Summary
Overview
Work history
Education
Skills
References
Timeline
Generic
AKTAR ALI

AKTAR ALI

Ar Ruways,United Arab Emirates

Summary

Seasoned Welding & NDT Inspector with 10+ years of international EPC and offshore experience. Expert in RT, UT, MT, and QA/QC inspections, ensuring strict compliance with ISO 9712/PCN standards and delivering high-quality, safe project outcomes.

Overview

21
21
years of professional experience

Work history

Site Welding Inspector

Maire Tecnimont S.p.A
Ar Ruways, United Arab Emirates
2025.01 - 2026.03

Client : BOROUGE

Project : BOROUGE-4 (PO & 1-Hexene).

Company: Maire Tecnimont S.p.A (EPC Contractor)

BOROUGE /ADNOC Approved CV:

CISPA Pass Holder: ADNOC Onshore / Offshore Site Access


Key Responsibilities:

  • Welding Review & Witness Inspection
    Review and witness welding activities performed by subcontractor NSH to ensure compliance with EPC project specifications, international codes (ASME IX, AWS D1.1/D1.6, API 1104), and client requirements.
    Witness Non-Destructive Testing (NDT) including RT, UT, PT, MT to verify quality and acceptability of welds.
  • Flange, Pipe, and Joint Verification
    Inspect and verify flange alignment, bolting, and pipe fit-up prior to welding or assembly.
    Identify deviations and ensure corrective actions are implemented per EPC standards.
  • Documentation & Reporting
    Maintain accurate records of inspection observations, NCRs, weld maps, and test results.
    Review WPS (Welding Procedure Specifications) and PQR (Procedure Qualification Records) before execution.
  • Coordination & Compliance
    Coordinate with Technimont EPC engineers, subcontractor NSH teams, and client inspectors to resolve site welding and piping issues.
    Ensure adherence to EPC quality standards, safety requirements, and client specifications.
  • Client & Third-Party Support
    Support client inspections, audits, and final acceptance of welding activities.
    Ensure subcontractor workmanship aligns with EPC project requirements.

QC Welding Inspector

WAZEN OIL SERVICES
El Sharara oil field, Libya
2023.08 - 2024.11

CLIENT: AKAKUS OIL OPERATION

PROJECTS: PIPLE LINE & TANKS

Key Responsibilities:

  • Conducted welding inspections as per project specifications, ITPs, and international standards (ASME, AWS, ISO, API).
  • Verified WPS, PQR, and welder qualifications to ensure compliance with client requirements.
  • Monitored fit-up, root pass, filler passes, and final welds for structural, piping, and pressure vessels.
  • Performed dimensional and visual inspection of weld joints, fillet welds, butt welds, and repair welds.
  • Coordinated with client representatives ( Akakus Oil Operations) for weld inspection and final approval.
  • Reviewed material certificates, welding consumables, and ensured traceability of heat numbers.
  • Witnessed NDT activities (RT, UT, PT, MT) and evaluated results for weld acceptance.
  • Prepared daily welding inspection reports, welding summary logs, and inspection records.
  • Ensured compliance with HSE requirements during welding and fabrication activities.
  • Supported mechanical completion, punch list clearance, and RFI closure.

TPI- WELDING/NDT INSPECTOR

VERITAS-DOO
Murmansk, Russia
2023.05 - 2023.08

CLIENT: NOVA ENERGIES
PROJECT: Arctic LNG 2

Key Responsibilities:

  • Performed third-party welding and NDT inspections to ensure compliance with project specifications, ITPs, and international codes (ASME, AWS, ISO, API, EN standards).
  • Reviewed and approved WPS, PQR, and welder qualifications prior to production welding.
  • Conducted surveillance of welding activities including fit-up, preheat, inter-pass temperature, and final weld quality.
  • Witnessed and evaluated NDT activities (RT, UT, MT, PT) for weld acceptance as per project standards.
  • Verified material certificates, consumables control, and traceability of heat numbers.
  • Monitored fabrication of piping, structural steel, and pressure vessels for LNG facilities.
  • Ensured welding and NDT records were properly maintained and traceable.
  • Prepared detailed inspection reports, NCRs, and submitted to client for review and approval.
  • Coordinated with construction, QA/QC teams, and NOVA Energies representatives for inspection clearance and RFI approval.
  • Ensured strict adherence to Arctic LNG 2 HSE requirements during inspection and field surveillance.

NDT INSPECTOR

ZEROS GmbH
Wolfsburg West, Germany
2022.03 - 2023.04

CLIENT: Mitsubishi Power Europe Ltd.
PROJECT: Thermal Power Plant N2 HRSG. (Wolfsburg West)

Key Responsibilities:

  • Performed NDT inspections (UT, RT, MT, PT) on piping, pressure parts, and structural components of HRSG.
  • Ensured inspection activities complied with project specifications, codes, and client requirements.
  • Prepared and maintained NDT reports, logs, and test records for client approval.
  • Coordinated with QA/QC and Mitsubishi Power Europe representatives for inspection clearance.
  • Adhered to safety and quality standards during all testing activities.

NDT/Welding Inspector

EQS GLOBAL
Murmansk, Russia
2021.05 - 2021.11
  • CLIENT: SAIPEM
  • PROJECT: ArcticLNG2

TPI WELDING INSPECTOR

TURK LOYDU
Çanakkale Province, Turkey / China
2019.09 - 2021.03

CLIENT: DLSY JV
PROJECT: 1951 Canakkale Bridge

Key Responsibilities:

  • Conducted third-party welding inspections on structural steel and bridge components in China and Turkey.
  • Verified WPS, PQR, and welder qualifications as per project standards.
  • Monitored welding activities and ensured compliance with ISO, AWS, and EN codes.
  • Witnessed NDT (RT, UT, MT, PT) and prepared detailed inspection reports for client approval.

NDT RADIOGRAPHER

SafeRad Ltd. UK
Brunsbüttel, Schleswig-Holstein, Germany
2018.11 - 2019.08
  • CLIENT: APPLUS RTD
  • PROJECT: MDBU Project Covestro, Brunsbuttel.Germany

SR. QA/QC Welding Inspector

CSI Energy Group
Dar es Salaam, Tanzania
2017.08 - 2018.04
  • CLIENT: TOSHIBA / TANESCO
  • PROJECT: KINYEREZI II 240MW CCP POWER PLANT PROJECT

NDT RADIOGRAPHER

SafeRad Ltd. UK
Okpo, Geoje Island, South Korea
2015.11 - 2017.05
  • CLIENT : Daewoo Shipbuilding & Marine Engineering (DSME)
  • PROJECT : SHIPBUILDING & MARINE/ ICHTHYS PROJECT

NDT RADIOGRAPHER

SafeRad Ltd UK
Shetland Island, United Kingdom
2014.03 - 2015.06
  • CLIENT: TOTAL/PETROFAC
  • PROJECT: LAGGAN-TORMORE

NDT RADIOGRAPHER

SafeRad Ltd. UK
Leeds, United Kingdom
2012.06 - 2014.03

CLIENT: CAMERON/ONESUBSEA
PROJECT: OFFSHORE MANIFOLD TREES

Ø Using SafeRad Close Proximity Radiography

Key Responsibilities:

  • Performed radiographic inspections (CPR & Digital Radiography) on piping and pressure equipment as per project standards.
  • Ensured compliance with client specifications, codes, and quality requirements.
  • Evaluated radiographs, prepared reports, and submitted findings for client review.
  • Coordinated with QA/QC teams and client representatives for inspection clearance.
  • Maintained safety protocols during radiography operations in compliance with HSE standards.

NDT/QC WELDING INSPECTOR

Emirates Industrial Laboratory
Das Island, United Arab Emirates
2012.03 - 2012.05
  • CLIENT : ADGAS
  • PROJECT: TRAIN II SHUTDOWN

QC Welding Inspector

POWER-LITE INDUSTRIES INC- CANADA
Montreal, Quebec, Canada
2011.06 - 2012.02
  • CLIENT: GLOBAL
  • PROJECT: MANUFACTRING LIGHT POLLS

NDT Inspector

RUSSEL SMITH GROUP
Offshore, Nigeria
2011.03 - 2011.04
  • CLIENT: CHEVRON
  • PROJECT: OFFSHORE SHUTDOWN

QC Welding Inspector

3C Metal Middle East FZE
Dubai, United Arab Emirates
2009.08 - 2010.12
  • CLIENT: TOTAL ABK /WEATHARFORD
  • PROJECT: FABRICATION WORKS OF RIGS RELATED COMPONENTS LIKE MAST,SUBSTRUCTURE,X-MASS TREE,FUEL TANK,LP MUDSYSTEM

NDT-QC INSPECTOR

Global Energy Venture
Abidjan, Ivory Coast
2009.05 - 2009.07
  • CLIENT: CNR INTERNATIONAL
  • PROJECT: FPSO ESPOIR OFFSHORE SHUTDOWN

QC Coordinator

STFA MARINE CONSTRUCTION
Manifa , Saudi Arabia
2008.02 - 2009.02
  • CLIENT: SAUDI ARAMCO
  • PROJECT: MANIFA FIELD CAUSEWAY PROJECT. OFFSHORE

QC Welding Inspector

Descon Engineering
Das Island, United Arab Emirates
2007.11 - 2008.01
  • CLIENT: ADGAS
  • PROJECT: TRAIN I SHUTDOWN (2007)
  • ADGAS OPTIMA NO. 818969

QC Welding Inspector

COSTAIN ABU DHABI WLL
Das Island, United Arab Emirates
2005.05 - 2007.05
  • CLIENT: ADGAS
  • PROJECT: TRAIN I/II/III SHUTDOWNS (2005-2007)
  • ADGAS OPTIMA NO. 810676

Education

Diploma In Mechanical Engineering - Mechanical Engineering Technology

Institute Of Mechanical Engineering
Mumbai. India

Skills

    Welding & NDT (RT, UT, MT, VT) QA/QC Compliance EPC & Offshore Projects Subcontractor Management ISO 9712 / PCN Standards ✅

References

References available upon request.

Timeline

Site Welding Inspector

Maire Tecnimont S.p.A
2025.01 - 2026.03

QC Welding Inspector

WAZEN OIL SERVICES
2023.08 - 2024.11

TPI- WELDING/NDT INSPECTOR

VERITAS-DOO
2023.05 - 2023.08

NDT INSPECTOR

ZEROS GmbH
2022.03 - 2023.04

NDT/Welding Inspector

EQS GLOBAL
2021.05 - 2021.11

TPI WELDING INSPECTOR

TURK LOYDU
2019.09 - 2021.03

NDT RADIOGRAPHER

SafeRad Ltd. UK
2018.11 - 2019.08

SR. QA/QC Welding Inspector

CSI Energy Group
2017.08 - 2018.04

NDT RADIOGRAPHER

SafeRad Ltd. UK
2015.11 - 2017.05

NDT RADIOGRAPHER

SafeRad Ltd UK
2014.03 - 2015.06

NDT RADIOGRAPHER

SafeRad Ltd. UK
2012.06 - 2014.03

NDT/QC WELDING INSPECTOR

Emirates Industrial Laboratory
2012.03 - 2012.05

QC Welding Inspector

POWER-LITE INDUSTRIES INC- CANADA
2011.06 - 2012.02

NDT Inspector

RUSSEL SMITH GROUP
2011.03 - 2011.04

QC Welding Inspector

3C Metal Middle East FZE
2009.08 - 2010.12

NDT-QC INSPECTOR

Global Energy Venture
2009.05 - 2009.07

QC Coordinator

STFA MARINE CONSTRUCTION
2008.02 - 2009.02

QC Welding Inspector

Descon Engineering
2007.11 - 2008.01

QC Welding Inspector

COSTAIN ABU DHABI WLL
2005.05 - 2007.05

Diploma In Mechanical Engineering - Mechanical Engineering Technology

Institute Of Mechanical Engineering
AKTAR ALI