Adroit in managing assignments viz., Installation, Testing & commissioning, Operation & maintenance, troubleshooting of all the Electrical Equipment in Substation, Power plants, Oil and Gas as per various international/Customer standards (IEC, IEEE/SEC, DEWA, FEWA, ADNOC, TRANSCO)
Exposure in managing maintenance operations for reducing breakdown / downtime and enhancing operational effectiveness of equipment
Possesses in-depth knowledge of various standards used for different types of process industries like ADNOC
Overview
10
10
years of professional experience
1
1
Certification
Work History
Electrical Maintenance Engineer
China Machinery Engineering Corporation
09.2022 - Current
Scheduled and undertook periodic maintenance on all electrical installations, components and equipment.
Inspected equipment every week to maintain working order.
Maintained and fixed lighting and fixtures.
Performed energy audits and recommended alternative sources of energy for clients.
Working with following systems in TRANSCO / DHAFRAH: 400/33/0.40 KV Switching station
Preparing Isolation procedures for all the HV associated equipment’s such as HV breaker, Isolator, Transformer, LVAC, UPS, Capacitor bank, Emergency diesel generator
Preparing breakdown maintenance procedures for all the HV associated equipment’s such as HV breaker, Isolator, Transformer, LVAC, UPS, Capacitor bank, Emergency diesel generator
Preparing Operation and maintenance manuals for the HV equipment’s as per customer requirements
Follow up with the commissioning team for the handover/taken over documents
Preparing preventive maintenance checklists and submit for the customer approval
Preparing annual maintenance schedules for the each HV equipment’s as per OEM recommendation / customer requirements
Performing preventive maintenance for HV equipment’s such as 400kV AIS, 33kV GIS, 620MVA Step-up transformer, 415V Auxiliary transformer, Battery units, DC charger, Emergency diesel generator.
Preparing brief reports in case of any breakdown of the HV equipment’s and submit to the client for the review and follow-up with OEM for the rectification
Performing routine checklist for the each HV equipment’s daily basis.
Electrical Field Engineer
Sk Ecoplant Co Ltd
09.2021 - 09.2022
Worked with following systems in DEWA: 400/132KV & 132/11/0.415 KV Substations
To ensure the testing and erection activities of substation equipment’s (400KV GIS, 132KV GIS, 11KV Switchgears, LVAC Panels, Capacitor Banks) as per the IEC standards and DEWA specifications
Witnessed scheme checks, interlocks for 400KV GIS with various manufacturer –SIEMENS (8DQ1), ABB
Witnessed scheme checks, interlocks for 132KV GIS with various manufacturer – ABB (ELK-04,145) GE (F35), SIEMENS (8DN8 Enhanced)
Site Inspection for all electrical equipment including EHV, HV, MV & LV switchgear, Power and distribution transformer before starting of pre-commissioning and commissioning in order to make punch list for the construction team having categories (A, B, C)
To verify specifications of substation equipment’s against technical guaranteed particulars of DEWA
To verify documents and conduct inspection before start of activities
To follow the procedures of DEWA for carrying out the testing/erection activities
Witnessed scheme checks, interlocks for 11KV SWGR with various manufacturer – ABB (Unigear ZS1), NATUS, SIEMENS (Nx Airworld), EFACEC, and TAMCO
Witnessed 400/132KV GIS HV test and Sensitivity test
Witnessed SF6 Gas quality checks, CRM, CB, D/S, E/S timing test, Grid resistance and step/touch potential tests
To ensure safe work environment through contractor’s safety representative during testing/erection
Activities
Working with following systems in FEWA/ADNOC: 33/6.6/0.415 KV Substations
To follow the procedures of ADNOC, FEWA for carrying out the Installation/testing & commissioning activities
Preparing overall SAT schedules, schematic review and submitting for the approval from ADNOC/FEWA
Witnessed SAT activities of 120KVA UPS, 66KW DC charger commissioning
Witnessed scheme checks, interlocks for 33KV GIS SWGR with Siemens manufacturer 8DA10
Witnessed scheme checks, interlocks for 6.6KV with Hyundai manufacturer
Witnessed SAT activities 415V AC, DC distribution panels, 33KV Harmonic filters & capacitor bank
To conduct and perform Overall interlocks test of 400 KV Substation BAY and power plant switching devices (Breakers, earthing switch and isolator and MV incoming breaker) according to approved interlock matrix.
Director, Business Development ASEAN REGION at China Machinery Engineering CoorporationDirector, Business Development ASEAN REGION at China Machinery Engineering Coorporation