Summary
Overview
Work history
Education
Skills
Languages
Accomplishments
Certification
Timeline
Generic
SIJIN  ALUKKATHARA BABURAJAN

SIJIN ALUKKATHARA BABURAJAN

ABUDHABI,UAE

Summary

I am a results-driven MEP Manager with over 12 years of extensive experience in overseeing Mechanical, Electrical, and Plumbing (MEP) systems across a diverse portfolio of projects. My background includes successfully managing MEP systems for indoor sports venues, gym facilities, and leading interior fit-out projects within the hospitality and high-rise building construction sectors.

With a proven track record, I have played a pivotal role in delivering projects for both local and international events, including notable contributions to the Mubadala Arena. In these endeavours, I consistently ensured strict compliance with regulations, codes, and standards, while concurrently optimizing operational efficiency.

Throughout my career, I have developed a versatile skill set encompassing project management, strategic planning, and leadership. I bring a commitment to excellence, having successfully completed projects that showcase my ability to navigate the complexities of MEP systems in diverse settings. My expertise extends to preventive maintenance program development, energy consumption monitoring, and the implementation of innovative, cost-effective solutions.

My international project experience underscores my adaptability and proficiency in managing projects on a global scale. As a dedicated MEP Manager, I am passionate about delivering optimal performance and efficiency in MEP systems, contributing to the overall success of construction and facility management projects.

Overview

9
9
years of professional experience
9
9
years of post-secondary education
1
1
Certification

Work history

Technical Manager-MEP

24x7 Facilities Management
Abu Dhabi
02.2021 - Current

Oversee the maintenance, operation, and repair of mechanical, electrical, and plumbing systems, including HVAC, electrical distribution, fire protection, plumbing fixtures, and related equipment.

Develop and implement preventive maintenance programs for MEP systems to minimize downtime, extend equipment lifespan, and ensure efficient operation.

Monitor energy consumption and implement energy-saving initiatives to optimize MEP system efficiency.

Stay updated with industry trends, advancements, and regulations related to MEP systems, ensuring compliance with local codes and standards.

Manage the MEP budget, track expenses, and optimize resource allocation to achieve cost-effective solutions.


Collaborate with procurement teams to source materials, equipment, and services required for MEP system maintenance and repairs.

Identify and engage external contractors, vendors, and service providers for specialized MEP system repairs, installations, or upgrades.

Develop and manage relationships with contractors, ensuring their adherence to safety protocols, quality standards, and project timelines.

Review and evaluate contractor proposals, bids, and performance to ensure alignment with project requirements and organizational objectives.

Ensure compliance with local regulations, building codes, health, and safety standards for MEP systems.

Conduct regular inspections and audits to identify potential hazards, maintenance needs, and non-compliance issues.

Develop and implement emergency response plans for MEP system failures or critical situations, ensuring occupant safety and minimal downtime.

Supervise a team of technicians or subcontractors responsible for MEP system maintenance and repairs.
Provide guidance, support, and training to team members, fostering a culture of safety, professionalism, and continuous improvement.

Conduct performance evaluations, set goals, and identify training needs to enhance the skills and capabilities of the MEP team.

MEP Project Engineer

AL KHAJA HOSPITALITY GROUP
DUBAI, UAE
11.2018 - 11.2020
  • Created detailed project schedules, working closely with contractors to manage deadlines.
  • Coordinated project resources, goals and activities, facilitating successful closure and handover.
  • Produced project progress reports for stakeholder reviews and meetings.
  • Reviewed designs, plans and reports to ensure constant compliance with project specifications.
  • Visited sites to check project progress and eliminate bottlenecks.
  • Checked client requirements and generated solutions from identified needs.
  • Executed quality assurance activities, checking project results against client requirements.
  • Enforced health and safety protocols to minimize accidents and injury.
  • Sourced cost-effective sub-contract elements to meet project resource requirements.
  • Scheduled projects and resources to meet deadlines whilst achieving target spends.
  • Management of Fit out works/project right from the conception to
    handling over.
  • Preparing electrical shop drawings and load schedules as per the
    authority rules and regulations (DEWA, SEWA, FEWA, and ADDC).
  • Responsible for establishing and maintaining an effective document
    control systems.
  • Ensuring that all design documentation is accurate, up
    to date and accurately distributed to relevant parties.
  • Dealing with sub-contractor and suppliers.
  • Prepare work schedule and progress report.
  • Supervise the fit out projects, coordinating and managing daily site
    activities.
  • Submitting the material samples and getting approval.
  • Contact the respective authorities to inspect and comment on the
    completed fit-out works for the issuance of occupancy certificate.

MEP engineer

Relience Technocrats Technical Services LLC
Dubai, UAE
06.2017 - 10.2018
  • Interpreted and translated building code and quality control regulations and requirements.
  • Composed technical clarifications to establish compatibility with design.
  • Reduced water usage by embracing dynamic building designs and HVAC frameworks.
  • Reviewed construction schedule to monitor progress and developments.
  • Monitored mechanical system final testing and commissioning to determine accuracy.
  • Assessed work of consultants and contractors to determine capability.
  • Maximised profitability using smart design, lowering costs whilst maintaining high standards.
  • Participated in project site meetings to gather information and updates.
  • Established and maintained strong working relationships with stakeholders to review, improve and successfully achieve objectives.
  • Developed and refined preliminary design in line with architect project plans.
  • Assessed system proper operations and inspected facility equipment by conducting site walkthroughs.
  • Collaborating with architects and other engineering disciplines to integrate MEP systems into the overall building design.
  • Creating detailed plans and specifications for mechanical, electrical, and plumbing systems.
  • Ensuring compliance with local building codes and regulations.
  • Coordinating with other engineering disciplines to ensure the seamless integration of MEP systems with the overall building structure.
  • Collaborating with contractors, subcontractors, and suppliers to facilitate the installation process.
  • Supervising the installation and commissioning of MEP systems.
  • Conducting site inspections to ensure compliance with design specifications and quality standards.
  • Resolving any issues or challenges that arise during the construction phase.
  • Creating and maintaining accurate documentation, including drawings, specifications, and project reports.
  • Keeping records of changes and modifications to the MEP systems during construction.
  • Collaborating with project managers to ensure that MEP components are delivered on time and within budget.
  • Participating in project meetings and providing regular updates on the status of MEP systems.

Electrical engineer

Oasis Investment Company (Al Shirawi Group)
Dubai, UAE
04.2015 - 05.2017
  • Continually improved methods and procedures for processes, measurement, documenting and work flow techniques.
  • Supervised technicians and craftspeople during projects.
  • Kept and updated records on all electrical design changes.
  • Created technical documentation to facilitate knowledge transfer within team.
  • Implemented preventive maintenance schedules for electrical equipment.
  • Supervised technicians in installing and maintaining MV, LV, and HV systems, overseeing safety and operational efficiency.
  • Developed methodologies for installing temporary and permanent electrical equipment in compliance with safety standards.
  • Conducted risk assessments for electrical installations, maintaining safety and reliability.
  • Assist in conducting regular site inspections to ensure that electrical installations comply with design specifications, safety standards, and local regulations.
  • Work closely with contractors and electricians to oversee the installation of electrical systems, ensuring they adhere to approved plans and quality standards.
  • Collaborate with other engineering disciplines, such as mechanical and plumbing, to ensure proper coordination and integration of electrical systems within the overall construction project.
  • Assist in the procurement and management of electrical materials and equipment.
    Coordinate with suppliers to ensure timely delivery of materials to the construction site.
  • Follow and enforce safety protocols to ensure a safe working environment.
  • Assist in identifying and mitigating electrical hazards on the construction site.
  • Support senior engineers in conducting tests and inspections to verify the functionality and performance of electrical systems.
  • Assist in the commissioning process to ensure systems meet design requirements.
  • Collaborate with the project team to identify and address any issues or challenges that arise during the construction phase.
  • Assist in implementing quality assurance measures to ensure the reliability and quality of electrical installations.
  • Attend project meetings and provide updates on the status of electrical installations.
  • Communicate effectively with the project team to address any concerns or issues.
  • Continuously learn and develop technical skills related to electrical engineering and construction practices.
  • Seek guidance and mentorship from senior engineers to enhance knowledge and expertise.
  • Ensure compliance with relevant electrical codes, standards, and regulations in all activities.
  • Provide general support to senior engineers and project managers as needed, contributing to the overall success of the construction project.

Education

Bachelor of Technology - Electrical &Electronics Engineering

MG University
INDIA
05.2008 - 05.2011

Diploma - Electrical Engineering

SBTE Kerala
INDIA
06.2005 - 05.2008

THSLC - electrical engineering

Technical high school kodungallur
India
06.2002 - 05.2005

Skills

  • High-value project management
  • Company process evaluation
  • Leadership
  • Versatile MEP Expertise
  • Regulatory Compliance
  • Preventive Maintenance
  • Energy Management
  • Budget Management
  • Resource Management
  • Industry Knowledge
  • Strategic Management
  • Innovative Solutions
  • Facility Management
  • International Project Experience
  • Communication Skills
  • Efficient Project Planning

Languages

English
Fluent
Hindi
Fluent
Malayalam
Native
Tamil
Intermediate

Accomplishments

Handled projects

o MUBADALA ARENA (G+2)– Zayed sports city Abu Dhabi.

o UAEJJ FITNESS CENTER- 5 Gyms (G+1) in Abu Dhabi, 1 in Dubai & Alain.

o The pizza company - Golden mile galleria, ADNOC petrol station

(Sharjah) , Dragon mart, Mushrif mall (Abu Dhabi)

o Hatam Restaurant -Nakheel mall

o Gloria jeans coffees - Nakheel mall, Masdar city center (Abu Dhabi) , Enoc petrol stations, Emarat petrol station, Mall of UAQ (Umm al Quwain )

o Al Safeer Restaurant-Ibn Battuta mall

o Fish and co Restaurant - Latifa tower (Dubai)

o SH Collection – Nation tower ( Abu Dhabi ,Ras al Khaimah

CONSTRUCTION

o G+12 FLOOR High rise building, Al qusais, Dubai.

o G+1 VILLA, Al warqa 1, Dubai

o Tiara United Towers (B3+G+50-Towers 2Nos).

Business bay, Dubai

o Prospect Heights G+F+7 Typical Residential Building (8nos) Tijara Town, Umm Nahad 3, Dubai

Certification

  • CFM Training (KHDA Approved)
  • NEBOSH IGC Training
  • Dubai Municipality/ DEWA
  • AUTOCAD-2D
  • Society of Engineers
  • DCD delegate License

Timeline

Technical Manager-MEP

24x7 Facilities Management
02.2021 - Current

MEP Project Engineer

AL KHAJA HOSPITALITY GROUP
11.2018 - 11.2020

MEP engineer

Relience Technocrats Technical Services LLC
06.2017 - 10.2018

Electrical engineer

Oasis Investment Company (Al Shirawi Group)
04.2015 - 05.2017

Bachelor of Technology - Electrical &Electronics Engineering

MG University
05.2008 - 05.2011

Diploma - Electrical Engineering

SBTE Kerala
06.2005 - 05.2008

THSLC - electrical engineering

Technical high school kodungallur
06.2002 - 05.2005
SIJIN ALUKKATHARA BABURAJAN