Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic
MP SHAJUL ALI

MP SHAJUL ALI

MECHANICAL ENGINEER-WATER AND WASTE WATER
Dubai

Summary

CAREER SUMMARY A result oriented and self-motivated Mechanical professional with proven experience of 10 years in Water/Waste treatment, Desalination & MEP projects and advanced expertise in Thermal and Fluid Engineering. Skilled in negotiation. Managed cross department team of 30 peoples.

Overview

10
10
years of professional experience
5
5
Certifications
5
5
Languages

Work History

QA-QC ENGINEER/TOP ENGINEER

CHINA ENERGY ENGINEERING,
UMMUL QUWAIN 150 MIGD IWP SWRO Desalination plant Construction(FEWA & ACWA-NAQAA
06.2021 - Current

· Experienced in Design and Proposal Making for the RO Desalination plant

· Experience in design of reticulation networks,pump station,storage and treatment plants

· Good knowledge of consulting market

· Strong knowledge in hydraulics

· Experience across feasibility, outline, detailed design, construction support

· Have experience of using a 3D Design tool

· Hands on experience by giving Input into process and instrument diagrams, control philosophy and HAZOP reviews.

· Ensuring the project's compliance with the applicable codes, practices, policies, performance standards, and specifications.

· Planning and scheduling and of project and quality control activities for projects

· Review of Method statement,As built drawings and documents, procedure document

· Managing and performing inspection of water/waste water,MEP disciplines(Material inspection with client

· Generate client request for inspection and providing notice for witness and inspection points

· Review and approval of Quality procedure documents like Inspection test plans(ITP)

· Review and approval of inspection reports and updating in inspection matrix

· Control quality violation through toolbox meeting

· Issuing and Closing of NCR

· Review and track of material submittal

· NCR/Permit coordination,Civil Defence inspection coordination,BCC Permit coordination

· Review of OMIM documents and MRB

· Attending operation and warranty meetings & construction meeting

· Coordination and reporting to project management team regarding all progress in the sites

· Tracking and coordinating with subcontractors for closing of punch points

· Team member in Internal Audit for Quality as per ISO 9001:2015

DESIGN AND PROPOSAL ENGINEER

LANDEX GREEN ENVIRONMENT SOLUTION
DUBAI
11.2020 - 05.2021

· Experienced in DEWA Tender portal document submission(Invoice, RFX Submission)

· Well versed with Dubai Municipality rules for waste water related projects

· Experienced in EPR,WDS and Environmental Clearance documents submissions as per DM rules

· Experienced in MBR,MBBR,FAST,DAF,SBR Method of waste water treatments

· Experienced in Design and Proposal Making for the water, waste water, Irrigation, landscaping and swimming pool projects

· Preparations of RFQ

· Well versed with procurement and market price of water related equipment’s in UAE

· Expert Technical Knowledge of water/waste water infrastructure

· Lead preparation of detailed engineering calculations & analysis of mechanical systems

· Experienced in sewer projects

· Technical submittal. datasheet and compliance sheet preparation

· Ensuring the project's compliance with the applicable codes, practices, policies, performance standards, and specifications.

Preparations of Invoice and LPO

MEP PROJECT ENGINEER

MAZARI TECHNICAL WORKS
DUBAI
02.2020 - 10.2020

· Spearheaded multiple projects of MEP systems for high rise buildings and commercial buildings and Managed projects with individual budget of over 3 MILLION AED and ensured all technical and commercial and Regulatory terms have been met.

· Design knowledge of the MEP system (HVAC, Plumbing and electrical)as per the client requirement

· Well versed in DEWA regulations, Load schedules for MEP Projects

· Managing and performing inspection of MEP disciplines

· Generate client request for inspection and providing notice for witness and inspection points

· Review of Quality procedure documents like Inspection test plans

· Review and approval of inspection reports and updating in inspection matrix

· Control quality violation through toolbox meeting

· Closing of NCR

· Review and track of material submittal

· Inspect incoming material deliveries by confirming specifications and compliance with approved submittals, conduct visual and measurement tests in conjunction with the onsite logistics team

· Monitoring ELV systems and its cabling (access control, CCTV and Wifi) works.

· Monitoring of chilled water piping and Chemical flushing of chilled water piping and preparation of water report

· Experienced in Quality checking of GI and PI ducting and plumbing works installations(PPR,PVC Pipes)

· Experienced in procurement of materials and well versed with the prices of the same

· Experienced in MEP Fit out projects and Fit out permits and regulations

· Quality checking of MEP systems.

· Closing of punch points

· Coordinated Labors and resources throughout project life-cycle

Prepare weekly and monthly quality progress reports and periodic presentations to project management.


MECHANICAL ENGINEER-WATER &WASTE WATER

DYNAMIC ELECTRO MECHANICAL COMPANY
CALICUR
06.2012 - 01.2020

· Spearheaded multiple projects of mechanical designing and execution of WTP/WWTP systems for infrastructural and Industrial developments

· Managed more than 25 WTP/WWTP projects with individual budget of over 130,000 USD and ensured all technical and commercial and legal terms have been met.

· Coordinated employees and resources throughout project life-cycle

· Establishing field test methods and methods for monitoring the quality of those tests

· Expert Technical Knowledge of water/waste water infrastructure

· Well versed in Quality checking of water

· Experienced in using of Jar test apparatus, PH meter and Turbidity meter.

· Lead preparation of detailed engineering calculations & analysis of mechanical systems

· Supervise and supports the work of design/drafting technical staff.

· Lead Design build projects of water treatment plants

· Completed the water treatment project before schedule and under budget.

· Reviewing the engineering tasks and initiating the necessary corrective actions.

· Ensuring the project's compliance with the applicable codes, practices, policies, performance standards, and specifications.

· Hydraulic calculation for piping system

· Pump and Blower selection.

· Experienced in pressure sand filtration

· Planning and scheduling and of activities for projects.

Education

B.TECH - Mechanical Engineering

AWH Engineering college, Calicut University

Higher Secondary - undefined

Kendriya Vidyalaya No

M.TECH - Mechanical Engineering (Thermal and Fluid Engineering

LBS College of Engineering

No Degree -

Markaz English Medium School
04.2001 -

Skills

Analytical Skillsundefined

Accomplishments

  • Autocad2D certified by NORKA ROOTS, Govt of Kerala
  • Autodesk Revit
  • Successfully completed Internship programme at Mangalore Refinery And Petrochemicals Limited
  • Successfully completed one month training at Peekay Steel Castings Private Limited Company in kerala
  • Successfully completed ASNT Level 2 certification programme

Certification

PMP CERTIFICATION

Timeline

QA-QC ENGINEER/TOP ENGINEER

CHINA ENERGY ENGINEERING,
06.2021 - Current

DESIGN AND PROPOSAL ENGINEER

LANDEX GREEN ENVIRONMENT SOLUTION
11.2020 - 05.2021

MEP PROJECT ENGINEER

MAZARI TECHNICAL WORKS
02.2020 - 10.2020

MECHANICAL ENGINEER-WATER &WASTE WATER

DYNAMIC ELECTRO MECHANICAL COMPANY
06.2012 - 01.2020

No Degree -

Markaz English Medium School
04.2001 -

B.TECH - Mechanical Engineering

AWH Engineering college, Calicut University

Higher Secondary - undefined

Kendriya Vidyalaya No

M.TECH - Mechanical Engineering (Thermal and Fluid Engineering

LBS College of Engineering

PMP CERTIFICATION

AUTOCAD 2D

PRIMAVERA-P6

ASNT LEVEL II

REVIT-MEP

MP SHAJUL ALIMECHANICAL ENGINEER-WATER AND WASTE WATER