Being a MEP Coordinator, holding 19 Years of experience in multidiscipline Mechanical works (MEP Projects) in High Rise residential / Commercial buildings and Infrastructures works for 18 Years in UAE. My strong points encompass the ability to work both independently as well as in team, fine communication skills, healthy attitude towards professional challenges and enthusiastic to learn and explore new frontiers. I have got a strong zeal towards each and every enterprise of my career

Overview

20
20
years of professional experience
4
4
years of post-secondary education
4
4
Languages

Work History

MEP Coordinator

Bilt Middle East LLC
Dubai
03.2024 - Current
  • Enhanced building performance by troubleshooting and resolving complex MEP issues on-site during construction phases.
  • Managed subcontractor relationships effectively to ensure timely delivery of services while maintaining high-quality standards throughout the construction process.
  • Stayed abreast of industry advancements through continuous professional development, ensuring up-to-date knowledge on emerging technologies and design trends for application in future projects.
  • Collaborated with multi-disciplinary teams to achieve seamless integration of building systems while maintaining high aesthetic standards in architectural design elements.
  • Facilitated clear communication between clients, architects, engineers, contractors, and other stakeholders to ensure smooth project execution.
  • Boosted overall project quality with thorough review and analysis of MEP designs, ensuring code compliance and adherence to best practices.
  • Provided timely solutions to field conflicts arising from unforeseen site conditions or discrepancies in drawings by liaising with relevant parties involved in the project.
  • Optimized energy efficiency in buildings through careful selection of equipment and materials based on life-cycle cost analyses.
  • Ensured safety on job sites through strict adherence to regulations and implementation of hazard prevention measures during construction activities.
  • Developed comprehensive MEP specifications to guide construction teams in meeting project requirements accurately and consistently.
  • Managed budgets effectively, ensuring optimal allocation of resources for successful project completion within financial constraints.
  • Streamlined MEP coordination processes for timely completion of projects by implementing efficient scheduling techniques and monitoring progress regularly.

MEP Coordinator

Shapoorji Pallonji Mideast LLC
Dubai
01.2018 - 02.2024
  • Responsible for complete project installation and operation of the MEP systems
  • Manage the site operation and Technical Team on daily basis to meet the planned schedules
  • Liaise with the Client and Consultant to handover the project on time
  • Significant Achievements: Monitoring drawing/Material/Work conformances with provision as per specification & Authority regulations
  • Weekly Progress meeting with the client, consultant & subcontractors for the site progress updating with the management
  • Coordinating with subcontractors, Engineers and construction Manager to obtain the clearance before starting the works to ensure the smooth and efficient execution of works
  • Coordinating with the other services to obtain the work progress on the planned date & follow-up with the HSE regulation to avoid uncertainty on the work zone
  • Reporting to project manager and project directors for work progress
  • Work will be done as per tender documents, budget and handing over as per Client’s requirement
  • Coordination / follow-ups with authorities like DCD, DM, DEWA -WD & DEWA-ED for submission, final inspection and approval
  • Commencing Periodic meetings with the subcontractors, Engineers, Construction managers against the progress
  • Follow-up and evaluate the daily, weekly, and monthly progress reports

MEP Coordinator

Kier LLC
01.2015 - 06.2018
  • Responsible for the complete project installation & execution for both Building and Infrastructure
  • Liaise with the Client and Consultant to deliver the project in stipulated time frame
  • Significant Achievements: Discussing with consultant to solve problem such as co-ordination drawing, difficulties to implement as per approved drawing and solve the problem as soon as possible
  • Inspect completed installations and observe operation to ensure confirmation to design and specification
  • Ensure the activities as per approved drawing, specification, method of statement & coordinating with QA/ QC engineer to raise ITR for consultant inspection
  • Coordinating & Follow-up with subcontractors to obtain the progress against planned date
  • Reviewing the method statement, MAR before submitting & follow up consultant for approval
  • Regular monitoring the subcontractor allocation of work, site activities and review progress
  • Obtaining approval from DEWA ED for the Load schedule submission, LV & inspection approval
  • Material submission approval obtained from the consultant as well as from Authorities
  • Coordinating with the subcontractors to obtain the work as per the Authority requirement
  • Reviewing the Material submittal and Shop drawings before submitting for consultant approval

Sr. Project Engineer– Mechanical

Emirates Trading Agency LLC
01.2007 - 05.2015
  • Responsible for the Entire project completion works starting from Material ordering, Installation, Execution, Testing and commissioning of Mechanical systems
  • Significant Achievements: Reviewing & Submitting the Shop drawing against the design drawing for Air conditioning layout, Ventilation layout, Chilled water layout & BMS layout submission for consultant approval
  • Obtaining the approval for Technical /Material submittal from the consultant for the External static pressure calculation & Pump Head calculation
  • Reviewing the Material submittal and Shop drawings before submitting for consultant approval
  • Monitoring site activities, material at store, allocating work to site engineer & supervisor
  • Responsible for the complete execution, planning technical control, material delivery
  • Ensure the activities as per approved drawing, specification, method of statement & coordinating with QA/ QC engineer to raise ITR for consultant inspection
  • Maintaining Quality Assurance, Quality control and safety of the project
  • Follow-up and evaluate the daily, weekly, and monthly progress reports
  • Selection of Chilled water pipe sizing & selection of DRV’s, Valves and Strainers
  • Responsible for obtaining the approval for Technical submittal /Ordering the materials until the delivery of material at site
  • Responsible for the Execution of site works-project wide with the available resources & provide the daily manpower resources

Production Engineer– Mechanical

Mukund Industries
06.2005 - 09.2007
  • Responsible for the production and Erection of Air handling units and fan coil units as per the client requirements, related materials to be procured and delivered to the factory
  • Significant Achievements: Preparing the shop drawing for the production works as per the client requirement and approval
  • Materials ordering, delivery and storage to be monitored
  • Obtaining the orders from the client and furnish the revenue of the company
  • Arranging the subcontractors for the materials delivery and installation at the site
  • Procurement of Cooling coils, Fans and Motors from the nominated suppliers
  • To ensure and maintain the quality by doing the routine inspection with the production team of the production materials

Education

B.E. - Mechanical

ANNA University
01.2001 - 05.2005

Skills

Team Building & Leadership Correspondence preparation Timely Notification to Consultant for variation works Project completion against the allocated Budget value Avoid the delays and mitigate Presentation against the work progress

Health and safety compliance

As-built documentation

AutoCAD proficiency

Documentation control

Scheduling and planning

Type of visa

Employment

Driving license

Automatic D/L

Personal Information

  • Date of Birth: 10/29/83
  • Marital Status: Married

Passport details

B-9104308

Timeline

MEP Coordinator

Bilt Middle East LLC
03.2024 - Current

MEP Coordinator

Shapoorji Pallonji Mideast LLC
01.2018 - 02.2024

MEP Coordinator

Kier LLC
01.2015 - 06.2018

Sr. Project Engineer– Mechanical

Emirates Trading Agency LLC
01.2007 - 05.2015

Production Engineer– Mechanical

Mukund Industries
06.2005 - 09.2007