concept to completion timelines, budgets quality standards cross-functional teams technical specifications, drawings project documentation Key Projects Handled:
1. NANDILATH G-MART
Project Engineer
- Role: Designed the Single Line Diagrams (SLDs) and conducted thorough estimation and costing analysis to determine project budget and resource requirements, leading a sub-team for project execution.
- Procurement: Managed procurement of materials, leveraging strong negotiation skills to secure favourable rates and maintain cost-effectiveness .
- Vendor & Supplier Coordination: Collaborated with vendors and suppliers to ensure the timely delivery of materials and adherence to project timelines.
- Project Monitoring: Monitored project progress, identifying procurement-related issues and addressing them to ensure smooth execution.
- Location Management: Oversaw project execution across multiple locations in Kerala, maintaining effective communication with regional teams for seamless completion.
2. MY-G Project
Project Engineer
- Role: Designed SLDs for the project, ensuring alignment with project requirements and site conditions.
- Documentation & Approvals: Managed the complete documentation process , submitting necessary paperwork to government authorities (KSEI & KSEB) and securing all required approvals and certifications .
- Regulatory Compliance: Ensured all documentation complied with local regulations, facilitating smooth approval processes.
3. PRIME HEAL HOSPITAL
Project Engineer
- Role: Managed procurement of materials, including Distribution Boards (DBs) , conduits, and modular metal boxes for project initiation.
- Project Guidance: Led the implementation of the consultant's design, ensuring compliance with technical drawings and specifications.
- Ongoing Project: Currently managing various procurement and implementation activities for this ongoing project (2023).
4. KERALA WATER AUTHORITY (KWA) DAM Project
Project Engineer
- Role: Oversaw the Supply, Installation, Testing & Commissioning (SITC) of control panels for the operation of dam shutters and the associated cabling for motors.
- Coordination: Managed coordination between teams to ensure timely and efficient installation of critical systems.
- Testing & Commissioning: Played a key role in the successful commissioning of electrical systems for dam operations.
5. AJMAL BISMI Project
Project Engineer
- Role: Designed SLDs tailored to site conditions and optimized for project efficiency.
- Documentation & Approvals: Managed the preparation of project documents and drawings, coordinating with relevant authorities to secure all approvals and certifications .
- Project Approval: Ensured smooth charging of the project through effective follow-ups and approvals.
6. CEEYEN STONE CRUSHER
Project Engineer
- Role: Led the installation of a 1250 kVA transformer and complete cabling for the electrification of the crusher.
- Risk Management: Managed installation in high-risk environments (height-related challenges), ensuring safety standards by providing proper safety gear and overseeing employee safety during the installation.
7. REAF MALL
Project Engineer
- Role: Prepared the complete SLD for the mall's electrical infrastructure.
- Approvals: Managed procurement of all necessary sanctions and approvals , ensuring smooth project progression and regulatory compliance.