completion.
  • Conducted regular site inspections, maintaining high-quality standards.
  • Enhanced workflow efficiency through strategic planning and scheduling.

Construction engineer

Equate Petrochemicals ( DOVE Chemicals )
Kuwait
04.2005 - 08.2006
  • Oversaw engineering and construction activities as primary contact at EQUATE Petrochemicals.
  • Facilitated communication with Fluor for seamless integration on OLEFIN 2 project.
  • Assessed contractor credentials and authorised key personnel for multiple contracts.
  • Monitored construction work packages, leading regular progress review sessions.
  • Coordinated efforts between Fluor and construction contractors to maintain project integrity.
  • Adhered to EQUATE work procedures and safety protocols during all phases.
  • Directed modifications of 11 kV panels for OLEFIN 2 project implementation.
  • Drove successful turnaround project delivery in collaboration with M/s. Heston Kuwait.

Electrical Project Engineer

Bader Al Mulla Bros
Kuwait
08.2004 - 09.2005
  • Drove execution of Khiran Pearl City Project as Electrical Project Engineer.
  • Conducted site visits to monitor progress and resolve issues promptly.
  • Ensured adherence to budget, schedule, and quality standards throughout project lifecycle.
  • Represented company in weekly meetings, generating comprehensive progress reports.
  • Oversaw electrical works for 54 distribution substations, including extensive cable laying.
  • Ensured compliance with all electrical standards during project implementation.

Electrical Project Manager / Engineer

Al-Meer Technical Services Co WLL
Al Ahmadi, Kuwait
11.2001 - 09.2004
  • Managed design of projects to align with KOC schedules and obtain approvals for key personnel.
  • Oversaw procurement coordination for entire electrical system, including two 11 KV substations and 35 switchgears.
  • Directed installation of approximately 300 KM of 11 KV cables, HVAC systems, fire alarms, and lighting.
  • Executed system studies using ETAP Power Station; led testing and modification of 11 KV panels.
  • Supervised skilled and unskilled manpower for construction of electrical and instrumentation facilities.
  • Conducted comprehensive management of electrical construction for control rooms and substations.
  • Completed surveys, designs, and detailed engineering for control panels, UPS panels, and telecommunication systems.
  • Delivered significant projects including New B2 Substation load distribution and Central Control Room modernization.

Electrical Engineer

Dodsal Ltd
Coimbatore, India
11.2000 - 09.2001
  • Executed detailed engineering and load surveys for substations and cabling systems.
  • Conducted installation, testing, and commissioning of 11KV/400V substations and UPS systems.
  • Implemented fire alarm systems and earthing solutions for control room electrification.
  • Oversaw cathodic protection for underground pipelines and street lighting installations.
  • Attended progress review meetings for booster pump stations and intermediate stations.
  • Managed sectionalising valve stations as part of Cochin Coimbatore Karur pipeline project.

Electrical Engineer

Foster Wheeler Fired Heater Ltd
Doha, Qatar
06.1998 - 04.1999
  • Executed installation, testing, and commissioning of substation lighting systems and fire alarm cabling.
  • Oversaw electrification of control room lighting and lightning protection systems for methanol reformer.
  • Installed distribution boards, junction boxes, and managed cable laying and termination tasks.
  • Implemented cathodic protection for underground pipelines and street lighting installations.
  • Participated in progress review meetings to track project advancements.

Electrical supervisor

Asahi Techneon LLC
Shuaiba Industrial Complex, Kuwait
01.1997 - 10.1997
  • Implemented preventative maintenance procedures on critical components to prevent breakdowns.
  • Minimised downtime by responding promptly to system faults and malfunctions.
  • Applied extensive knowledge of electrical systems for effective problem resolution.
  • Coordinated training sessions that enhanced staff competency and performance.

Project engineer

Al Jahmali Trading and Contracting Co
Al Khafji, Kingdom of Saudi Arabia
05.1996 - 02.1997
  • Executed installation and commissioning of 11KV cables from MEW substation to pumping stations for Saudi Arabian Texaco Inc.
  • Conducted testing of 13.8KV HT cubicles and cable terminations in Arabian Oil Company residential complex.
  • Managed installation of distribution boards, junction boxes, and lighting cable layout at project sites.
  • Oversaw earthing procedures and testing of HT cables across various locations.

Electrical supervisor

Consolidated Contractors International Company
Habshan, Abu dhabi, UAE
05.1995 - 04.1996
  • Collaborated with Consolidated Contractors International Company on SCADA shelter installations.
  • Executed installation of Remote Terminal Units, solar power cells, and cable terminations.
  • Implemented H2S detectors and antenna coaxial cable terminations for enhanced safety.
  • Managed Cathodic Protection system for storage tanks and underground pipelines.
  • Commissioned rectifier transformers and installed sacrificial anodes and KM test stations.
  • Conducted earthing system installations, testing, and commissioning for SCADA shelters and pipelines.
  • Contributed to Onshore Gas Development Project at Habshan Bab gas field, a joint venture of ADNOC and ADCO.

Graduate Apprentice trainee

Cochin Refineries Ltd.
Kerala, India
02.1992 - 05.1994
  • Completed two years at Cochin Refineries Ltd., including one year as Graduate Apprentice trainee.
  • Conducted load surveys for capacity expansion and feed pump unit projects.
  • Reviewed contractor drawings and documents to ensure compliance with specifications.
  • Supervised installation and commissioning of MCC and LPG pump house facilities.
  • Designed lighting systems for administration building expansion.
  • Prepared construction drawings and power requirements for contractors.
  • Maintained electrical equipment in 66/11KV substations and various turbo alternators.
  • Monitored cathodic protection systems for storage tanks and inspected loading stations.

Education

B.Tech - Electrical and Electronics engineering

Govt. Engineering College
Thrissur, Kerala

Diploma - Computer Applications

Arabian Computers
Kerala, India

Diploma - Electrical Transient Analysis Program

Systel Ltd
Chennai, India

Skills

  • Site Management Erection, Commissioning, Electrical Operations Process Continual Improvements Service Strategy Technology Transfer Value Engineering Leadership & Training
  • Electrical systems familiarity
  • Site inspection competence
  • Project scheduling
  • Basic computer skills
  • Construction methods
  • Construction management
  • Construction material procurement
  • Construction planning and team coordination
  • Construction safety compliance
  • Contractor management
  • Quality assurance and control
  • Contract progress reporting
  • Quantity surveys
  • Site management team supervision

PERSONAL DETAILS

Languages Known: Hindi, Malayalam and English

Accomplishments

    Accomplishments across the Projects.

  • Construction and commissioning of …
  • 11KV effluent water injection pumps in EWDP project. at North Kuwait
  • Commissioning of multiple number of 11KV substations for various projects
  • Construction and commissioning of Standby generator in GC-29, GC32 & EWDP.
  • Sea water injection pumps at SWTP North Kuwait
  • Gas compressor with 11KV motors, pony motors, fin fan motor coolers and scrubbers etc.
  • Crude export pumps and respective panel modification jobs.
  • Balance tank feed water pumps.
  • Instrument air and plant air compressor package for various projects.
  • TV GAS compressor package.
  • Effluent water booster pumps.
  • Various types of chemical injection packages.
  • GTG in In Sallah Gas project in Algeria.
  • Cathodic Protection for internal and external for storage tanks, crude tanks, fire water tanks.
  • VSD panels for condensate recovery package.
  • CP systems for trunk line, lateral line, flow lines in effluent water injection to injection wells.
  • CP systems for 40” pipe line from north Kuwait to south east Kuwait.
  • CP systems for 30” water line from Maqtha refinery to Habshan BAB gas field in Abu Dhabi in Onshore Gas Development Project.
  • CP systems for flow lines from gas wells in BAB gas field in Habshan in Abu Dhabi Onshore Gas Development Project.
  • SCADA systems panels for gas well heads in BAB gas field in Habshan in Abu Dhabi Onshore Gas Development Project.
  • Power factor correction capacitor banks.
  • UPS and battery systems of different capacity.
  • Heat tracing systems.
  • HVAC systems.
  • Attending Factory acceptance test (FAT) for project switch gear panels and Relay panels, transformers.
  • Review of vendor Site acceptance Test (SAT) documents and vendor mobilization schedule.
  • Conducting HSE risk assessment and preparation of job safety analysis (JSA) for electrical installations works thus issuing work permit systems. Preparation of SOC’s, etc.
  • Preparation of method statements for specified electrical activity and facilitates the formation of Inspection Test Reports (ITR’s).
  • Preparations and approval of RAM’s of non-critical materials and field inspections for buildings related electrical materials.
  • Control room electrification, UPS and battery.
  • BIDS systems and access control systems.
  • High security systems and PIDS systems, CCTV camera etc.

Timeline

Construction Manager (E&I)

Contracting com to ADNOC at Zirku Island, AbuDhabi
09.2024 - 08.2025

Construction manager

Al Ahelia Switchgear Company
11.2023 - 08.2024

Project Manager

Aaker Engineers and contractors India
07.2020 - 06.2022

Sr. Construction Superintendent

Petrofac International Ltd
09.2006 - 05.2020

Construction engineer

Equate Petrochemicals ( DOVE Chemicals )
04.2005 - 08.2006

Electrical Project Engineer

Bader Al Mulla Bros
08.2004 - 09.2005

Electrical Project Manager / Engineer

Al-Meer Technical Services Co WLL
11.2001 - 09.2004

Electrical Engineer

Dodsal Ltd
11.2000 - 09.2001

Electrical Engineer

Foster Wheeler Fired Heater Ltd
06.1998 - 04.1999

Electrical supervisor

Asahi Techneon LLC
01.1997 - 10.1997

Project engineer

Al Jahmali Trading and Contracting Co
05.1996 - 02.1997

Electrical supervisor

Consolidated Contractors International Company
05.1995 - 04.1996

Graduate Apprentice trainee

Cochin Refineries Ltd.
02.1992 - 05.1994

B.Tech - Electrical and Electronics engineering

Govt. Engineering College

Diploma - Computer Applications

Arabian Computers

Diploma - Electrical Transient Analysis Program

Systel Ltd
VYAS NELLIPARAMBIL SREEDHARAN