Seeking a challenging civil engineering role in an innovative organization focused on precision. Expertise in infrastructure development combined with a commitment to enhancing managerial skills. Aiming to contribute to large-scale projects, including metro and urban infrastructure, while engaging in strategic planning and decision-making processes.
Overview
12
12
years of professional experience
4
4
years of post-secondary education
Work history
Engineer Dubai Metro Blue Line Iconic Station.
Atkin's Realis
Dubai, UAE
2025.12 - Current
Reviewed shop drawings of station building for compliance with project specifications.
Assisted contractor in understanding requirements before work commencement.
Ensured clarity in project specifications to support construction processes.
Monitored progress and daily site activities.
Checked rebar formwork and concrete at site.
Raised observations.
Ensured adherence to safety rules at site.
Site Inspector KS (Consultant)
Consulting Engineer’s Group Ltd
Nagpur, Maharashtra
2024.07 - 2025.12
Assessment and giving consent to Initial & Detailed work programme and Method Statements as per Contract conditions.
Ensure quality & safety works at site as per the contract agreement, method statement, design drawings.
Preparation & Issue Non-Confirmation Report (NCR) & Construction surveillance report (CSR) to the Contractor.
Supervision of Execution of Station Building Works, Structural and finishing Works.
Supervision Execution of Open foundation, Pile, Pier and Pier Cap.
Assessment and giving consent to vendors submissions for approval as per Contract conditions.
Monitoring of day-to-day activities at site.
Responsible for checking and signing of RFIs, test reports and other documents related to site activities.
Responsible for maintaining of safety and quality standards at site.
Review of daily and monthly progress reports.
Project (Elevated): Name of work: Design and Construction of Elevated Metro Viaduct of length 17.624 km between Ch. 21256.814 to Ch. 38881.7 including Railway spans of length 79m & 100m and a 6-lane Double decker portion with Vehicular Underpass (VUP) from Ch.25755.211 to Ch. 26895.211 for a total length of 1.14km in Reach-1A of NMRP Phase-2
Client: Maharashtra Metro Rail Corporation Ltd.
Consultant: AECOM – SYSTRA – CEG
Contractor: GR Infra Project Limited
Project Cost: 950 Cr.
Site Inspector Interchange Metro Station K5 (Consultant)
Consulting Engineer’s Group Ltd
Pune, Maharashtra
2021.03 - 2024.06
Conduct site inspections to evaluate structural integrity and identify risks.
Support monitoring of structural work progress on-site, ensuring compliance with designs and quality standards.
Help contractors and subcontractors resolve structural issues during construction.
Review method statements and approve shop drawings related to structural works.
Conduct assessments and recommend modifications for structural improvements.
Prepare documentation and reports related to structural engineering activities.
Act as a liaison for project teams and clients, addressing structural queries promptly.
Sr Engineer
JK Prestressing Pvt Ltd
Bangalore, Karnataka
2018.01 - 2021.02
Assisted in post-tensioning operations for viaduct spans, pier arms, transition girders, portal beams and concourse girders.
Supported drawing reviews and documentation for stressing activities, including preparation of paperwork and quality checks on-site.
Coordinated with consultants to ensure project progress, quality, and approvals aligned with timelines.
Implemented checklists based on method statements and working drawings for compliant execution.
Helped generate daily, weekly, and monthly progress reports reflecting site status and milestones achieved.
Structure Engineer
Agroh Infrastructure Pvt Ltd
Una, Gujarat
2015.09 - 2017.12
Construction of Major and Minor Bridge, Pipe culvert and PQC.
Supervision of construction activities in compliance with contract specifications and technical drawings.
Quality control and material testing to ensure adherence to MORTH standards.
Quantity estimation, work verification, and progress monitoring.
Coordination with contractors and consultants for timely execution and issue resolution.
Preparation of daily and monthly progress reports aligned with project milestones.
Project – Four-Laning of NH-8E (Package-IV) | NHDP Phase-IV Project Title: Four-Laning of Kagavadar to Una section of NH-8E
Client: Artefact Projects Ltd.
Contractor: Agroh Infrastructure Pvt Ltd.
Jr Engineer
Siwansi Concrete Products
Etawah, UP
2014.07 - 2015.08
Assisted in ensuring quality assurance of precast and cast-in-situ concrete products according to industry standards and client specifications.
Supported routine inspections and laboratory testing of raw materials and finished concrete elements to uphold product integrity.
Aided in maintaining quality documentation including test reports, inspection records, and corrective action logs.
Collaborated with production and site teams to apply quality control measures and enhance operational efficiency.
Facilitated client inspections and audits, ensuring preparedness and compliance with quality benchmarks.
Education
B.Tech - Civil Engineering
UPTU Lucknow
UP
2010.01 - 2014.01
Intermediate - 10+2
CBSE Board
Highschool - 10th
CBSE Board
Languages
English
Proficient (C2)
Timeline
Engineer Dubai Metro Blue Line Iconic Station.
Atkin's Realis
2025.12 - Current
Site Inspector KS (Consultant)
Consulting Engineer’s Group Ltd
2024.07 - 2025.12
Site Inspector Interchange Metro Station K5 (Consultant)