Senior Electrical Engineer with 11+ years of intensive experience in construction, maintenance & operation. Responsible for Design & implementation of electrical LV & ELV systems. Dealing with the local authority (DEWA), supervising teams, testing and commissioning as well as analysing systems and components in construction. Experience with preparing electrical CAD drawings, Schedule Management, Cost Control/Cashflow Forecasting, Risk Management & Project Reporting.
Knowledge and strong relationships with major authorities, departments and field partners all over Dubai and the Northern Emirates, which enable to expedite crucial input data, certifications, and NOCs/permits
Spearheaded design and implementation of 1.5MWp+ hyprid solar systems, providing clean energy & reducing CO2 emissions.
Strong experience in GENERATORS operation in major development project – self energized
Handling electrical design and execution (as per local authorities regulations) as well as fire alarm system design.
Technical knowledge of Electrical systems (LV & ELV).
Deep technical know-how to audit, Implement, and Correct MEP design Drawings Deliver facilities and consistent engineering support for the operation of the property services.
Possessing Leadership personality and problem-solving behaviour to deal and coordinate with Clients and different project parties handling multi-disciplinary aspects.
Diagnosing problems and troubleshooting equipment.
- Reviewed concept/ design/ and construction technical documents, specifications for the project, and proposed redesign drawing of the electrical system & low currents system without affecting the basic system requirement of the project and Authority approval.
- Liaised with other disciplines to reduce risks and enhance process efficiency.
- Represented the company at meetings regarding the project and liaise with the Consultant and Local Authority.
- Built and maintained a robust electrical safety management program for the sites.
- Coordinated with other trades for the resolution of any clashes and conflicts.
- Monitored material & drawing submittal log, Electrical risk register, progress report, action list report, program schedule, and submission report.
- Selected Subcontractors and suppliers, to ensure that goods and services meet local standards and the site’s performance objectives.
- Evaluated the monthly payment certificate of electrical billing for the contractor, Ensured the proposed materials are in line with project specifications and Authority standards.
- Mentored junior Engineers and Technicians
- Managed the preparation of the supplier’s evaluation as per the manufacturer/supplier’s recommendation and best offer.
- Raised RFI for any discrepancy or lack of information from Authority Approved Drawings.
- Completed quality assurance on all electrical components and projects and writing up reports.
- Ensured all deadlines and budgetary requirements are met
- Followed up in project construction, Engineering & coordination, work progress, changes/ implications, as-built drawings, testing & commission, and project hand.
- Raised potential time cost impact report of variation to the Project Manager
- Oversaw electrical engineering goals and tasks performance, by reviewing and initiating electrical documents including IT and ELV systems, related to the project.
- Obtained Construction NOCs / Approved Drawings from concerned authorities (DEWA, ETISALAT, SIRA, RTA).
- Checked the activities on-site and provide the necessary reminders to the Project Director, Construction Manager and Planning Engineer for any immediate action.
- Supervised the production of coordination drawings to ensure that all services are coordinated with each other and the building structure is complying with the contract requirements.
- Ensured all builder’s works drawings are comprehensive and discussed with the various engineers for the best implementation and installation of services in coordination with other parties and the main contractor.
- Provided reminders, in advance, to the Project Director for any anticipated conflict that may happen in the future with respect to the simultaneous activities of all MEP trades and main contractors.
- Followed up on the status of material and shop drawings and kept all parties informed of the status and follow up on the implementation of the Client’s comments in a timely manner.
- Distributed detailed information, documents and regulations as applicable to all concerned parties and ensured their acknowledgement and adherence to its contents.
- Coordinated with the subcontractors; made sure all NOC/clearances are provided.
- At project close-out coordinated the production of as-built drawings to ensure they are delivered as per the contract requirements in terms of quality and time.
- Ensured As built drawing for Electrical System is as per the site installation
- Ensured Electrical services are undergone and pass the testing & commissioning
- Collected all warranty certificates related to Electrical System and ensured all are attached to the O & M Manual
- Stayed as DLP Engineer of the project during the Defects Liability Period.