Skilled engineering professional specialising in building and optimising mechanical designs. Collaborates well across disciplines for successful development and implementation.
Overview
13
13
years of professional experience
6
6
years of post-secondary education
1
1
Certification
Work history
Project engineer
Al Sada Electrical Contracting Sole-Proprietorship
Abu Dhabi, UAE
2019.03 - Current
Participated in project site meetings to gather information and updates.
Improved building performance by implementing systems and controls.
Maximised profitability using smart design, lowering costs whilst maintaining high standards.
Established and maintained strong working relationships with stakeholders to review, improve and successfully achieve objectives.
Calibrated and maintained control systems for mechanical equipment.
Reviewed construction schedule to monitor progress and developments.
Calculated tolerances and loads to optimise mechanical designs.
Scheduled projects and resources to meet deadlines whilst achieving target spends.
Compared shop drawings against tender drawings of contractor to determine compliance.
Inspected completed equipment for compliance with codes, design specifications and quality standards.
Witnessed on-site testings to forecast issues and avoid problems.
Developed and refined preliminary design in line with architect project plans.
Composed technical clarifications to establish compatibility with design.
Organised and documented maintenance processes to meet long-term upkeep requirements of mechanical systems and equipment.
Applied mechanical knowledge to optimise equipment components for durability, cost, or ease of production.
Evaluated deviations in technical approach, keeping management apprised of issues.
Interpreted and translated building code and quality control regulations and requirements.
Assessed system proper operations and inspected facility equipment by conducting site walkthroughs.
Used Microsoft Word and other software tools to create documents and clear communications.
Used critical thinking to break down problems, evaluate solutions and make decisions.
Processed invoices and payment runs with complete accuracy.
Displayed energy and enthusiasm in fast-paced environment.
Completed duties to deliver on targets with accuracy and efficiency.
MEP engineer
AB TECH MEP CONTRACTING
CALICUT, INDIA
2017.06 - 2019.02
Developed and refined preliminary design in line with architect project plans.
Calibrated and maintained control systems for mechanical equipment.
Scheduled projects and resources to meet deadlines whilst achieving target spends.
Witnessed on-site testings to forecast issues and avoid problems.
Led root cause analysis to establish issues and identify prevention methods.
Prepare quotations against enquiries from consultant/architects/ individual clients
Total cost estimation of project, Basic design of swimming pool and water treatment plant
Preparation of bill of material, Specification as per client approval
Coordinate all plumbing and electrical work
Handing over the project to client, Providing AMC and Service of swimming pool If need
Mechanical engineer
AL-KADI TRUCK BODY FACTORY
DAMMAM, SAUDI ARABIA
2012.03 - 2014.03
Worked with AutoCAD to draft assemblies, models and technical drawings.
Design of Tipper Trailers, Flatbed and Low bed Trailers, Cement Bulkers and Tanker Trailers
Design of Pipe lines & Other Steel Work
Purchase of Truck & Trailer Spare Parts
Estimation of Budgeted Cost of the project
Visual inspection as per codes and standards
Preparation of Bill of Materials and control of material flow &purchase
Tailored project requirements and design specifications to client concepts.
Monitored project progress and identified operational concerns to limit delays and overspends.
MEP engineer
Trios Engineering Corporation
Ernakulam, India
2008.07 - 2012.03
Design of MEP Drawings for swimming pool, water features and water treatment Plant
Coordinate all plumbing and electrical works
Commissioning of swimming pool and water treatment plant
Supervise Annual Maintenance Cleaning and service of swimming pool
Scheduled projects and resources to meet deadlines whilst achieving target spends.
Witnessed on-site testings to forecast issues and avoid problems