Dedicated HSE professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.
1- Project: R1015/5B- Various Improvements and
Implementing Quick Wins (Bur Dubai Area).
Industry: construction / infrastructure
Client: Dubai Roads and transport Authority (RTA).
Consultant: Al Turath Engineering Consultant.
Position: Project HSE Manager
Period: May 21 - Present
2- Project: ACCESS ROAD AND IMPROVEMTN OF EXSISTING ROAD
NETWORK TO DAMAC HILLS 2.
Industry: construction / infrastructure
Client: DAMAC .
Consultant: CDM Smith.
Position: Project HSE Manager
Period: Aug 22 – Present
3- Project: : R1028/2 DEVELOPMENT OF ALGERIA STREET.
Industry: construction / infrastructure
Client: Dubai Roads and transport Authority (RTA).
Consultant: ZUTARI Impact Engineering
Position: Project HSE Manager
Period: Nov 22 – Present
4- Project: : internal roads improvements at fujarah port.
Industry: construction / infrastructure
Client: SAMSUNG C & T.
Consultant: FICHTNER Engineering
Position: Project HSE Manager
Period: Nov22 – Present
1- Project: R1015/5B-Preposed Cycle Track Along Jumirah Beach.
Client: Dubai Roads and transport Authority (RTA).
Industry: construction / infrastructure
Consultant: CDM Smith.
Position: Project HSE Manager
Period: Aug 21 – April 22
2- Project: Road construction between Wadi Aal Qwar area and the link r road between Al Hibab R/A and Nazwa Road
Industry: construction / infrastructure
Client: Ministry of Presidential Affairs (MOPA)
Consultant: PARSONS Overseas Limited
Position: Lead HSE Engineer
Period: Aug 19 - May 21
1- Projects: AI Reem Residential Tower , Gate Towers ,
AI Meena Residential and commercial Towers
Industry : Construction / High Rise
Client: H.H Khalifa Foundation.
Consultant: DEWAN architects and engineers.
Position: Projects HSE Engineer
Period: Mar 16 – Feb 18
2- Project: H.H Al Ahbabi residential and commercial tower
Client: private
Industry : Construction / High Rise
Consultant: DEWAN architects and engineers
Position: HSE Engineer In-charge
Period: Mar 18– July 19
1- Project: AL Tarif Water Wells
Industry : Oil and Gas
Client: ADNOC
Consultant: N/A
Position: HSE Engineer
Period: Sep 15 – Mar 16