Summary
Overview
Work History
Education
Skills
Certification
Software
Timeline
Generic

AHMED SALEH MOUSSA IBRAHIM

STAKEHOLDERS / INTERFACE MANAGER
Dubai,UAE

Summary

Looking for a challenging career opportunity to deploy my vast experience. More than 18 years’ experience in general construction for site works and design coordination for: Infrastructure and building activities. knowledge of the Building Information Modeling (BIM) process management having certificate from RICS Institute for BIM Project Management. experience in managing multi disciplines design and Construction works

Overview

1
1
Language
8
8
Certifications
6
6
years of post-secondary education
20
20
years of professional experience

Work History

Stakeholder Manager

Jacobs
UAE, Dubai and Northern Emirates
08.2016 - Current
  • Stakeholder Manager in Etihad Rail Program from Sep 2018 till date and R2020 Metro from Aug 2016 to Sep 2018
  • Stakeholder management, supporting internal project disciplines during coordination for interfaces with external stakeholders.
  • Maintain early engagement of stakeholders during different project stages, getting stakeholder requirements and make sure its incorporated in design, construction and handing over stages.
  • Initiate NOC strategy and obtaining approvals from related project stakeholders
  • Review NOC packages as per stakeholders requirements.
  • Coordinate with all authorities to obtain required NOCs for the project.
  • Support commercial discipline to reply to contractor’s claims related to stakeholder interfaces.
  • Support design team to incorporate stakeholder requirements in design and present the final design to stakeholders to obtain necessary approvals
  • Support risk management discipline for maintaining risk register for stakeholders’ issues and propose required mitigation.
  • Escalate stakeholders conflicts to client and advice best practise actions.
  • Initiate required project stakeholders NOC trackers, and project control dashboards
  • Design Coordination Role.
  • Design coordinator for power supply design packages for Metro, coordinating with Architectures, structures, MEP, High way, Utilities, Landscaping teams.
  • Design coordination for wet / dry utilities and producing cross sections fulfilling stakeholders corridors requirements.
  • Attending BIM meetings to resolve clashes for working in progress design models.
  • Coordinate with design teams for each discipline (roads, utilities, structure, Alignment, Traffic Diversion,.etc) to produce drawings as per authorities requirements to secure stakeholders approvals.
  • Resolved conflicts and negotiated mutually beneficial agreements between parties.

Senior NOC Engineer - Major Projects

Dubai Electricity & Water Authority, DEWA
Dubai
09.2008 - 08.2016
  • Responsible for issuing No Objection Certificate (NOC) for major Infrastructure projects road work, bridges, tunnels, islands, canals, networks, etc.
  • Studying, analyzing & reviewing all the drawings to identify the impacts of the proposed works on existing and future DEWA electricity and water networks, to take necessary actions to protect DEWA services.
  • Checking and reviewing the applicants’ submitted proposals to recognize whether it conforms to DEWA requirements for the appropriate protections or not.
  • Processing NOC to DEWA internal departments whenever required & coordinating with them for any technical discussions/issues.
  • Review shop drawings related to DEWA Betterment works submitted by the consultant to comparing them with the approved B.O.Q.
  • Review the comments received from the concerned department(s), to issue comments or approval to the party and/or concerned department.
  • Producing technical information sheets in order to render DEWA water/electricity services by using GIS system (Whenever, all records and maps with complete DEWA services facility network information are available.
  • Quality checking for novice engineers.
  • Providing technical support.
  • Conduct annual appraisal to engineers and prepare the reports for managers for their approval subject to KPI.
  • Participate in preparing training courses to NOC staff related to site activities (soil investigation, NDRC, network laying….etc).
  • Conducted research, gathered information from multiple sources and presented results.

Senior Civil Engineer

JT Metro JV, Red Line Metro
Dubai
05.2005 - 09.2008
  • Senior site engineer responsible for construction of cut and cover works, piling works, Rail structure, car park G+6 serving metro station (skelton/finishing works), cast in situ rail bridges, pre-stressing works cast in situ viaduct ramps, cast in situe - At Grade section and utilities protection/diversion works.
  • Kept project on schedule and within budget while serving as project leader.
  • Monitored execution of contract work for compliance with design plans and specifications.
  • Inspected project sites to monitor progress and adherence to design specifications, safety protocols and state sanitation standards.
  • Responsible for checking the construction schedules, planning activities, preparing the tentative quantities and the relevant estimations for subcontractors awarding works.
  • Provided technical and professional engineering support services in design, construction and traffic engineering.

Site Engineer

Capital Real Estate
Alexandria, Egypt, Egypt
08.2002 - 08.2005
  • Client representative for multi-stories buildings substructure and superstructure works including finishing/MEP
  • Established and implemented construction schedules, methods, equipment and labor requirements, using Gantt charts and MS Project.
  • Conducted project site visits to meet with construction staff, evaluate progress and discuss operational issues.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Supervised and monitored daily tasks of minimum 15 subcontractors.
  • Checked technical designs and drawings for adherence to standards.
  • Surveyed, graded and leveled 4 construction sites.
  • Prepare completed activities quantities for subcontractor payments

civil Engineer

National Lootah
08.2005 - 05.2006
  • Labor accommodation building 18nos.
  • Department: Building section, Site engineer for construction of 4 nos.
  • Building G+2 (Excavation, Footing, Shear walls, waterproofing and slabs).
  • Managing and using the tunnel form system for casting shear wall and slabs in the same time.
  • Responsible for finishing works for the same 4nos.
  • Buildings.
  • Prepare Shop drawings for concrete skeleton, CHB (block work), plaster, ceiling, marble, steel structure, granite tiles, external finishing (sand-stone) and revise the architecture work to comply with the structural work.
  • Shop drawings for mechanical work openings and sleeves for sub-contractor.
  • Preparing and updating the weekly schedule for the project.

Education

Bachelor of Civil Engineering -

Alexandria
09.1996 - 05.2002

Skills

Stakeholder communication

undefined

Certification

Training Courses.

Software

Navisworks

Microstation

Timeline

Stakeholder Manager

Jacobs
08.2016 - Current

Senior NOC Engineer - Major Projects

Dubai Electricity & Water Authority, DEWA
09.2008 - 08.2016

civil Engineer

National Lootah
08.2005 - 05.2006

Senior Civil Engineer

JT Metro JV, Red Line Metro
05.2005 - 09.2008

Site Engineer

Capital Real Estate
08.2002 - 08.2005

Bachelor of Civil Engineering -

Alexandria
09.1996 - 05.2002
AHMED SALEH MOUSSA IBRAHIMSTAKEHOLDERS / INTERFACE MANAGER