
MEP Project Engineer with 8 years of experience delivering over more than 20 projects on schedule, within budget, and to required specifications. Leads technical staff to execute scope, schedules, and quality standards.
1. MEP Engineering & Technical Coordination
* Spearheaded end-to-end MEP installations (Mechanical, HVAC, electrical, plumbing, FLS , LPG, IT & AV System) for high-end fit-out projects, including luxury villas and commercial restaurants.
* Managed complex commercial kitchen MEP requirements, including heavy-duty HVAC systems, dedicated kitchen ventilation, grease-rated exhaust ductwork, and kitchen hood requirements.
* Coordinated with Fire life-safety systems, including Firefighting works, Fire Alarm systems, emergency lighting, and LPG gas distribution systems.
2. Authority Approvals & Regulatory Compliance
* Managed the preparation, submission, and technical coordination of MEP drawings and compliance documents for critical regulatory authorities in Dubai, including Dubai Civil Defense (DCD), LPG DCD, and Dubai Municipality (DM) Food Control.
* Resolved technical comments and fast-tracked drawing approvals to prevent project delays and ensure seamless on-site execution.
3. Testing, Commissioning & Handover.
* Coordinated and witnessed comprehensive Testing and Commissioning (T&C) procedures for all MEP services in collaboration with all suppliers and subcontractors.
* Verified that HVAC balancing, Electrical Live Testing, Mechanical system pressure testing, and LPG safety checks met performance specifications and statutory standards prior to handover.
* Managed final project handovers to clients and facility management teams, ensuring all operation manuals, as-built drawings, and clearance certificates were delivered.
4. Quality Control, Snagging & DLP Management
* Conducted rigorous site inspections to identify construction and MEP defects, leading the snagging and rectification process to achieve zero-defect delivery.
* Managed post-handover operations and client relationships during the Defects Liability Period (DLP), promptly addressing maintenance calls and coordinating supplier warranties.
AutoCAD
HAP (Hourly Analysis Program) - HVAC Design.
MS Office
McQuay
Duct Designing - HVAC Design.
Electrical Design.
Plumbing Design.