Summary
Overview
Work History
Education
Skills
Websites
LANGUAGES
Timeline
Generic

Walaa Mustafa

Dubai

Summary

Project & Quality Assurance Engineer with experience in MV & LV electrical panels for ABB and Schneider Electric certified panel builders. Proven track record in reducing costs (10–20%), boosting productivity (up to 25%), and delivering projects ahead of schedule. Successfully managed high-profile projects with Emaar, Hassan Allam, Concord, Egyptian Armed Forces, and major banks (NBE & Banque Misr). Recognized for strong leadership, quality assurance, and cross-functional collaboration

Overview

4
4
years of professional experience

Work History

Project Engineer

Elsewedy engineering industries
07.2024 - 08.2025

Project Engineer
Elsewedy Engineering Industries (ABB Panel Builder – MV & LV Electrical Panels)
6th of October, Giza, Egypt — July 2024 – Present

  • Schedule Improvement: Developed a new scheduling system that reduced time gaps between project phases.
  • Productivity Increase: Achieved a 25% increase in team productivity through improved time management and task allocation.
  • Quality Control System Implementation: Established an effective quality control system that decreased customer complaints by 40%.
  • System Integration: Enhanced departmental integration.
  • Crisis Management: Developed effective emergency plans that enabled quick responses during crises, minimizing their impact.
  • Teamwork Enhancement: Organized workshops to promote teamwork, leading to improved coordination between teams.
  • System Integration Improvement: Implemented new systems that facilitated smoother integration between different departments.
  • Safety Practices Enhancement: Promoted safety practices on-site, resulting in an excellent rating from regulatory authorities.

Key Projects:

  • Emaar – Parcel 5 & 6, North Coast: MV & LV electrical panels (design, assembly & commissioning).
  • Hassan Allam Projects – HAB Town, Luxor Logistics Hub, and multiple infrastructure projects in Upper Egypt.
  • Concord – Water Treatment Plants in Upper Egypt: MV & LV panels for water treatment and pumping stations.
  • Egyptian Armed Forces – Future of Egypt Project: Electrical panels for large-scale agricultural and infrastructure facilities.

project engineer

ALDAWLIA-IEC
03.2023 - 06.2023

Project Engineer
ALDAWLIA-IEC (Schneider Electric Certified Panel Builder – MV & LV Electrical Panels)
6th of October, Giza, Egypt — March 2023 – June 2023

  • On-Time Delivery: Successfully delivered projects on or ahead of schedule.
  • Cost Reduction: Reduced project costs by 10–20% through effective strategies.
  • Quality Improvement: Enhanced quality standards, resulting in fewer defects.
  • Efficiency Increase: Implemented new procedures that boosted operational efficiency.
  • Risk Management: Executed risk management plans that minimized project risks.
  • Improved Communication: Enhanced collaboration between teams, reducing mistakes.
  • Training Programs: Developed training programs that improved team skills.
  • Innovative Projects: Delivered innovative projects that generated higher returns.

Key Projects (Banking Sector):

  • National Bank of Egypt (NBE): Branches in Cairo and Giza – MV & LV electrical panels.
  • Banque Misr: Branches in Upper Egypt governorates – MV & LV electrical panels

Planning & Quality assurance engineer

ALDAWLIA-IEC
01.2022 - 02.2023

Planning & Quality Assurance Engineer
ALDAWLIA-IEC (Schneider Electric Certified Panel Builder – MV & LV Electrical Panels)
6th of October, Giza, Egypt — Jan 2022 – Feb 2023

  • Reduced project delivery times by 20% through a new project management strategy.
  • Improved cost estimation accuracy by 15%, ensuring better budget control.
  • Increased collaboration between design and production teams, cutting errors by 30%.
  • Led safety training programs that achieved zero workplace accidents over six months.

Education

Bachelor's degree - Mechatronics, Robotics, and Automation Engineering

6 October University
01.2020

Skills

  • Project Management Software (Microsoft Project, Primavera)
  • Design Software (eg, AutoCAD, SolidWorks)
  • Budget Management
  • Communication Skills
  • Team Collaboration
  • Risk Management
  • Planning and Scheduling

LANGUAGES

English
Arabic

Timeline

Project Engineer

Elsewedy engineering industries
07.2024 - 08.2025

project engineer

ALDAWLIA-IEC
03.2023 - 06.2023

Planning & Quality assurance engineer

ALDAWLIA-IEC
01.2022 - 02.2023

Bachelor's degree - Mechatronics, Robotics, and Automation Engineering

6 October University
Walaa Mustafa